Question 60
A network rollout needs separate hub-and-spoke overlays for two regions but the administrator uses one shared encryption and region naming plan without segmentation. Which change most directly resolves the stated engineering problem?
Explanation
Correct Answer
This addresses the specific failure: the deployment lacks boundaries between regions that require separate routing and administration. Confirm the repair by checking that each branch forms tunnels only with its authorized regional hubs under expected route policy.
Incorrect Answers
“Select the approved BGP AS and neighbor policy in the region's overlay design before deployment” targets this technical condition: The default autonomous system choice conflicts with the customer routing plan. The reported fault is: A network rollout needs separate hub-and-spoke overlays for two regions but the administrator uses one shared encryption and region naming plan without segmentation. The more direct correction is “Build independently scoped regional overlay templates with approved endpoint, address and policy separation”, because the deployment lacks boundaries between regions that require separate routing and administration.
“Correct hub role assignments and regenerate the affected region's template output under change control” targets this technical condition: The topology generator is working from incorrect device-role inventory. The reported fault is: A network rollout needs separate hub-and-spoke overlays for two regions but the administrator uses one shared encryption and region naming plan without segmentation. The more direct correction is “Build independently scoped regional overlay templates with approved endpoint, address and policy separation”, because the deployment lacks boundaries between regions that require separate routing and administration.
“Permit the required approved management connectivity from the branch to FortiManager” targets this technical condition: An intermediary network control blocks the central management control path. The reported fault is: A network rollout needs separate hub-and-spoke overlays for two regions but the administrator uses one shared encryption and region naming plan without segmentation. The more direct correction is “Build independently scoped regional overlay templates with approved endpoint, address and policy separation”, because the deployment lacks boundaries between regions that require separate routing and administration.