Question 40
At Brookfield Financial Systems, an authorized infrastructure engineering team manages a Terraform 1.12 and HCP Terraform environment. The team encounters the following situation: a deployment operator cannot predict which load balancers will be replaced by a proposed change. Choose the technically best Terraform Associate 004 practice response to this particular infrastructure case. Which operational control addresses the risk long term?
Explanation
Correct Answer
Make saved-plan review part of sensitive deployment approvals. This control addresses plan before modifying production because infrastructure-as-code workflows can expose intended creates updates and destroys before execution. The original implementation remedy remains: Generate and review a Terraform execution plan before approving apply.
Incorrect Answers
“Include capacity and cost review gates for high-impact changes” addresses a different recurring failure: A declarative plan makes infrastructure changes inspectable early even though exact charges depend on usage. For the condition in this question, maintain “Make saved-plan review part of sensitive deployment approvals” because infrastructure-as-code workflows can expose intended creates updates and destroys before execution.
That review protects the control associated with: Terraform's dependency graph is based on references rather than filename ordering. It does not directly prevent the stated recurrence, which concerns: Infrastructure-as-code workflows can expose intended creates updates and destroys before execution. The appropriate guardrail is “Make saved-plan review part of sensitive deployment approvals”.
This safeguard is for the dependency described by: Tuple types can require fixed positions with different element types. The continuing risk here is determined by: Infrastructure-as-code workflows can expose intended creates updates and destroys before execution. The targeted safeguard is “Make saved-plan review part of sensitive deployment approvals”.