Question 170
In a separate simulated logistics environment, an inexpensive HMI drives a high-consequence pump and is excluded from priority review. What change should the security architect propose?
Explanation
Correct Answer
In a separate logistics environment, an inexpensive HMI drives a high-consequence pump and is excluded from priority review. Rank assets against documented safety, environmental, operational and recovery consequences with process-owner input.
Incorrect Answers
Include engineering stations and their authentication, tooling and controller-write pathways in the scoped architecture. That could matter for engineering-workstation inclusion; it does not settle the problem that in a separate logistics environment, an inexpensive HMI drives a high-consequence pump and is excluded from priority review.
The proposed step addresses shared utility dependencies: Include shared utilities, timing and authentication dependencies when defining risk assessment boundaries. The issue here is in a separate logistics environment, an inexpensive HMI drives a high-consequence pump and is excluded from priority review.
Require time-bounded registration, approved access paths and removal evidence for temporary IACS equipment. That addresses temporary maintenance connections, whereas in a separate logistics environment, an inexpensive HMI drives a high-consequence pump and is excluded from priority review.