Question 50
During a fictional cross-border network-security incident, an assessment scores a boiler controller outage without consulting the protective instrumented system team. Which trend should trigger renewed investigation?
Explanation
Correct Answer
Reassess interlocks and independent protection assumptions after safety-system modifications. An assessment scores a boiler controller outage without consulting the protective instrumented system team.
Incorrect Answers
Reconcile lifecycle deliverable status at each project-to-operations handover. That could matter for security lifecycle phase context; it does not settle the problem that an assessment scores a boiler controller outage without consulting the protective instrumented system team.
Compare passive discovery changes with approved work orders and investigate unrecognized new assets. That addresses passive inventory discovery, whereas an assessment scores a boiler controller outage without consulting the protective instrumented system team.
This alternative relates to cyber criticality of assets: Revisit criticality after process capacity, safety or operating-mode changes. The present difficulty is that an assessment scores a boiler controller outage without consulting the protective instrumented system team.