Question 740
During a fictional coastal network-security incident, a final report provides vulnerability rankings without recording which outstations were excluded. Which validation is needed before this change is approved?
Explanation
Correct Answer
A final report provides vulnerability rankings without recording which outstations were excluded. Obtain asset-owner agreement before presenting partial coverage as enterprise-wide assurance.
Incorrect Answers
Follow confidential process-data handling and privacy rules before exporting plant evidence. That could matter for evidence preservation and integrity; it does not settle the problem that a final report provides vulnerability rankings without recording which outstations were excluded.
Avoid invasive confirmation where process safety or contractual access does not permit it. That addresses assumptions and uncertainty log, whereas a final report provides vulnerability rankings without recording which outstations were excluded.
This alternative relates to zone and conduit drawing handover: Establish change-control owners and distribution permissions before releasing detailed drawings. The present difficulty is that a final report provides vulnerability rankings without recording which outstations were excluded.