Question 440
An enterprise is still failing to satisfy this requirement: A penetration test documents a critical weakness but does not retest the application after remediation. Which underlying gap must be corrected before this risk is treated?
Explanation
Correct Answer
The appropriate security response is: Require documented corrective actions and independent verification of the repaired behavior. Security assessment closure requires evidence that material weaknesses were corrected. The corrected outcome is: Follow-up tests reproduce the original exploit conditions and confirm the weakness is no longer exploitable.
Incorrect Answers
“Selective reporting overstated the assurance supported by incomplete testing” addresses an adjacent control. The reported case is: An enterprise is still failing to satisfy this requirement: A penetration test documents a critical weakness but does not retest the application after remediation. The case-matched answer is “Remediation status was inferred from a ticket closure rather than security retesting”.
“Auditors were incorrectly treated as operators of the controls they review” addresses an adjacent control. The reported case is: An enterprise is still failing to satisfy this requirement: A penetration test documents a critical weakness but does not retest the application after remediation. The case-matched answer is “Remediation status was inferred from a ticket closure rather than security retesting”.
“Testing effort was prioritized by raw finding volume rather than coverage of material risk” addresses an adjacent control. The reported case is: An enterprise is still failing to satisfy this requirement: A penetration test documents a critical weakness but does not retest the application after remediation. The case-matched answer is “Remediation status was inferred from a ticket closure rather than security retesting”.