Question 1090
At Pinecrest Research, an architecture review of research data exchange across laboratories and regional compute clusters is underway during a scheduled network modernization (DES-3-31-2). The review is led by the research networking team. The documented design gap: a large language model suggests a routing policy command not supported by the installed network operating system. The solution must proceed without exposing unrelated application failure domains. Which ongoing architecture control best reduces recurrence of this gap?
Explanation
Correct Answer
The ongoing design assurance control is: Regression-test generated configuration against capability inventories and approved templates. It is targeted at the documented risk: a large language model suggests a routing policy command not supported by the installed network operating system. The immediate design change is: Require schema-aware command validation and human approval before any generated network change. In subsequent reviews, validate recurrence prevention with: An unsupported proposed route-map is rejected with no change to live devices. Applied here, the relevant facts are: a routing policy command not supported by the installed network operating system. The solution must proceed without exposing unrelated application failure domains.
Incorrect Answers
This safeguard maintains a different technical control: The ongoing design assurance control is: Re-profile model communications and network headroom when accelerator density grows. The recurring risk here is governed by: The ongoing design assurance control is: Regression-test generated configuration against capability inventories and approved templates. The relevant review is “Regression-test generated configuration against capability inventories and approved templates”.
“Run permission-boundary tests for network knowledge-base updates” is a sensible check for: The ongoing design assurance control is: Run permission-boundary tests for network knowledge-base updates. It is not the prevention measure for the current dependency: The ongoing design assurance control is: Regression-test generated configuration against capability inventories and approved templates. The closer guardrail is “Regression-test generated configuration against capability inventories and approved templates”.
The alternate safeguard protects a separate dependency: The ongoing design assurance control is: Verify route scale and worst-case deaggregation against device profiles before new site additions. For this failure the continuing exposure is: The ongoing design assurance control is: Regression-test generated configuration against capability inventories and approved templates. Maintain “Regression-test generated configuration against capability inventories and approved templates” instead.