Question 850
A company deploys primary and secondary identity services but does not verify SRX fallback configuration before maintenance disconnects the preferred JIMS endpoint. Once the issue is resolved, which ongoing practice BEST prevents this type of failure?
Explanation
Correct Answer
A lasting control should detect the original error before release. Monitor JIMS endpoint health and review failover credentials and certificates after server replacement. That is important in this case because identity service availability depends on supported fallback reachability and authentication settings, not only having two server installations. The scenario was: A company deploys primary and secondary identity services but does not verify SRX fallback configuration before maintenance disconnects the preferred JIMS endpoint.
Incorrect Answers
A missing identity mapping cannot satisfy an identity-based authorization condition and needs an explicit approved fallback decision. Here, identity service availability depends on supported fallback reachability and authentication settings, not only having two server installations.
Audit identity source freshness and user-to-IP mapping updates whenever DHCP, NAC or authentication infrastructure changes. That concerns JIMS user-to-IP mapping source, while the issue here is JIMS primary and backup server failover. Configure an approved primary and supported secondary JIMS source on the SRX and rehearse a controlled primary outage.
Synchronize clocks and audit retention requirements across directory, identity service and SRX logging systems. Here, identity service availability depends on supported fallback reachability and authentication settings, not only having two server installations.