Question 60
A new enterprise analytics scenario states: A data engineering team needs to alert when a PySpark job's duration exceeds its historical p95, even if the job succeeds. Which change is most appropriate?
Explanation
Correct Answer
Performance regressions may not surface as failed jobs. The selected action directly addresses the stated constraint. The decisive acceptance result would be: A controlled slow run produces an alert while normal variability does not overwhelm the team.
Incorrect Answers
Refresh scheduling should reflect data dependency rather than independent clock times. That is not sufficient here: Performance regressions may not surface as failed jobs.
A running pipeline is not the same as current data. That is not sufficient here: Performance regressions may not surface as failed jobs.
Correct data can still violate operational SLAs due to regressions. That is not sufficient here: Performance regressions may not surface as failed jobs.