Question 300
At Pinecrest logistics, in a sandbox Kubernetes cluster during a recovery tabletop exercise: A Kubernetes operator named dispatch-operator is installed in namespace fulfillment; verify controller and CRD presence before relying on custom resources. Work only within the stated target and verify before declaring success. Which operational control most directly prevents this failure or configuration drift?
Explanation
Correct Answer
Monitor operator controller availability and CRD conversion compatibility across upgrades. This reduces recurrence of the specific operational failure. It reinforces the action: Run kubectl -n fulfillment rollout status deployment/dispatch-operator and kubectl get crd dispatches.example.test. The relevant mechanism is: Custom resources are reconciled only when their schemas are registered and the operator controller is healthy.
Incorrect Answers
The suggested review tracks a different technical risk: A Namespace supplies a scope for namespaced resources while its metadata labels support policy and inventory selectors. Here the sustained control must address: Custom resources are reconciled only when their schemas are registered and the operator controller is healthy. Choose “Monitor operator controller availability and CRD conversion compatibility across upgrades”.
This routine guards against another mechanism: The snapshot-status tool inspects backup metadata without modifying the running etcd member or performing a restore. The recurring exposure in the current case is: Custom resources are reconciled only when their schemas are registered and the operator controller is healthy. The matching preventive check is “Monitor operator controller availability and CRD conversion compatibility across upgrades”.
The suggested review tracks a different technical risk: Cordon marks a Node unschedulable to new Pods but does not drain running workloads. Here the sustained control must address: Custom resources are reconciled only when their schemas are registered and the operator controller is healthy. Choose “Monitor operator controller availability and CRD conversion compatibility across upgrades”.