McAfee Secure

Exam Code: CCP

Exam Name: Certified CMMC Professional

Certification Provider: Cyber AB

Corresponding Certification: Certified CMMC Professional

Cyber AB CCP Questions & Answers

Study with Up-To-Date REAL Exam Questions and Answers from the ACTUAL Test

201 Questions & Answers with Testing Engine

"Certified CMMC Professional Exam", also known as CCP exam, is a Cyber AB certification exam.

Pass your tests with the always up-to-date CCP Exam Engine. Your CCP training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Cyber AB CCP Practice Test 14

Question 130

At fictional Frostline Research — Case 026, the team is performing a CUI handling workflow change for its CUI collaboration workstream at the internal risk committee. The observed evidence is: A project team routes government-marked CUI through an unassessed personal chat service because participants believe a confidentiality notice alone is sufficient. The confirmed underlying issue is: The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The immediate issue was handled and the control owner is planning recurrence prevention. Which sustainable organizational safeguard BEST reduces recurrence of the same failure?

  1. For the CUI collaboration workstream at Frostline Research — Case 026, require documented source-owner CUI determination and reconciliation when markings or contractual instructions conflict.
  2. For the CUI collaboration workstream at Frostline Research — Case 026, maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible.
  3. For the CUI collaboration workstream at Frostline Research — Case 026, add lineage tagging and CUI review to downstream data transformation and export approvals.
  4. For the CUI collaboration workstream at Frostline Research — Case 026, add contract-origin and dissemination review questions to the data inventory and onboarding workflow.

Explanation

Correct Answer

B:

This lasting preventive control is appropriate for Frostline Research — Case 026: Maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible. The event exposed The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. and the initial authorized response was Move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls. Continuous follow-up preserves the intent of CUI protection follows the information wherever it is processed, stored, or transmitted, including collaboration applications.

Incorrect Answers

A:

Option A proposes an ongoing control for another risk: For the CUI collaboration workstream at Frostline Research — Case 026, require documented source-owner CUI determination and reconciliation when markings or contractual instructions conflict. The recurring condition in this scenario is: For the CUI collaboration workstream at Frostline Research — Case 026, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The more targeted safeguard is: For the CUI collaboration workstream at Frostline Research — Case 026, maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible.

C:

Option C proposes an ongoing control for another risk: For the CUI collaboration workstream at Frostline Research — Case 026, add lineage tagging and CUI review to downstream data transformation and export approvals. The recurring condition in this scenario is: For the CUI collaboration workstream at Frostline Research — Case 026, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The more targeted safeguard is: For the CUI collaboration workstream at Frostline Research — Case 026, maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible.

D:

Option D proposes an ongoing control for another risk: For the CUI collaboration workstream at Frostline Research — Case 026, add contract-origin and dissemination review questions to the data inventory and onboarding workflow. The recurring condition in this scenario is: For the CUI collaboration workstream at Frostline Research — Case 026, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The more targeted safeguard is: For the CUI collaboration workstream at Frostline Research — Case 026, maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible.

Question 131

At fictional Highgarden Supply — Case 027, the team is performing a multi-site evidence collection plan for its manufacturing telemetry program at the secondary contractor location. The observed evidence is: A project team routes government-marked CUI through an unassessed personal chat service because participants believe a confidentiality notice alone is sufficient. The team must identify the specific cause before it draws a conclusion. Which underlying CMMC compliance or assessment issue BEST explains the observed evidence?

  1. For the manufacturing telemetry program at Highgarden Supply — Case 027, records provided by or generated for federal contract performance were not evaluated for Federal Contract Information status.
  2. For the manufacturing telemetry program at Highgarden Supply — Case 027, the safeguarding inventory ignores that authorized public release changes whether information remains nonpublic FCI.
  3. For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls.
  4. For the manufacturing telemetry program at Highgarden Supply — Case 027, a transformed data set still contains protected content but was excluded from CUI handling based only on format change.

Explanation

Correct Answer

C:

Correct for the specific observed pattern at Highgarden Supply — Case 027: A project team routes government-marked CUI through an unassessed personal chat service because participants believe a confidentiality notice alone is sufficient. The decisive underlying cause is The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The appropriate response is Move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls. Acceptance should be demonstrated by Access and transfer tests demonstrate that CUI moves only through approved systems with documented boundary and control responsibilities.

Incorrect Answers

A:

Option A concerns a different proposed cause: For the manufacturing telemetry program at Highgarden Supply — Case 027, records provided by or generated for federal contract performance were not evaluated for Federal Contract Information status. The recorded condition instead supports: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls.

B:

Option B concerns a different proposed cause: For the manufacturing telemetry program at Highgarden Supply — Case 027, the safeguarding inventory ignores that authorized public release changes whether information remains nonpublic FCI. The recorded condition instead supports: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls.

D:

Option D concerns a different proposed cause: For the manufacturing telemetry program at Highgarden Supply — Case 027, a transformed data set still contains protected content but was excluded from CUI handling based only on format change. The recorded condition instead supports: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls.

Question 132

At fictional Highgarden Supply — Case 027, the team is performing a multi-site evidence collection plan for its manufacturing telemetry program at the secondary contractor location. The observed evidence is: A project team routes government-marked CUI through an unassessed personal chat service because participants believe a confidentiality notice alone is sufficient. The confirmed underlying issue is: The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The responsible owner has confirmed the issue and needs a narrowly scoped corrective action. Which proportionate, authorized action BEST addresses the confirmed underlying issue?

  1. For the manufacturing telemetry program at Highgarden Supply — Case 027, trace the extracted information's sensitivity through downstream systems and apply applicable CUI controls wherever the protected content remains.
  2. For the manufacturing telemetry program at Highgarden Supply — Case 027, classify the nonpublic contract-related information under applicable FCI definitions and include relevant covered systems in the safeguarding scope.
  3. For the manufacturing telemetry program at Highgarden Supply — Case 027, resolve classification and handling with the authorized government information owner and applicable CUI registry or contract guidance before finalizing system treatment.
  4. For the manufacturing telemetry program at Highgarden Supply — Case 027, move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls.

Explanation

Correct Answer

D:

This is the targeted authorized corrective action for Highgarden Supply — Case 027: Move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls. The confirmed gap is The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The action follows CUI protection follows the information wherever it is processed, stored, or transmitted, including collaboration applications. It should be accepted only after Access and transfer tests demonstrate that CUI moves only through approved systems with documented boundary and control responsibilities.

Incorrect Answers

A:

Option A proposes a different intervention: For the manufacturing telemetry program at Highgarden Supply — Case 027, trace the extracted information's sensitivity through downstream systems and apply applicable CUI controls wherever the protected content remains. The specific issue in this case is: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The action directed at that issue is: For the manufacturing telemetry program at Highgarden Supply — Case 027, move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls.

B:

Option B proposes a different intervention: For the manufacturing telemetry program at Highgarden Supply — Case 027, classify the nonpublic contract-related information under applicable FCI definitions and include relevant covered systems in the safeguarding scope. The specific issue in this case is: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The action directed at that issue is: For the manufacturing telemetry program at Highgarden Supply — Case 027, move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls.

C:

Option C proposes a different intervention: For the manufacturing telemetry program at Highgarden Supply — Case 027, resolve classification and handling with the authorized government information owner and applicable CUI registry or contract guidance before finalizing system treatment. The specific issue in this case is: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The action directed at that issue is: For the manufacturing telemetry program at Highgarden Supply — Case 027, move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls.

Question 133

At fictional Highgarden Supply — Case 027, the team is performing a multi-site evidence collection plan for its manufacturing telemetry program at the secondary contractor location. The observed evidence is: A project team routes government-marked CUI through an unassessed personal chat service because participants believe a confidentiality notice alone is sufficient. The selected authorized corrective approach is: Move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls. The responsible owner wants to explain why the proposed response is justified. Which governing CMMC assessment or safeguarding principle BEST justifies this response?

  1. For the manufacturing telemetry program at Highgarden Supply — Case 027, cUI protection follows the information wherever it is processed, stored, or transmitted, including collaboration applications.
  2. For the manufacturing telemetry program at Highgarden Supply — Case 027, fCI can include information provided by or generated for the government under a contract, not merely documents with visible government stamps.
  3. For the manufacturing telemetry program at Highgarden Supply — Case 027, cUI status rests on lawful governmentwide safeguarding categories and authorized determinations, not arbitrary contractor intuition.
  4. For the manufacturing telemetry program at Highgarden Supply — Case 027, fCI generally concerns nonpublic contract-related information; merely mentioning a government customer does not itself create controlled status.

Explanation

Correct Answer

A:

The applicable principle in this Highgarden Supply — Case 027 decision is CUI protection follows the information wherever it is processed, stored, or transmitted, including collaboration applications. It explains why Move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls. addresses the actual issue, which is The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The principle is made testable by Access and transfer tests demonstrate that CUI moves only through approved systems with documented boundary and control responsibilities.

Incorrect Answers

B:

Option B states another potentially relevant principle: For the manufacturing telemetry program at Highgarden Supply — Case 027, fCI can include information provided by or generated for the government under a contract, not merely documents with visible government stamps. The more specific rule for this case is: For the manufacturing telemetry program at Highgarden Supply — Case 027, cUI protection follows the information wherever it is processed, stored, or transmitted, including collaboration applications. It is being applied to the problem: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls.

C:

Option C states another potentially relevant principle: For the manufacturing telemetry program at Highgarden Supply — Case 027, cUI status rests on lawful governmentwide safeguarding categories and authorized determinations, not arbitrary contractor intuition. The more specific rule for this case is: For the manufacturing telemetry program at Highgarden Supply — Case 027, cUI protection follows the information wherever it is processed, stored, or transmitted, including collaboration applications. It is being applied to the problem: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls.

D:

Option D states another potentially relevant principle: For the manufacturing telemetry program at Highgarden Supply — Case 027, fCI generally concerns nonpublic contract-related information; merely mentioning a government customer does not itself create controlled status. The more specific rule for this case is: For the manufacturing telemetry program at Highgarden Supply — Case 027, cUI protection follows the information wherever it is processed, stored, or transmitted, including collaboration applications. It is being applied to the problem: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls.

Question 134

At fictional Highgarden Supply — Case 027, the team is performing a multi-site evidence collection plan for its manufacturing telemetry program at the secondary contractor location. The observed evidence is: A project team routes government-marked CUI through an unassessed personal chat service because participants believe a confidentiality notice alone is sufficient. The selected authorized corrective approach is: Move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls. The change was authorized and implemented, and its actual result must now be validated. Which objective evidence BEST demonstrates that the intended correction is effective?

  1. For the manufacturing telemetry program at Highgarden Supply — Case 027, the source owner confirms the appropriate CUI designation and the approved handling record is linked to the file and system boundary.
  2. For the manufacturing telemetry program at Highgarden Supply — Case 027, access and transfer tests demonstrate that CUI moves only through approved systems with documented boundary and control responsibilities.
  3. For the manufacturing telemetry program at Highgarden Supply — Case 027, the downstream analytics repository and approved export records show appropriate data classification and access enforcement.
  4. For the manufacturing telemetry program at Highgarden Supply — Case 027, the reviewed contract-data inventory identifies the records and their hosting systems with applicable FCI handling obligations.

Explanation

Correct Answer

B:

This specified evidence directly tests whether the approved response worked at Highgarden Supply — Case 027: Access and transfer tests demonstrate that CUI moves only through approved systems with documented boundary and control responsibilities. The earlier gap was The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. and the chosen intervention was Move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls. A claim that a policy or task was approved would not by itself substitute for this observable result.

Incorrect Answers

A:

Option A would check a different result: For the manufacturing telemetry program at Highgarden Supply — Case 027, the source owner confirms the appropriate CUI designation and the approved handling record is linked to the file and system boundary. The reported failure instead concerns: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. For this case, verify: For the manufacturing telemetry program at Highgarden Supply — Case 027, access and transfer tests demonstrate that CUI moves only through approved systems with documented boundary and control responsibilities.

C:

Option C would check a different result: For the manufacturing telemetry program at Highgarden Supply — Case 027, the downstream analytics repository and approved export records show appropriate data classification and access enforcement. The reported failure instead concerns: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. For this case, verify: For the manufacturing telemetry program at Highgarden Supply — Case 027, access and transfer tests demonstrate that CUI moves only through approved systems with documented boundary and control responsibilities.

D:

Option D would check a different result: For the manufacturing telemetry program at Highgarden Supply — Case 027, the reviewed contract-data inventory identifies the records and their hosting systems with applicable FCI handling obligations. The reported failure instead concerns: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. For this case, verify: For the manufacturing telemetry program at Highgarden Supply — Case 027, access and transfer tests demonstrate that CUI moves only through approved systems with documented boundary and control responsibilities.

Question 135

At fictional Highgarden Supply — Case 027, the team is performing a multi-site evidence collection plan for its manufacturing telemetry program at the secondary contractor location. The observed evidence is: A project team routes government-marked CUI through an unassessed personal chat service because participants believe a confidentiality notice alone is sufficient. The confirmed underlying issue is: The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The immediate issue was handled and the control owner is planning recurrence prevention. Which sustainable organizational safeguard BEST reduces recurrence of the same failure?

  1. For the manufacturing telemetry program at Highgarden Supply — Case 027, preserve release-authority references and reassess datasets when public and internal contract information are combined.
  2. For the manufacturing telemetry program at Highgarden Supply — Case 027, add lineage tagging and CUI review to downstream data transformation and export approvals.
  3. For the manufacturing telemetry program at Highgarden Supply — Case 027, maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible.
  4. For the manufacturing telemetry program at Highgarden Supply — Case 027, add contract-origin and dissemination review questions to the data inventory and onboarding workflow.

Explanation

Correct Answer

C:

This lasting preventive control is appropriate for Highgarden Supply — Case 027: Maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible. The event exposed The selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. and the initial authorized response was Move CUI discussions and files to an authorized in-scope collaboration environment and verify service responsibilities, access, and retention controls. Continuous follow-up preserves the intent of CUI protection follows the information wherever it is processed, stored, or transmitted, including collaboration applications.

Incorrect Answers

A:

Option A proposes an ongoing control for another risk: For the manufacturing telemetry program at Highgarden Supply — Case 027, preserve release-authority references and reassess datasets when public and internal contract information are combined. The recurring condition in this scenario is: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The more targeted safeguard is: For the manufacturing telemetry program at Highgarden Supply — Case 027, maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible.

B:

Option B proposes an ongoing control for another risk: For the manufacturing telemetry program at Highgarden Supply — Case 027, add lineage tagging and CUI review to downstream data transformation and export approvals. The recurring condition in this scenario is: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The more targeted safeguard is: For the manufacturing telemetry program at Highgarden Supply — Case 027, maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible.

D:

Option D proposes an ongoing control for another risk: For the manufacturing telemetry program at Highgarden Supply — Case 027, add contract-origin and dissemination review questions to the data inventory and onboarding workflow. The recurring condition in this scenario is: For the manufacturing telemetry program at Highgarden Supply — Case 027, the selected communications environment is outside the approved protected CUI processing boundary and has no validated safeguarding controls. The more targeted safeguard is: For the manufacturing telemetry program at Highgarden Supply — Case 027, maintain an approved CUI communications-services catalog and restrict unauthorized transfers where feasible.

Question 136

At fictional Whiteharbor Research — Case 028, the team is performing an independent CMMC scope validation for its government program documentation at the cloud landing zone. The observed evidence is: A prime contractor accepts controlled technical deliverables from a sub without checking whether applicable safeguarding clauses or required reporting duties flowed down. The team must identify the specific cause before it draws a conclusion. Which underlying CMMC compliance or assessment issue BEST explains the observed evidence?

  1. Documentation stewardship is outsourced without accountable internal ownership and review of covered information systems.
  2. The OSC has failed to allocate customer-configured controls and inherited provider controls under a verified shared-responsibility boundary.
  3. Contract requirements were combined without identifying each clause's applicability, covered information type, and controlling procurement terms.
  4. Supplier-management records omit contractually applicable information security obligations for subcontracted covered work.

Explanation

Correct Answer

D:

The decisive underlying cause is Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The appropriate response is Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status. Acceptance should be demonstrated by Executed subcontract language and supporting supplier records demonstrate the required safeguards and information-handling responsibilities.

Incorrect Answers

A:

Option A concerns a different proposed cause: Documentation stewardship is outsourced without accountable internal ownership and review of covered information systems. The recorded condition instead supports: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work.

B:

Option B concerns a different proposed cause: The OSC has failed to allocate customer-configured controls and inherited provider controls under a verified shared-responsibility boundary. The recorded condition instead supports: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work.

C:

Option C concerns a different proposed cause: Contract requirements were combined without identifying each clause's applicability, covered information type, and controlling procurement terms. The recorded condition instead supports: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work.

Question 137

At fictional Whiteharbor Research — Case 028, the team is performing an independent CMMC scope validation for its government program documentation at the cloud landing zone. The observed evidence is: A prime contractor accepts controlled technical deliverables from a sub without checking whether applicable safeguarding clauses or required reporting duties flowed down. The confirmed underlying issue is: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The responsible owner has confirmed the issue and needs a narrowly scoped corrective action. Which proportionate, authorized action BEST addresses the confirmed underlying issue?

  1. Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status.
  2. Map applicable controls to the service architecture and provider evidence, then test the tenant-side configuration and documented inherited control coverage.
  3. Appoint the OSC's responsible security and contract owners to validate SSP content, system boundaries, and subsequent evidence changes.
  4. Build a contract-specific clause matrix with the contracting officer and counsel, then apply required protections to each relevant data flow and system.

Explanation

Correct Answer

A:

This is the targeted authorized corrective action for Whiteharbor Research — Case 028: Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status. The confirmed gap is Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The action follows A prime's use of subcontractors does not erase the legal and contractual safeguards applicable to covered defense information. It should be accepted only after Executed subcontract language and supporting supplier records demonstrate the required safeguards and information-handling responsibilities.

Incorrect Answers

B:

Option B proposes a different intervention: Map applicable controls to the service architecture and provider evidence, then test the tenant-side configuration and documented inherited control coverage. The specific issue in this case is: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The action directed at that issue is: Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status.

C:

Option C proposes a different intervention: Appoint the OSC's responsible security and contract owners to validate SSP content, system boundaries, and subsequent evidence changes. The specific issue in this case is: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The action directed at that issue is: Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status.

D:

Option D proposes a different intervention: Build a contract-specific clause matrix with the contracting officer and counsel, then apply required protections to each relevant data flow and system. The specific issue in this case is: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The action directed at that issue is: Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status.

Question 138

At fictional Whiteharbor Research — Case 028, the team is performing an independent CMMC scope validation for its government program documentation at the cloud landing zone. The observed evidence is: A prime contractor accepts controlled technical deliverables from a sub without checking whether applicable safeguarding clauses or required reporting duties flowed down. The selected authorized corrective approach is: Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status. The responsible owner wants to explain why the proposed response is justified. Which governing CMMC assessment or safeguarding principle BEST justifies this response?

  1. Service providers can help document compliance, while the organization retains accountability for its system and representations.
  2. A prime's use of subcontractors does not erase the legal and contractual safeguards applicable to covered defense information.
  3. Cloud provider attestations may support inherited safeguards but do not automatically prove all contractor-side practices are met.
  4. FAR and DFARS provisions apply through their contractual context; contractors cannot arbitrarily replace one obligation with another.

Explanation

Correct Answer

B:

The applicable principle in this Whiteharbor Research — Case 028 decision is A prime's use of subcontractors does not erase the legal and contractual safeguards applicable to covered defense information. It explains why Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status. addresses the actual issue, which is Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The principle is made testable by Executed subcontract language and supporting supplier records demonstrate the required safeguards and information-handling responsibilities.

Incorrect Answers

A:

Option A states another potentially relevant principle: Service providers can help document compliance, while the organization retains accountability for its system and representations. The more specific rule for this case is: A prime's use of subcontractors does not erase the legal and contractual safeguards applicable to covered defense information. It is being applied to the problem: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work.

C:

Option C states another potentially relevant principle: Cloud provider attestations may support inherited safeguards but do not automatically prove all contractor-side practices are met. The more specific rule for this case is: A prime's use of subcontractors does not erase the legal and contractual safeguards applicable to covered defense information. It is being applied to the problem: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work.

D:

Option D states another potentially relevant principle: FAR and DFARS provisions apply through their contractual context; contractors cannot arbitrarily replace one obligation with another. The more specific rule for this case is: A prime's use of subcontractors does not erase the legal and contractual safeguards applicable to covered defense information. It is being applied to the problem: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work.

Question 139

At fictional Whiteharbor Research — Case 028, the team is performing an independent CMMC scope validation for its government program documentation at the cloud landing zone. The observed evidence is: A prime contractor accepts controlled technical deliverables from a sub without checking whether applicable safeguarding clauses or required reporting duties flowed down. The selected authorized corrective approach is: Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status. The change was authorized and implemented, and its actual result must now be validated. Which objective evidence BEST demonstrates that the intended correction is effective?

  1. Signed review records show informed OSC ownership of the current SSP and supporting system inventory.
  2. The contract register ties every safeguarding decision to the applicable award, clause, information class, and affected system.
  3. Executed subcontract language and supporting supplier records demonstrate the required safeguards and information-handling responsibilities.
  4. The control-responsibility matrix and scoped tenant configuration tests show the actual implementation owner for each requirement.

Explanation

Correct Answer

C:

This specified evidence directly tests whether the approved response worked at Whiteharbor Research — Case 028: Executed subcontract language and supporting supplier records demonstrate the required safeguards and information-handling responsibilities. The earlier gap was Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. and the chosen intervention was Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status. A claim that a policy or task was approved would not by itself substitute for this observable result.

Incorrect Answers

A:

Option A would check a different result: Signed review records show informed OSC ownership of the current SSP and supporting system inventory. The reported failure instead concerns: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. For this case, verify: Executed subcontract language and supporting supplier records demonstrate the required safeguards and information-handling responsibilities.

B:

Option B would check a different result: The contract register ties every safeguarding decision to the applicable award, clause, information class, and affected system. The reported failure instead concerns: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. For this case, verify: Executed subcontract language and supporting supplier records demonstrate the required safeguards and information-handling responsibilities.

D:

Option D would check a different result: The control-responsibility matrix and scoped tenant configuration tests show the actual implementation owner for each requirement. The reported failure instead concerns: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. For this case, verify: Executed subcontract language and supporting supplier records demonstrate the required safeguards and information-handling responsibilities.

Question 140

At fictional Whiteharbor Research — Case 028, the team is performing an independent CMMC scope validation for its government program documentation at the cloud landing zone. The observed evidence is: A prime contractor accepts controlled technical deliverables from a sub without checking whether applicable safeguarding clauses or required reporting duties flowed down. The confirmed underlying issue is: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The immediate issue was handled and the control owner is planning recurrence prevention. Which sustainable organizational safeguard BEST reduces recurrence of the same failure?

  1. Revalidate inherited-control evidence and customer configuration whenever service features or CUI data flows change.
  2. Institute a scheduled internal owner review whenever contracts, cloud assets, subcontractors, or CUI handling change.
  3. Require legal/procurement review before harmonizing different security provisions across customers.
  4. Include cyber clause and data-flow checks in subcontract initiation and periodic supplier governance reviews.

Explanation

Correct Answer

D:

This lasting preventive control is appropriate for Whiteharbor Research — Case 028: Include cyber clause and data-flow checks in subcontract initiation and periodic supplier governance reviews. The event exposed Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. and the initial authorized response was Review prime/subcontract clauses and CUI handling, flow down applicable obligations, and obtain evidence of supplier responsibilities and compliance status. Continuous follow-up preserves the intent of A prime's use of subcontractors does not erase the legal and contractual safeguards applicable to covered defense information.

Incorrect Answers

A:

Option A proposes an ongoing control for another risk: Revalidate inherited-control evidence and customer configuration whenever service features or CUI data flows change. The recurring condition in this scenario is: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The more targeted safeguard is: Include cyber clause and data-flow checks in subcontract initiation and periodic supplier governance reviews.

B:

Option B proposes an ongoing control for another risk: Institute a scheduled internal owner review whenever contracts, cloud assets, subcontractors, or CUI handling change. The recurring condition in this scenario is: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The more targeted safeguard is: Include cyber clause and data-flow checks in subcontract initiation and periodic supplier governance reviews.

C:

Option C proposes an ongoing control for another risk: Require legal/procurement review before harmonizing different security provisions across customers. The recurring condition in this scenario is: Supplier-management records omit contractually applicable information security obligations for subcontracted covered work. The more targeted safeguard is: Include cyber clause and data-flow checks in subcontract initiation and periodic supplier governance reviews.

Certified CMMC Professional (CCP) Practice Tests