Question 400
At fictional Windholm Research — Case 080, the team is performing a pre-assessment compliance evidence review for its engineering drawing exchange at the cloud landing zone. The observed evidence is: A contractor substitutes a generic device-hardening checklist for a specific security requirement and claims equivalent compliance without a documented basis. The confirmed underlying issue is: A proposed alternative approach lacks a substantiated relationship to the actual requirement and assessment objectives. The immediate issue was handled and the control owner is planning recurrence prevention. Which sustainable organizational safeguard BEST reduces recurrence of the same failure?
Explanation
Correct Answer
This lasting preventive control is appropriate for Windholm Research — Case 080: Require written technical rationale and review for substitutions before presenting them as assessed-compliant controls. The event exposed A proposed alternative approach lacks a substantiated relationship to the actual requirement and assessment objectives. and the initial authorized response was Analyze the required outcome and applicable permitted alternative processes, document evidence, and seek authorized determination rather than self-approving. Continuous follow-up preserves the intent of A different control can only satisfy a requirement if the governing assessment process supports equivalence and its objectives are met.
Incorrect Answers
Option A proposes an ongoing control for another risk: Periodically revalidate provider coverage, service features, data location, and tenant responsibilities when the architecture changes. The recurring condition in this scenario is: A proposed alternative approach lacks a substantiated relationship to the actual requirement and assessment objectives. The more targeted safeguard is: Require written technical rationale and review for substitutions before presenting them as assessed-compliant controls.
Option B proposes an ongoing control for another risk: Require multi-site sampling plans that reflect distinct implementations, providers, and operating environments. The recurring condition in this scenario is: A proposed alternative approach lacks a substantiated relationship to the actual requirement and assessment objectives. The more targeted safeguard is: Require written technical rationale and review for substitutions before presenting them as assessed-compliant controls. The reported evidence is: A contractor substitutes a generic device-hardening checklist for a specific security requirement and claims equivalent compliance without a documented basis.
Option C proposes an ongoing control for another risk: Automate periodic comparisons of requested access permissions to live configuration and owner attestations. The recurring condition in this scenario is: A proposed alternative approach lacks a substantiated relationship to the actual requirement and assessment objectives. The more targeted safeguard is: Require written technical rationale and review for substitutions before presenting them as assessed-compliant controls.