Question 430
At fictional Beacon Healthcare, a storage integration engineer supporting hospital systems is evaluating storage array installation and host integration during a site failover exercise (HPE-HPE0-J83-INSTALL-108). The observed storage integration issue is: A new disk shelf fails to enumerate because the integrator reverses SAS expansion path cabling. Which specific storage integration action best addresses the reported issue?
Explanation
Correct Answer
The most direct corrective action is: Rebuild enclosure connections according to the supported topology diagram. The specific problem is: A new disk shelf fails to enumerate because the integrator reverses SAS expansion path cabling. Expected acceptance evidence is: All expected shelf identifiers and drives appear with healthy dual-path links. The underlying storage principle is: Disk enclosure discovery depends on valid expansion topology and cable paths.
Incorrect Answers
The choice “Run application-level read write failover and recovery acceptance against signed requirements.” evaluates another aspect of the storage design: another storage design or acceptance condition. The current problem is that a new disk shelf fails to enumerate because the integrator reverses SAS expansion path cabling. Disk enclosure discovery depends on valid expansion topology and cable paths.
The HPE measure “Configure supported event logging time sync and authenticated administration.” concerns another storage task: another storage design or acceptance condition. The actual acceptance gap is that a new disk shelf fails to enumerate because the integrator reverses SAS expansion path cabling. Disk enclosure discovery depends on valid expansion topology and cable paths.
This option tests a separate storage control: another storage design or acceptance condition. The reported gap is that a new disk shelf fails to enumerate because the integrator reverses SAS expansion path cabling. Disk enclosure discovery depends on valid expansion topology and cable paths.