Question 190
At fictional Bayside Travel, the network architecture group is preparing a proposal for travel operations offices during the site-readiness inspection (case HPE7A11-3.5-185). The review identified this issue: the design review signs off wired access but leaves wireless RF coverage acceptance undefined. Which architecture or design action best addresses this issue?
Explanation
Correct Answer
This action addresses the stated design issue: The design review signs off wired access but leaves wireless RF coverage acceptance undefined. The proposed response is to attach wireless survey and capacity acceptance criteria to the approval matrix. The observable acceptance result is that the review package has measurable acceptance tests for all scoped access services.
Incorrect Answers
The offered evidence “Maintain a decision and action log with disposition owners and acceptance criteria” relates to conduct technical and business review. The actual question describes this issue: the design review signs off wired access but leaves wireless RF coverage acceptance undefined. The corresponding response is “Attach wireless survey and capacity acceptance criteria to the approval matrix.”.
This option — “Decide whether management functions are in scope and reconcile the BOM” — checks conduct technical and business review, not whether the design resolves the stated fault: the design review signs off wired access but leaves wireless RF coverage acceptance undefined. The selected direct criterion is “Attach wireless survey and capacity acceptance criteria to the approval matrix.”.
“Conduct a combined design and financial review with explicit unresolved issues” is a test of conduct technical and business review. That does not establish “Attach wireless survey and capacity acceptance criteria to the approval matrix.” for the reported issue (the design review signs off wired access but leaves wireless RF coverage acceptance undefined).