Question 220
At fictional Clearbrook Aviation, the network architecture group is preparing a proposal for airport office facilities during the integration planning workshop (case HPE7A11-3.4-172). The review identified this issue: a campus has a redundant switch core but the install plan tests only the normal state before handover. Which observed evidence would most directly validate the proposed design correction?
Explanation
Correct Answer
This observation directly tests the proposed correction. The architect should include planned failure injection, recovery observation and service acceptance tests; the stated result confirms that documented link or node failure tests meet the agreed behavior. It follows from the design principle that resilience must be validated under failure rather than inferred from hardware.
Incorrect Answers
This option — “The planned versions interoperate during each coexistence stage” — checks document implementation and migration guidelines, not whether the design resolves the stated fault: a campus has a redundant switch core but the install plan tests only the normal state before handover. The selected direct criterion is “Documented link or node failure tests meet the agreed behavior.”.
“The new policy accepts approved clients and rejects unsupported clients safely” is a test of document implementation and migration guidelines. That does not establish “Documented link or node failure tests meet the agreed behavior.” for the reported issue (a campus has a redundant switch core but the install plan tests only the normal state before handover).
The offered evidence “Pilot results meet service, security and failback acceptance conditions” relates to document implementation and migration guidelines. The actual question describes this issue: a campus has a redundant switch core but the install plan tests only the normal state before handover. The corresponding response is “Documented link or node failure tests meet the agreed behavior.”.