Question 30
At fictional Orchid Hospitality, the network architecture group is preparing a proposal for conference campus during the architecture feasibility review (case HPE7A11-3.2-149). The review identified this issue: the final bill has the correct switch count but omits uplink optics required by the accepted topology. Which recurring control most directly reduces the likelihood of this design problem returning?
Explanation
Correct Answer
This recurring control is targeted to the risk that The final bill has the correct switch count but omits uplink optics required by the accepted topology. The preventative action is to perform link-end part reconciliation before ordering. The underlying design correction remains to reconcile hardware, optics and cable accessories against every physical link.
Incorrect Answers
“Require mounting review for unusual spaces” evaluates finalize bom. The reported design gap is this: the final bill has the correct switch count but omits uplink optics required by the accepted topology. The required response is “Perform link-end part reconciliation before ordering.”.
This option — “Verify lifecycle dates across all quote lines” — checks finalize bom, not whether the design resolves the stated fault: the final bill has the correct switch count but omits uplink optics required by the accepted topology. The selected direct criterion is “Perform link-end part reconciliation before ordering.”.
“Rerun accessory compatibility on every product substitution” is a test of finalize bom. That does not establish “Perform link-end part reconciliation before ordering.” for the reported issue (the final bill has the correct switch count but omits uplink optics required by the accepted topology).