Question 400
At fictional Crescent Housing, the network architecture group is preparing a proposal for residential management offices during the site-readiness inspection (case HPE7A11-2.2-081). The review identified this issue: a bill of materials includes a management platform but functional drawings omit device enrollment and licensing. Which recurring control most directly reduces the likelihood of this design problem returning?
Explanation
Correct Answer
This recurring control is targeted to the risk that A bill of materials includes a management platform but functional drawings omit device enrollment and licensing. The preventative action is to simulate device replacement onboarding during acceptance. The underlying design correction remains to show initial device onboarding, management reachability and certificate or token dependencies.
Incorrect Answers
“Validate service dependencies before cutting over branches” is a test of create a functional diagram or workflow. That does not establish “Simulate device replacement onboarding during acceptance.” for the reported issue (a bill of materials includes a management platform but functional drawings omit device enrollment and licensing).
The offered evidence “Review operational impact of management reachability loss” relates to create a functional diagram or workflow. The actual question describes this issue: a bill of materials includes a management platform but functional drawings omit device enrollment and licensing. The corresponding response is “Simulate device replacement onboarding during acceptance.”.
“Validate wireless traffic concentration at each uplink” evaluates create a functional diagram or workflow. The reported design gap is this: a bill of materials includes a management platform but functional drawings omit device enrollment and licensing. The required response is “Simulate device replacement onboarding during acceptance.”.