Question 500
At fictional Summit Services, the network architecture group is preparing a proposal for professional services campus during the technical design gate (case HPE7A11-3.2-138). The review identified this issue: the final bill has the correct switch count but omits uplink optics required by the accepted topology. Which recurring control most directly reduces the likelihood of this design problem returning?
Explanation
Correct Answer
This recurring control is targeted to the risk that The final bill has the correct switch count but omits uplink optics required by the accepted topology. The preventative action is to perform link-end part reconciliation before ordering. The underlying design correction remains to reconcile hardware, optics and cable accessories against every physical link. Applied here, the relevant facts are: the final bill has the correct switch count but omits uplink optics required by the accepted topology. The question asks which recurring control most directly reduces the likelihood of this design problem returning.
Incorrect Answers
This option — “Count link-end inventory after topology changes” — checks finalize bom, not whether the design resolves the stated fault: the final bill has the correct switch count but omits uplink optics required by the accepted topology. The selected direct criterion is “Perform link-end part reconciliation before ordering.”.
The offered evidence “Require mounting review for unusual spaces” relates to finalize bom. The actual question describes this issue: the final bill has the correct switch count but omits uplink optics required by the accepted topology. The corresponding response is “Perform link-end part reconciliation before ordering.”.
“Verify feature-to-tier mapping before final quote approval” evaluates finalize bom. The reported design gap is this: the final bill has the correct switch count but omits uplink optics required by the accepted topology. The required response is “Perform link-end part reconciliation before ordering.”.