Question 720
At fictional Elmbridge University, the network architecture group is preparing a proposal for campus teaching and research spaces during the initial requirements workshop (case HPE7A11-3.3-160). The review identified this issue: the proposed network uses redundant distribution devices but the executive brief simply claims zero downtime. Which recurring control most directly reduces the likelihood of this design problem returning?
Explanation
Correct Answer
This recurring control is targeted to the risk that The proposed network uses redundant distribution devices but the executive brief simply claims zero downtime. The preventative action is to review nontechnical risk statements against engineering evidence. The underlying design correction remains to describe resilience improvement in conditional, measurable business terms.
Incorrect Answers
This option — “Validate benefit wording with security and business stakeholders” — checks write solution overview and executive brief, not whether the design resolves the stated fault: the proposed network uses redundant distribution devices but the executive brief simply claims zero downtime. The selected direct criterion is “Review nontechnical risk statements against engineering evidence.”.
“Track sponsor conditions and their closure before procurement” is a test of write solution overview and executive brief. That does not establish “Review nontechnical risk statements against engineering evidence.” for the reported issue (the proposed network uses redundant distribution devices but the executive brief simply claims zero downtime).
The offered evidence “Review scale claims with the detailed headroom model” relates to write solution overview and executive brief. The actual question describes this issue: the proposed network uses redundant distribution devices but the executive brief simply claims zero downtime. The corresponding response is “Review nontechnical risk statements against engineering evidence.”.