Question 780
At fictional Summit Services, the network architecture group is preparing a proposal for professional services campus during the technical design gate (case HPE7A11-2.3-098). The review identified this issue: a new floor needs 192 wired ports and the draft BOM includes four 48-port switches without any spare capacity. Which architecture or design action best addresses this issue?
Explanation
Correct Answer
This action addresses the stated design issue: A new floor needs 192 wired ports and the draft BOM includes four 48-port switches without any spare capacity. The proposed response is to plan an appropriate switch count with realistic spare-port growth allowance. The observable acceptance result is that the preliminary schedule supports required ports plus the approved headroom. Applied here, the relevant facts are: a new floor needs 192 wired ports and the draft BOM includes four 48-port switches without any spare capacity. The question asks which architecture or design action best addresses this issue.
Incorrect Answers
This option — “Count all live and spare optics on both ends of each required uplink” — checks create wired and wireless topology and preliminary bom, not whether the design resolves the stated fault: a new floor needs 192 wired ports and the draft BOM includes four 48-port switches without any spare capacity. The selected direct criterion is “Plan an appropriate switch count with realistic spare-port growth allowance.”.
“Include the explicitly agreed spare equipment and replacement logistics” is a test of create wired and wireless topology and preliminary bom. That does not establish “Plan an appropriate switch count with realistic spare-port growth allowance.” for the reported issue (a new floor needs 192 wired ports and the draft BOM includes four 48-port switches without any spare capacity).
“Include approved mounting hardware, brackets and cable drops for each placement” evaluates create wired and wireless topology and preliminary bom. The reported design gap is this: a new floor needs 192 wired ports and the draft BOM includes four 48-port switches without any spare capacity. The required response is “Plan an appropriate switch count with realistic spare-port growth allowance.”.