Question 100
At Redfern Aviation, an architecture review of airport passenger and ground operations across international hubs and remote terminals is underway while preparing regional service migration (DES-3-21-1). The review is led by the airport digital infrastructure team. The documented design gap: a legacy three-tier switched campus relies on spanning tree while a routed VXLAN EVPN fabric will replace it. The solution must proceed while meeting the documented single-failure recovery target. Which ongoing architecture control best reduces recurrence of this gap?
Explanation
Correct Answer
The ongoing design assurance control is: Remove temporary layer-two interconnects after verified final migrations. It is targeted at the documented risk: a legacy three-tier switched campus relies on spanning tree while a routed VXLAN EVPN fabric will replace it. The immediate design change is: Use controlled boundary interconnection and phased endpoint moves with loop prevention and tested route handoff. In subsequent reviews, validate recurrence prevention with: Pilot endpoint migration preserves gateway continuity and does not extend an uncontrolled L2 loop.
Incorrect Answers
The alternate safeguard protects a separate dependency: The ongoing design assurance control is: Keep connectivity dependency inventory and migration rollback criteria current. For this failure the continuing exposure is: The ongoing design assurance control is: Remove temporary layer-two interconnects after verified final migrations. Maintain “Remove temporary layer-two interconnects after verified final migrations” instead.
That review tracks a separate failure mechanism: The ongoing design assurance control is: Track legacy IPv4 dependency retirement and test both address families after changes. The question requires sustained control over: The ongoing design assurance control is: Remove temporary layer-two interconnects after verified final migrations. The corresponding safeguard is “Remove temporary layer-two interconnects after verified final migrations”.
This safeguard maintains a different technical control: Each team manages separate command snippets. The recurring risk here is governed by: The ongoing design assurance control is: Remove temporary layer-two interconnects after verified final migrations. The relevant review is “Remove temporary layer-two interconnects after verified final migrations”.