Question 120
At Willow Manufacturing, an architecture review of factory telemetry and production systems across plants and a shared analytics center is underway during an approved cloud and site integration project (DES-3-26-2). The review is led by the manufacturing OT network team. The documented design gap: network CI checks formatting but does not stop a policy that leaks isolated VRF routes between customers. The solution must proceed while meeting the documented single-failure recovery target. Which ongoing architecture control best reduces recurrence of this gap?
Explanation
Correct Answer
The ongoing design assurance control is: Maintain topology test fixtures for every protected tenant boundary. It is targeted at the documented risk: network CI checks formatting but does not stop a policy that leaks isolated VRF routes between customers. The immediate design change is: Add negative path and route-leak tests to the automated pipeline before config publication. In subsequent reviews, validate recurrence prevention with: A staged change is blocked if a forbidden cross-tenant prefix becomes reachable.
Incorrect Answers
The alternate safeguard protects a separate dependency: Each team manages separate command snippets. For this failure the continuing exposure is: The ongoing design assurance control is: Maintain topology test fixtures for every protected tenant boundary. Maintain “Maintain topology test fixtures for every protected tenant boundary” instead.
That review tracks a separate failure mechanism: The ongoing design assurance control is: Review pipeline identity permissions and change logs after team rotations. The question requires sustained control over: The ongoing design assurance control is: Maintain topology test fixtures for every protected tenant boundary. The corresponding safeguard is “Maintain topology test fixtures for every protected tenant boundary”.
This safeguard maintains a different technical control: The ongoing design assurance control is: Publish explicit canary stop conditions and rollback owners in the implementation plan. The recurring risk here is governed by: The ongoing design assurance control is: Maintain topology test fixtures for every protected tenant boundary. The relevant review is “Maintain topology test fixtures for every protected tenant boundary”.