Question 570
A temporary tenant-route experiment remains uncommitted, yet the owner believes deleting active configuration on switches is the only way to abandon it. Once the issue is resolved, which ongoing practice BEST prevents this type of failure?
Explanation
Correct Answer
This control reduces recurrence of the same class of failure: The Apstra Revert action on uncommitted changes can discard staged changes that have not yet become the active blueprint. Apply the recurring practice: Label staged experiments clearly and use controlled revert procedures before escalating to time-travel recovery. The previous example was: A temporary tenant-route experiment remains uncommitted, yet the owner believes deleting active configuration on switches is the only way to abandon it.
Incorrect Answers
Property sets provide structured reusable values that supported Apstra configuration artifacts can reference, reducing duplicated literals. Here, the Apstra Revert action on uncommitted changes can discard staged changes that have not yet become the active blueprint.
Update generic system inventory and connectivity templates during endpoint onboarding. That concerns adding a generic endpoint after blueprint deployment, while the issue here is reverting only uncommitted proposed changes. Examine the uncommitted diff, revert the unwanted staged modifications and verify active state was never affected.
Service health evaluations and intent-based analytics probe results can represent different scopes and should be correlated before identifying an outage. For this issue, examine the uncommitted diff, revert the unwanted staged modifications and verify active state was never affected.