McAfee Secure

Microsoft AZ-700 Bundle

Exam Code: AZ-700

Exam Name Designing and Implementing Microsoft Azure Networking Solutions

Certification Provider: Microsoft

Corresponding Certification: Microsoft Certified: Azure Network Engineer Associate

Microsoft AZ-700 Bundle $44.99

100% Microsoft AZ-700 Guaranteed Success With Testking Training Materials

Get Real AZ-700 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    AZ-700 Questions & Answers

    406 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual AZ-700 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • AZ-700 Video Course

    AZ-700 Training Course

    64 Video Lectures

    AZ-700 Video Course is developed by Microsoft Professionals to help you pass the AZ-700 exam.

    Description

    This course will improve your knowledge and skills required to pass Designing and Implementing Microsoft Azure Networking Solutions exam.
  • Study Guide

    AZ-700 Study Guide

    762 PDF Pages

    Developed by industry experts, this 762-page guide spells out in painstaking detail all of the information you need to ace AZ-700 exam.

Designing and Implementing Microsoft Azure Networking Solutions (AZ-700) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers

    Questions & Answers

    406 Questions

    $124.99
  • AZ-700 Video Course

    Training Course

    64 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    762 PDF Pages

    $29.99

Microsoft AZ-700 Practice Test 50

Question 490

A business has a single ExpressRoute circuit for mission-critical traffic and expects it to survive all carrier failures. Which test outcome is MOST relevant to this failure?

  1. The ordered physical connectivity supports the planned circuit capacity and redundancy.
  2. A carrier outage exercise preserves approved connectivity through the surviving route.
  3. A planned VNet in the required geography can attach through the approved circuit design.
  4. Traffic to each approved destination uses the intended peering without unintended access.

Explanation

Correct Answer

B:

A carrier outage exercise preserves approved connectivity through the surviving route. This evidence validates the intended action: Design independent redundant circuits/providers and appropriate gateway connections. It specifically tests the technical mechanism: A redundant physical pair within one circuit does not eliminate all provider or location failure domains. The ongoing check is: Test diverse peering locations and DR route convergence.

Incorrect Answers

A:

The ordered physical connectivity supports the planned circuit capacity and redundancy. The required validation here instead depends on the fact that a carrier outage exercise preserves approved connectivity through the surviving route.

C:

A planned VNet in the required geography can attach through the approved circuit design. The required validation here instead depends on the fact that a carrier outage exercise preserves approved connectivity through the surviving route.

D:

Traffic to each approved destination uses the intended peering without unintended access. The required validation here instead depends on the fact that a carrier outage exercise preserves approved connectivity through the surviving route.

Question 491

An administrator attempts to allocate a public IP from a prefix in a different Azure region. Which observed result BEST confirms the specific network issue has been resolved?

  1. Each application frontend resolves to the intended assigned public IP from the prefix.
  2. The selected VPN gateway deploys without subnet-capacity errors in staging.
  3. The selected public address associates successfully with its regionally compatible prefix.
  4. The target workload receives the intended public endpoint and respects inbound restrictions.

Explanation

Correct Answer

C:

The selected public address associates successfully with its regionally compatible prefix. This evidence validates the intended action: Use a prefix with compatible region, SKU and address-family settings for the target IP resource. It specifically tests the technical mechanism: Prefix-backed public IPs must satisfy compatibility constraints with the selected allocation. The ongoing check is: Add region and SKU checks to network deployment templates.

Incorrect Answers

A:

Each application frontend resolves to the intended assigned public IP from the prefix. The required validation here instead depends on the fact that the selected public address associates successfully with its regionally compatible prefix.

B:

The selected VPN gateway deploys without subnet-capacity errors in staging. The required validation here instead depends on the fact that the selected public address associates successfully with its regionally compatible prefix.

D:

The target workload receives the intended public endpoint and respects inbound restrictions. The required validation here instead depends on the fact that the selected public address associates successfully with its regionally compatible prefix.

Question 492

An organization requires a 100 Gbps direct connectivity model but purchases a regular provider circuit without validating capacity options. What acceptance test most directly establishes that the change works?

  1. A carrier outage exercise preserves approved connectivity through the surviving route.
  2. A commissioned circuit shows expected private peering and protected traffic flow.
  3. A controlled circuit failover keeps bidirectional application sessions within recovery targets.
  4. The ordered physical connectivity supports the planned circuit capacity and redundancy.

Explanation

Correct Answer

D:

The ordered physical connectivity supports the planned circuit capacity and redundancy. This evidence validates the intended action: Evaluate ExpressRoute Direct port-pair and appropriate circuit bandwidth availability. It specifically tests the technical mechanism: ExpressRoute Direct offers dedicated physical port connectivity unlike ordinary provider circuit purchase. The ongoing check is: Reconcile port and circuit capacity reservations for future growth.

Incorrect Answers

A:

A carrier outage exercise preserves approved connectivity through the surviving route. The required validation here instead depends on the fact that the ordered physical connectivity supports the planned circuit capacity and redundancy.

B:

A commissioned circuit shows expected private peering and protected traffic flow. The required validation here instead depends on the fact that the ordered physical connectivity supports the planned circuit capacity and redundancy.

C:

A controlled circuit failover keeps bidirectional application sessions within recovery targets. The required validation here instead depends on the fact that the ordered physical connectivity supports the planned circuit capacity and redundancy.

Question 493

Consumers connect to a provider Private Link service but the backend application receives unexpected source addresses and IP-based authorization breaks. After remediation, which result is the strongest evidence of success?

  1. Two approved customers reach the service with correct app-level authorization and logging.
  2. The approved database FQDN resolves to and connects through the correct endpoint.
  3. An on-premises request reaches the private service without Internet proxy egress.
  4. Each permitted VNet reaches the service through tested peering or hybrid routes.

Explanation

Correct Answer

A:

Two approved customers reach the service with correct app-level authorization and logging. This evidence validates the intended action: Plan Private Link service NAT source behavior and use authenticated application identity rather than original client-IP assumptions. It specifically tests the technical mechanism: Provider-side Private Link service can use provider NAT addressing and does not preserve all original client source semantics. The ongoing check is: Document connection identity and address translation boundaries.

Incorrect Answers

B:

The approved database FQDN resolves to and connects through the correct endpoint. The required validation here instead depends on the fact that two approved customers reach the service with correct app-level authorization and logging.

C:

An on-premises request reaches the private service without Internet proxy egress. The required validation here instead depends on the fact that two approved customers reach the service with correct app-level authorization and logging.

D:

Each permitted VNet reaches the service through tested peering or hybrid routes. The required validation here instead depends on the fact that two approved customers reach the service with correct app-level authorization and logging.

Question 494

Employees use macOS and Windows clients, but the VPN design assumes every device supports SSTP identically. What should the team validate before accepting the networking change?

  1. A supported Windows Server establishes the intended Azure connection and resolves target subnets.
  2. A supported Windows and macOS client connect securely with the selected tunnel type.
  3. Authorized users connect and a disabled user account is denied.
  4. A managed device reconnects according to the intended user/device tunnel trigger.

Explanation

Correct Answer

B:

A supported Windows and macOS client connect securely with the selected tunnel type. This evidence validates the intended action: Select an appropriate P2S tunnel type such as OpenVPN or IKEv2 based on actual client support. It specifically tests the technical mechanism: VPN protocol compatibility varies by operating system, client and authentication mode. The ongoing check is: Maintain a client/protocol compatibility matrix as devices change.

Incorrect Answers

A:

A supported Windows Server establishes the intended Azure connection and resolves target subnets. The required validation here instead depends on the fact that a supported Windows and macOS client connect securely with the selected tunnel type.

C:

Authorized users connect and a disabled user account is denied. The required validation here instead depends on the fact that a supported Windows and macOS client connect securely with the selected tunnel type.

D:

A managed device reconnects according to the intended user/device tunnel trigger. The required validation here instead depends on the fact that a supported Windows and macOS client connect securely with the selected tunnel type.

Question 495

An engineering team assumes that enabling VNet flow logs also enables packet payload capture and full application traces. Which test outcome is MOST relevant to this failure?

  1. IP flow verify reports the intended rule for a controlled probe.
  2. A controlled denied connection maps to its expected source/destination and action.
  3. A test flow appears as metadata without asserting payload inspection.
  4. Approved package endpoints connect while unapproved destinations remain blocked.

Explanation

Correct Answer

C:

A test flow appears as metadata without asserting payload inspection. This evidence validates the intended action: Use flow logs for metadata and separate approved packet capture when deeper diagnostics are required. It specifically tests the technical mechanism: Flow records summarize connections and are not full packet payload capture. The ongoing check is: Document scope and privacy controls for each diagnostic source.

Incorrect Answers

A:

IP flow verify reports the intended rule for a controlled probe. The required validation here instead depends on the fact that a test flow appears as metadata without asserting payload inspection.

B:

A controlled denied connection maps to its expected source/destination and action. The required validation here instead depends on the fact that a test flow appears as metadata without asserting payload inspection.

D:

Approved package endpoints connect while unapproved destinations remain blocked. The required validation here instead depends on the fact that a test flow appears as metadata without asserting payload inspection.

Question 496

Two overlapping system and custom routes exist and the operator picks the route with the oldest creation timestamp. Which observed result BEST confirms the specific network issue has been resolved?

  1. Effective-route and flow checks show the approved private endpoint inspection path.
  2. The subnet's effective routes select the firewall for controlled egress.
  3. Route diagnostics show the intended firewall interface and application sessions succeed.
  4. A controlled packet resolves through the route chosen by the effective route table.

Explanation

Correct Answer

D:

A controlled packet resolves through the route chosen by the effective route table. This evidence validates the intended action: Apply effective route selection by longest prefix and supported source precedence, not creation time. It specifically tests the technical mechanism: Route precedence is defined by address specificity and route source rather than object age. The ongoing check is: Review overlapping prefixes whenever introducing default or propagated routes.

Incorrect Answers

A:

Effective-route and flow checks show the approved private endpoint inspection path. The required validation here instead depends on the fact that a controlled packet resolves through the route chosen by the effective route table.

B:

The subnet's effective routes select the firewall for controlled egress. The required validation here instead depends on the fact that a controlled packet resolves through the route chosen by the effective route table.

C:

Route diagnostics show the intended firewall interface and application sessions succeed. The required validation here instead depends on the fact that a controlled packet resolves through the route chosen by the effective route table.

Question 497

A team believes a high Secure Score proves its new internet-facing network has no exploitable path. What acceptance test most directly establishes that the change works?

  1. Targeted negative access tests identify risky paths despite favorable summary metrics.
  2. A controlled validation confirms the risky sequence is blocked after remediation.
  3. The diagnostic identifies the unexpected next hop and a corrected route restores access.
  4. A reanalysis no longer finds the public-to-database exposure path.

Explanation

Correct Answer

A:

Targeted negative access tests identify risky paths despite favorable summary metrics. This evidence validates the intended action: Use Secure Score alongside flow, identity, topology and penetration-test evidence. It specifically tests the technical mechanism: A posture score is not a complete proof of network safety or exploitability. The ongoing check is: Audit high-impact exceptions independently of the aggregate score.

Incorrect Answers

B:

A controlled validation confirms the risky sequence is blocked after remediation. The required validation here instead depends on the fact that targeted negative access tests identify risky paths despite favorable summary metrics.

C:

The diagnostic identifies the unexpected next hop and a corrected route restores access. The required validation here instead depends on the fact that targeted negative access tests identify risky paths despite favorable summary metrics.

D:

A reanalysis no longer finds the public-to-database exposure path. The required validation here instead depends on the fact that targeted negative access tests identify risky paths despite favorable summary metrics.

Question 498

A multinational SaaS app needs DNS-based routing to the closest healthy regional endpoint. What should the team validate before accepting the networking change?

  1. A controlled flow traverses the expected appliance while application endpoints remain reachable.
  2. DNS answers direct representative clients to expected healthy regional endpoints.
  3. Approved private clients connect and Internet clients cannot reach the private frontend.
  4. A simulated regional backend outage sends test connections to the surviving region.

Explanation

Correct Answer

B:

DNS answers direct representative clients to expected healthy regional endpoints. This evidence validates the intended action: Configure Azure Traffic Manager performance routing and endpoint monitoring. It specifically tests the technical mechanism: Traffic Manager makes DNS-level routing decisions rather than proxying TCP packets. The ongoing check is: Review resolver caching and endpoint-probe health thresholds.

Incorrect Answers

A:

A controlled flow traverses the expected appliance while application endpoints remain reachable. The required validation here instead depends on the fact that DNS answers direct representative clients to expected healthy regional endpoints.

C:

Approved private clients connect and Internet clients cannot reach the private frontend. The required validation here instead depends on the fact that DNS answers direct representative clients to expected healthy regional endpoints.

D:

A simulated regional backend outage sends test connections to the surviving region. The required validation here instead depends on the fact that DNS answers direct representative clients to expected healthy regional endpoints.

Question 499

A workload has a private endpoint but requests fail because its custom DNS server uses stale conditional forwarder targets. Which test outcome is MOST relevant to this failure?

  1. The approved database FQDN resolves to and connects through the correct endpoint.
  2. Controlled blob and file requests each use the correct endpoint and FQDN.
  3. A lookup through the custom DNS server returns the correct private address after correction.
  4. Two approved customers reach the service with correct app-level authorization and logging.

Explanation

Correct Answer

C:

A lookup through the custom DNS server returns the correct private address after correction. This evidence validates the intended action: Update custom DNS forwarding to the approved Private Resolver or Azure DNS resolution path. It specifically tests the technical mechanism: Hybrid DNS forwarding must resolve the service's privatelink CNAME chain to its private IP. The ongoing check is: Track forwarder and DNS Private Resolver health along with endpoint state.

Incorrect Answers

A:

The approved database FQDN resolves to and connects through the correct endpoint. The required validation here instead depends on the fact that a lookup through the custom DNS server returns the correct private address after correction.

B:

Controlled blob and file requests each use the correct endpoint and FQDN. The required validation here instead depends on the fact that a lookup through the custom DNS server returns the correct private address after correction.

D:

Two approved customers reach the service with correct app-level authorization and logging. The required validation here instead depends on the fact that a lookup through the custom DNS server returns the correct private address after correction.

Question 500

A web app requires end-to-end encryption, but the gateway forwards to servers over HTTP and security assumes TLS remains intact. Which observed result BEST confirms the specific network issue has been resolved?

  1. A controlled backend connection resolves and reaches the new target reliably.
  2. A request completes using HTTPS to the configured backend port.
  3. /pay and /help route to different backend pools via the HTTPS listener.
  4. TLS validation succeeds at both client and backend connection boundaries.

Explanation

Correct Answer

D:

TLS validation succeeds at both client and backend connection boundaries. This evidence validates the intended action: Configure HTTPS listeners and HTTPS backend settings with trusted certificates. It specifically tests the technical mechanism: TLS termination at the frontend does not automatically encrypt the gateway-to-backend hop. The ongoing check is: Protect trusted roots and automate certificate renewal.

Incorrect Answers

A:

A controlled backend connection resolves and reaches the new target reliably. The required validation here instead depends on the fact that TLS validation succeeds at both client and backend connection boundaries.

B:

A request completes using HTTPS to the configured backend port. The required validation here instead depends on the fact that TLS validation succeeds at both client and backend connection boundaries.

C:

/pay and /help route to different backend pools via the HTTPS listener. The required validation here instead depends on the fact that TLS validation succeeds at both client and backend connection boundaries.