McAfee Secure

Exam Code: NS0-165

Exam Name: NetApp Certified Data Administrator, ONTAP

Certification Provider: Network Appliance

Corresponding Certification: NCDA ONTAP

Network Appliance NS0-165 Questions & Answers

Study with Up-To-Date REAL Exam Questions and Answers from the ACTUAL Test

60 Questions & Answers with Testing Engine

"NetApp Certified Data Administrator, ONTAP Exam", also known as NS0-165 exam, is a Network Appliance certification exam.

Pass your tests with the always up-to-date NS0-165 Exam Engine. Your NS0-165 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Network Appliance NS0-165 Practice Test 64

Question 630

At the Northbridge logistics data center team, a production file server relies on snapshots stored on the same failed storage system as its only backup. What underlying problem most directly explains the observed behavior?

  1. A storage-consistent point-in-time image may not satisfy transactional application recovery requirements
  2. Local snapshots alone do not protect data from total loss of the underlying storage system
  3. Site transition requires coordinated data state and client reachability not just an administrator command
  4. Controller HA cannot substitute for a geographically separate protected storage fault domain

Explanation

Correct Answer

B:

The specific data failure is that local snapshots alone do not protect data from total loss of the underlying storage system. It can be addressed through the controlled change to maintain a verified independent backup or replica outside the primary failure domain. This result addresses the stated challenge at the Northbridge logistics data center team.

Incorrect Answers

A:

The proposed cause is relevant to snapcenter application consistency, but it does not explain why local snapshots alone do not protect data from total loss of the underlying storage system in the reported case. For the Northbridge logistics data center team, the direct corrective action is to maintain a verified independent backup or replica outside the primary failure domain.

C:

“Site transition requires coordinated data state and client reachability not just an administrator command” is not the controlling explanation for at the Northbridge logistics data center team, a production file server relies on snapshots stored on the same failed storage system as its only backup. The cited causal relationship is local snapshots alone do not protect data from total loss of the underlying storage system. The matching answer is “Local snapshots alone do not protect data from total loss of the underlying storage system”.

D:

Although controller HA cannot substitute for a geographically separate protected storage fault domain, the presented symptoms do not support that as the primary cause; they indicate that local snapshots alone do not protect data from total loss of the underlying storage system. For the Northbridge logistics data center team, the direct corrective action is to maintain a verified independent backup or replica outside the primary failure domain.

Question 631

At the Northbridge logistics data center team, a production file server relies on snapshots stored on the same failed storage system as its only backup. What evidence would justify marking this issue resolved?

  1. A test update completes and destination capacity remains within the defined buffer
  2. A controlled test validates application IO and consistency against documented supported failover behavior
  3. A controlled resync completes with the intended current primary and secondary assignments
  4. A primary-system outage exercise restores data from the independent protected copy

Explanation

Correct Answer

D:

This is the relevant acceptance result: a primary-system outage exercise restores data from the independent protected copy. It demonstrates the outcome of choosing to maintain a verified independent backup or replica outside the primary failure domain. This result addresses the stated challenge at the Northbridge logistics data center team.

Incorrect Answers

A:

The alternative checks whether a test update completes and destination capacity remains within the defined buffer, which is not the direct acceptance criterion for the stated problem. The required result is that a primary-system outage exercise restores data from the independent protected copy. For the Northbridge logistics data center team, the direct corrective action is to maintain a verified independent backup or replica outside the primary failure domain.

B:

This result would validate snapmirror active sync protection, not the intended improvement. The needed observation is that a primary-system outage exercise restores data from the independent protected copy. For the Northbridge logistics data center team, the direct corrective action is to maintain a verified independent backup or replica outside the primary failure domain.

C:

Evidence that “A controlled resync completes with the intended current primary and secondary assignments” occurred would not by itself establish resolution of the reported problem: at the Northbridge logistics data center team, a production file server relies on snapshots stored on the same failed storage system as its only backup. The specific reason is local snapshots alone do not protect data from total loss of the underlying storage system. The applicable verification is “A primary-system outage exercise restores data from the independent protected copy”.

Question 632

At the Northbridge logistics data center team, a production file server relies on snapshots stored on the same failed storage system as its only backup. What follow-up practice would reduce this risk over time?

  1. Audit policy labels after protection schedule changes
  2. Revalidate RTO and RPO when business service tiers change
  3. Review backup location and restore tests when infrastructure topology changes
  4. Review client routing and name service recovery when sites change

Explanation

Correct Answer

C:

The continuing safeguard is to review backup location and restore tests when infrastructure topology changes. It helps avoid the original condition: local snapshots alone do not protect data from total loss of the underlying storage system. This result addresses the stated challenge at the Northbridge logistics data center team.

Incorrect Answers

A:

The option would have the team audit policy labels after protection schedule changes. For this situation, the preventive control should instead be to review backup location and restore tests when infrastructure topology changes. For the Northbridge logistics data center team, the direct corrective action is to maintain a verified independent backup or replica outside the primary failure domain.

B:

“Revalidate RTO and RPO when business service tiers change” checks a different ongoing risk rather than the reported failure: at the Northbridge logistics data center team, a production file server relies on snapshots stored on the same failed storage system as its only backup. The relevant mechanism is local snapshots alone do not protect data from total loss of the underlying storage system. The directly matched preventive control is “Review backup location and restore tests when infrastructure topology changes”.

D:

“Review client routing and name service recovery when sites change” checks a different ongoing risk rather than the reported failure: at the Northbridge logistics data center team, a production file server relies on snapshots stored on the same failed storage system as its only backup. The relevant mechanism is local snapshots alone do not protect data from total loss of the underlying storage system. The directly matched preventive control is “Review backup location and restore tests when infrastructure topology changes”.

Question 633

At the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. Which design decision is the best response?

  1. Design separate local HA and remote DR capabilities matched to the failure scenarios
  2. Evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs
  3. Set an appropriate SnapMirror policy and schedule and monitor the actual transfer completion
  4. Evaluate supported SnapLock compliance or governance retention configuration with legal approval

Explanation

Correct Answer

B:

For the Ashbourne environmental data center, the appropriate correction is to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs. The decisive reason is that controller HA cannot substitute for a geographically separate protected storage fault domain; acceptance evidence is that an approved site-disruption exercise demonstrates the expected protected data availability or switchover.

Incorrect Answers

A:

Design separate local HA and remote DR capabilities matched to the failure scenarios can be useful for another workload, but it leaves the immediate failure unresolved. Here the priority is to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs. For the Ashbourne environmental data center, the direct corrective action is to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs.

C:

This alternative would be suitable where a defined relationship does not guarantee that current changes reach the remote copy on time. It does not by itself resolve the need to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs. For the Ashbourne environmental data center, the direct corrective action is to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs.

D:

Evaluate supported SnapLock compliance or governance retention configuration with legal approval addresses a different kind of problem: ordinary writable snapshots do not automatically supply the same retention enforcement as a compliant WORM archive. Here the reported weakness is that controller HA cannot substitute for a geographically separate protected storage fault domain. For the Ashbourne environmental data center, the direct corrective action is to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs.

Question 634

At the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. Which explanation best accounts for the failure?

  1. Local takeover protects controller events but shares a physical site failure domain
  2. Replication optimized for recent DR does not automatically retain the full audit history
  3. Controller HA cannot substitute for a geographically separate protected storage fault domain
  4. A defined relationship does not guarantee that current changes reach the remote copy on time

Explanation

Correct Answer

C:

The situation shows that controller HA cannot substitute for a geographically separate protected storage fault domain, rather than merely a monitoring or presentation issue. Remediation is to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs. This result addresses the stated challenge at the Ashbourne environmental data center.

Incorrect Answers

A:

“Local takeover protects controller events but shares a physical site failure domain” is not the controlling explanation for at the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. The matching answer is “Controller HA cannot substitute for a geographically separate protected storage fault domain”.

B:

Although replication optimized for recent DR does not automatically retain the full audit history, the presented symptoms do not support that as the primary cause; they indicate that controller HA cannot substitute for a geographically separate protected storage fault domain. For the Ashbourne environmental data center, the direct corrective action is to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs.

D:

A defined relationship does not guarantee that current changes reach the remote copy on time. That may occur elsewhere, but the evidence at the Ashbourne environmental data center instead points to the fact that controller HA cannot substitute for a geographically separate protected storage fault domain.

Question 635

At the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. What evidence would best demonstrate that the requirement is met?

  1. An approved site-disruption exercise demonstrates the expected protected data availability or switchover
  2. A recovery exercise distinguishes successful controller takeover from an approved remote site restoration
  3. A scheduled test creates the required recovery point and reports no related errors
  4. Measured lag returns within target across representative high-change periods

Explanation

Correct Answer

A:

At the Ashbourne environmental data center, evidence that an approved site-disruption exercise demonstrates the expected protected data availability or switchover directly validates the correction, instead of testing a neighboring service.

Incorrect Answers

B:

Evidence that “A recovery exercise distinguishes successful controller takeover from an approved remote site restoration” occurred would not by itself establish resolution of the reported problem: at the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. The applicable verification is “An approved site-disruption exercise demonstrates the expected protected data availability or switchover”.

C:

Evidence that “A scheduled test creates the required recovery point and reports no related errors” occurred would not by itself establish resolution of the reported problem: at the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. The applicable verification is “An approved site-disruption exercise demonstrates the expected protected data availability or switchover”.

D:

At the Ashbourne environmental data center, a result about replication lag exceeding rpo would not show that the team corrected the failure where controller HA cannot substitute for a geographically separate protected storage fault domain.

Question 636

At the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. Which ongoing control best prevents this failure from recurring?

  1. Review intersite links and quorum requirements after data-center changes
  2. Recheck mediator and host configurations during site maintenance
  3. Require initial transfer verification before reporting remote protection active
  4. Review snapshot retention and capacity after changing recovery requirements

Explanation

Correct Answer

A:

The continuing safeguard is to review intersite links and quorum requirements after data-center changes. It helps avoid the original condition: controller HA cannot substitute for a geographically separate protected storage fault domain. This result addresses the stated challenge at the Ashbourne environmental data center.

Incorrect Answers

B:

“Recheck mediator and host configurations during site maintenance” checks a different ongoing risk rather than the reported failure: at the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. The directly matched preventive control is “Review intersite links and quorum requirements after data-center changes”.

C:

Require initial transfer verification before reporting remote protection active is not the primary recurring safeguard for this problem. The team should review intersite links and quorum requirements after data-center changes. For the Ashbourne environmental data center, the direct corrective action is to evaluate a supported NetApp MetroCluster architecture for the required site-level availability and synchronous replication needs.

D:

“Review snapshot retention and capacity after changing recovery requirements” checks a different ongoing risk rather than the reported failure: at the Ashbourne environmental data center, a critical file service requires recovery from a complete storage-site failure but is deployed with only local HA peers. The directly matched preventive control is “Review intersite links and quorum requirements after data-center changes”.

Question 637

At the Quayside manufacturing storage support department, a SAN application requires a supported near-continuous service model between sites but uses only infrequent asynchronous replication. Which implementation choice best addresses the issue?

  1. Design separate local HA and remote DR capabilities matched to the failure scenarios
  2. Investigate transfer schedule source change rate intercluster bandwidth and destination capacity
  3. Set an appropriate SnapMirror policy and schedule and monitor the actual transfer completion
  4. Assess SnapMirror active sync and host requirements for the intended synchronous protection topology

Explanation

Correct Answer

D:

The primary failure mode is that periodic remote copies can leave a larger data gap and require different failover actions than synchronous service protection. The proposed action directly fixes it by requiring the team to assess SnapMirror active sync and host requirements for the intended synchronous protection topology; afterward, verify that a controlled test validates application IO and consistency against documented supported failover behavior. This result addresses the stated challenge at the Quayside manufacturing storage support department.

Incorrect Answers

A:

This alternative would be suitable where local takeover protects controller events but shares a physical site failure domain. It does not by itself resolve the need to assess SnapMirror active sync and host requirements for the intended synchronous protection topology. For the Quayside manufacturing storage support department, the direct corrective action is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology.

B:

Investigate transfer schedule source change rate intercluster bandwidth and destination capacity addresses a different kind of problem: a healthy source volume does not guarantee its remote update completes within the recovery objective. Here the reported weakness is that periodic remote copies can leave a larger data gap and require different failover actions than synchronous service protection. For the Quayside manufacturing storage support department, the direct corrective action is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology.

C:

The option addresses the separate situation where a defined relationship does not guarantee that current changes reach the remote copy on time. For this case, the more appropriate response is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology. For the Quayside manufacturing storage support department, the direct corrective action is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology.

Question 638

At the Quayside manufacturing storage support department, a SAN application requires a supported near-continuous service model between sites but uses only infrequent asynchronous replication. Which issue should the team identify as the primary cause?

  1. Local takeover protects controller events but shares a physical site failure domain
  2. Periodic remote copies can leave a larger data gap and require different failover actions than synchronous service protection
  3. Recovering bytes alone may not recreate required file-service settings and client namespace availability
  4. Ordinary writable snapshots do not automatically supply the same retention enforcement as a compliant WORM archive

Explanation

Correct Answer

B:

This identifies the root issue: periodic remote copies can leave a larger data gap and require different failover actions than synchronous service protection. At the Quayside manufacturing storage support department, the team should therefore assess SnapMirror active sync and host requirements for the intended synchronous protection topology.

Incorrect Answers

A:

“Local takeover protects controller events but shares a physical site failure domain” is not the controlling explanation for at the Quayside manufacturing storage support department, a SAN application requires a supported near-continuous service model between sites but uses only infrequent asynchronous replication. The matching answer is “Periodic remote copies can leave a larger data gap and require different failover actions than synchronous service protection”.

C:

The proposed cause is relevant to svm disaster recovery scope, but it does not explain why periodic remote copies can leave a larger data gap and require different failover actions than synchronous service protection in the reported case. For the Quayside manufacturing storage support department, the direct corrective action is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology.

D:

Ordinary writable snapshots do not automatically supply the same retention enforcement as a compliant WORM archive. That is not the mechanism that accounts for the stated failure at the Quayside manufacturing storage support department.

Question 639

At the Quayside manufacturing storage support department, a SAN application requires a supported near-continuous service model between sites but uses only infrequent asynchronous replication. What is the strongest acceptance test for this improvement?

  1. A controlled test validates application IO and consistency against documented supported failover behavior
  2. A planned switchover achieves the intended storage access with a documented data-consistency result
  3. A scheduled update retains the required labeled monthly snapshots on the destination
  4. Snapshot inventory contains the approved hourly or daily recovery points across the intended interval

Explanation

Correct Answer

A:

Because periodic remote copies can leave a larger data gap and require different failover actions than synchronous service protection, the required evidence must show that a controlled test validates application IO and consistency against documented supported failover behavior. A green job status alone is insufficient. This result addresses the stated challenge at the Quayside manufacturing storage support department.

Incorrect Answers

B:

At the Quayside manufacturing storage support department, a result about planned site switchover readiness would not show that the team corrected the failure where periodic remote copies can leave a larger data gap and require different failover actions than synchronous service protection.

C:

The alternative checks whether a scheduled update retains the required labeled monthly snapshots on the destination, which is not the direct acceptance criterion for the stated problem. The required result is that a controlled test validates application IO and consistency against documented supported failover behavior. For the Quayside manufacturing storage support department, the direct corrective action is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology.

D:

This result would validate snapshot policy recovery points, not the intended improvement. The needed observation is that a controlled test validates application IO and consistency against documented supported failover behavior. For the Quayside manufacturing storage support department, the direct corrective action is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology.

Question 640

At the Quayside manufacturing storage support department, a SAN application requires a supported near-continuous service model between sites but uses only infrequent asynchronous replication. What should be monitored or reviewed during future changes?

  1. Rehearse switchover and switchback after topology or host changes
  2. Alert on protection lag and recurring missed schedules
  3. Require initial transfer verification before reporting remote protection active
  4. Recheck mediator and host configurations during site maintenance

Explanation

Correct Answer

D:

For the Quayside manufacturing storage support department, this maintenance action preserves the fix: recheck mediator and host configurations during site maintenance. It should be revisited as the workload evolves.

Incorrect Answers

A:

Rehearse switchover and switchback after topology or host changes is not the primary recurring safeguard for this problem. The team should recheck mediator and host configurations during site maintenance. For the Quayside manufacturing storage support department, the direct corrective action is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology.

B:

“Alert on protection lag and recurring missed schedules” checks a different ongoing risk rather than the reported failure: at the Quayside manufacturing storage support department, a SAN application requires a supported near-continuous service model between sites but uses only infrequent asynchronous replication. The directly matched preventive control is “Recheck mediator and host configurations during site maintenance”.

C:

The option would have the team require initial transfer verification before reporting remote protection active. For this situation, the preventive control should instead be to recheck mediator and host configurations during site maintenance. For the Quayside manufacturing storage support department, the direct corrective action is to assess SnapMirror active sync and host requirements for the intended synchronous protection topology.