McAfee Secure

Exam Code: NS0-165

Exam Name: NetApp Certified Data Administrator, ONTAP

Certification Provider: Network Appliance

Corresponding Certification: NCDA ONTAP

Network Appliance NS0-165 Questions & Answers

Study with Up-To-Date REAL Exam Questions and Answers from the ACTUAL Test

60 Questions & Answers with Testing Engine

"NetApp Certified Data Administrator, ONTAP Exam", also known as NS0-165 exam, is a Network Appliance certification exam.

Pass your tests with the always up-to-date NS0-165 Exam Engine. Your NS0-165 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Network Appliance NS0-165 Practice Test 80

Question 790

At the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. Which explanation best accounts for the failure?

  1. Network queuing or packet loss can raise observed file service latency without disk saturation
  2. Competing storage workloads can affect response time even when capacity is available
  3. Data IO may traverse an indirect HA path even though the LUN and host are online
  4. Capacity charts alone do not explain when and where IO service delay increases

Explanation

Correct Answer

C:

The situation shows that data IO may traverse an indirect HA path even though the LUN and host are online, rather than merely a monitoring or presentation issue. Remediation is to validate host MPIO path selection and LUN ownership to restore eligible optimized routes. This result addresses the stated challenge at the Quayside energy-sector storage operations group.

Incorrect Answers

A:

“Network queuing or packet loss can raise observed file service latency without disk saturation” is not the controlling explanation for at the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. The matching answer is “Data IO may traverse an indirect HA path even though the LUN and host are online”.

B:

Although competing storage workloads can affect response time even when capacity is available, the presented symptoms do not support that as the primary cause; they indicate that data IO may traverse an indirect HA path even though the LUN and host are online. For the Quayside energy-sector storage operations group, the direct corrective action is to validate host MPIO path selection and LUN ownership to restore eligible optimized routes.

D:

Capacity charts alone do not explain when and where IO service delay increases. That may occur elsewhere, but the evidence at the Quayside energy-sector storage operations group instead points to the fact that data IO may traverse an indirect HA path even though the LUN and host are online.

Question 791

At the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. What evidence would best demonstrate that the requirement is met?

  1. A controlled network correction restores client response times and reduces switch errors
  2. The review identifies the affected volume and interval with correlated performance indicators
  3. A representative application test meets its defined latency and throughput objectives simultaneously
  4. The host uses expected optimized paths and database latency improves in a test

Explanation

Correct Answer

D:

The team can confirm the fix by showing that the host uses expected optimized paths and database latency improves in a test. This aligns with the corrective design to validate host MPIO path selection and LUN ownership to restore eligible optimized routes. This result addresses the stated challenge at the Quayside energy-sector storage operations group.

Incorrect Answers

A:

Evidence that “A controlled network correction restores client response times and reduces switch errors” occurred would not by itself establish resolution of the reported problem: at the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. The applicable verification is “The host uses expected optimized paths and database latency improves in a test”.

B:

Evidence that “The review identifies the affected volume and interval with correlated performance indicators” occurred would not by itself establish resolution of the reported problem: at the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. The applicable verification is “The host uses expected optimized paths and database latency improves in a test”.

C:

Evidence that “A representative application test meets its defined latency and throughput objectives simultaneously” occurred would not by itself establish resolution of the reported problem: at the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. The applicable verification is “The host uses expected optimized paths and database latency improves in a test”.

Question 792

At the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. Which ongoing control best prevents this failure from recurring?

  1. Monitor ALUA path preference after storage failover and volume movement
  2. Review inherited and direct QoS policies during provisioning
  3. Reassess health and performance recommendations during operational reviews
  4. Record cross-layer baselines when introducing new applications

Explanation

Correct Answer

A:

The continuing safeguard is to monitor ALUA path preference after storage failover and volume movement. It helps avoid the original condition: data IO may traverse an indirect HA path even though the LUN and host are online. This result addresses the stated challenge at the Quayside energy-sector storage operations group.

Incorrect Answers

B:

“Review inherited and direct QoS policies during provisioning” checks a different ongoing risk rather than the reported failure: at the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. The directly matched preventive control is “Monitor ALUA path preference after storage failover and volume movement”.

C:

Reassess health and performance recommendations during operational reviews is not the primary recurring safeguard for this problem. The team should monitor ALUA path preference after storage failover and volume movement. For the Quayside energy-sector storage operations group, the direct corrective action is to validate host MPIO path selection and LUN ownership to restore eligible optimized routes.

D:

“Record cross-layer baselines when introducing new applications” checks a different ongoing risk rather than the reported failure: at the Quayside energy-sector storage operations group, a database LUN responds slowly after a SAN change because the host favors nonoptimized ALUA paths. The directly matched preventive control is “Monitor ALUA path preference after storage failover and volume movement”.

Question 793

At the Cedarport travel platform storage administrators, a write-heavy application experiences space and latency warnings while snapshot retained blocks grow rapidly. Which implementation choice best addresses the issue?

  1. Inspect the effective ONTAP QoS policy and revise an incorrectly applied limit under change control
  2. Check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings
  3. Collect historical ONTAP performance and workload telemetry during representative peak periods
  4. Use ONTAP System Manager performance views to inspect affected workloads and historical latency

Explanation

Correct Answer

B:

Check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings is the best response because high data churn with many retained recovery points can create capacity pressure and operational degradation. A focused validation would establish that a controlled retention and capacity correction restores space headroom with service latency within target. This result addresses the stated challenge at the Cedarport travel platform storage administrators.

Incorrect Answers

A:

This alternative would be suitable where a throughput ceiling can originate in an explicit policy rather than exhausted hardware performance. It does not by itself resolve the need to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings. For the Cedarport travel platform storage administrators, the direct corrective action is to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings.

C:

The option addresses the separate situation where intermittent contention can be invisible when measurements exclude actual peak traffic. For this case, the more appropriate response is to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings. For the Cedarport travel platform storage administrators, the direct corrective action is to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings.

D:

This focuses on ontap system manager performance dashboard; it does not directly correct the condition that high data churn with many retained recovery points can create capacity pressure and operational degradation. For the Cedarport travel platform storage administrators, the direct corrective action is to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings.

Question 794

At the Cedarport travel platform storage administrators, a write-heavy application experiences space and latency warnings while snapshot retained blocks grow rapidly. Which issue should the team identify as the primary cause?

  1. High data churn with many retained recovery points can create capacity pressure and operational degradation
  2. Background operations can compete for storage resources with foreground application requests
  3. Competing storage workloads can affect response time even when capacity is available
  4. Intermittent contention can be invisible when measurements exclude actual peak traffic

Explanation

Correct Answer

A:

The situation shows that high data churn with many retained recovery points can create capacity pressure and operational degradation, rather than merely a monitoring or presentation issue. Remediation is to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings. This result addresses the stated challenge at the Cedarport travel platform storage administrators.

Incorrect Answers

B:

Background operations can compete for storage resources with foreground application requests. That may occur elsewhere, but the evidence at the Cedarport travel platform storage administrators instead points to the fact that high data churn with many retained recovery points can create capacity pressure and operational degradation.

C:

The proposed cause is relevant to qos workload policy monitoring, but it does not explain why high data churn with many retained recovery points can create capacity pressure and operational degradation in the reported case. For the Cedarport travel platform storage administrators, the direct corrective action is to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings.

D:

Intermittent contention can be invisible when measurements exclude actual peak traffic. That is not the mechanism that accounts for the stated failure at the Cedarport travel platform storage administrators.

Question 795

At the Cedarport travel platform storage administrators, a write-heavy application experiences space and latency warnings while snapshot retained blocks grow rapidly. What is the strongest acceptance test for this improvement?

  1. After a justified QoS adjustment the job reaches its approved target with other workloads protected
  2. A representative application test meets its defined latency and throughput objectives simultaneously
  3. A controlled retention and capacity correction restores space headroom with service latency within target
  4. A simultaneous load test protects the approved business workload response objective

Explanation

Correct Answer

C:

This tests the real business behavior: a controlled retention and capacity correction restores space headroom with service latency within target. It specifically checks whether the risk that high data churn with many retained recovery points can create capacity pressure and operational degradation has been reduced. This result addresses the stated challenge at the Cedarport travel platform storage administrators.

Incorrect Answers

A:

Evidence that “After a justified QoS adjustment the job reaches its approved target with other workloads protected” occurred would not by itself establish resolution of the reported problem: at the Cedarport travel platform storage administrators, a write-heavy application experiences space and latency warnings while snapshot retained blocks grow rapidly. The specific reason is high data churn with many retained recovery points can create capacity pressure and operational degradation. The applicable verification is “A controlled retention and capacity correction restores space headroom with service latency within target”.

B:

At the Cedarport travel platform storage administrators, a result about latency iops throughput distinction would not show that the team corrected the failure where high data churn with many retained recovery points can create capacity pressure and operational degradation.

D:

This result would validate qos workload policy monitoring, not the intended improvement. The needed observation is that a controlled retention and capacity correction restores space headroom with service latency within target. For the Cedarport travel platform storage administrators, the direct corrective action is to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings.

Question 796

At the Cedarport travel platform storage administrators, a write-heavy application experiences space and latency warnings while snapshot retained blocks grow rapidly. What should be monitored or reviewed during future changes?

  1. Monitor ALUA path preference after storage failover and volume movement
  2. Trend all three metrics when IO sizes or concurrency change
  3. Trend snapshot growth alongside workload write rates
  4. Record cross-layer baselines when introducing new applications

Explanation

Correct Answer

C:

The team should trend snapshot growth alongside workload write rates. That recurring practice targets the same weakness, namely that high data churn with many retained recovery points can create capacity pressure and operational degradation. This result addresses the stated challenge at the Cedarport travel platform storage administrators.

Incorrect Answers

A:

Monitor ALUA path preference after storage failover and volume movement is not the primary recurring safeguard for this problem. The team should trend snapshot growth alongside workload write rates. For the Cedarport travel platform storage administrators, the direct corrective action is to check snapshot consumed capacity retention and aggregate free space before tuning unrelated CPU settings.

B:

“Trend all three metrics when IO sizes or concurrency change” checks a different ongoing risk rather than the reported failure: at the Cedarport travel platform storage administrators, a write-heavy application experiences space and latency warnings while snapshot retained blocks grow rapidly. The relevant mechanism is high data churn with many retained recovery points can create capacity pressure and operational degradation. The directly matched preventive control is “Trend snapshot growth alongside workload write rates”.

D:

“Record cross-layer baselines when introducing new applications” checks a different ongoing risk rather than the reported failure: at the Cedarport travel platform storage administrators, a write-heavy application experiences space and latency warnings while snapshot retained blocks grow rapidly. The relevant mechanism is high data churn with many retained recovery points can create capacity pressure and operational degradation. The directly matched preventive control is “Trend snapshot growth alongside workload write rates”.

Question 797

At the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. Which solution most directly addresses the stated requirement?

  1. Inspect the effective ONTAP QoS policy and revise an incorrectly applied limit under change control
  2. Use ONTAP System Manager performance views to inspect affected workloads and historical latency
  3. Correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls
  4. Review applicable Active IQ and ONTAP performance analytics before selecting remediation

Explanation

Correct Answer

C:

The reported facts support this change rather than a general platform replacement. The team should correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls because background operations can compete for storage resources with foreground application requests. A suitable test confirms that a controlled scheduling change improves application response while preserving required backup completion. This result addresses the stated challenge at the Pinecrest subscription services data center.

Incorrect Answers

A:

The option addresses the separate situation where a throughput ceiling can originate in an explicit policy rather than exhausted hardware performance. For this case, the more appropriate response is to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls. For the Pinecrest subscription services data center, the direct corrective action is to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls.

B:

This focuses on ontap system manager performance dashboard; it does not directly correct the condition that background operations can compete for storage resources with foreground application requests. For the Pinecrest subscription services data center, the direct corrective action is to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls.

D:

The suggested action is to review applicable Active IQ and ONTAP performance analytics before selecting remediation, but the facts at the Pinecrest subscription services data center require a correction for the distinct problem that background operations can compete for storage resources with foreground application requests.

Question 798

At the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. What underlying problem most directly explains the observed behavior?

  1. A throughput ceiling can originate in an explicit policy rather than exhausted hardware performance
  2. Background operations can compete for storage resources with foreground application requests
  3. Higher operations per second alone does not establish acceptable service delay
  4. Capacity charts alone do not explain when and where IO service delay increases

Explanation

Correct Answer

B:

The specific data failure is that background operations can compete for storage resources with foreground application requests. It can be addressed through the controlled change to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls. This result addresses the stated challenge at the Pinecrest subscription services data center.

Incorrect Answers

A:

The proposed cause is relevant to qos throttling unexpected ceiling, but it does not explain why background operations can compete for storage resources with foreground application requests in the reported case. For the Pinecrest subscription services data center, the direct corrective action is to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls.

C:

“Higher operations per second alone does not establish acceptable service delay” is not the controlling explanation for at the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. The cited causal relationship is background operations can compete for storage resources with foreground application requests. The matching answer is “Background operations can compete for storage resources with foreground application requests”.

D:

Although capacity charts alone do not explain when and where IO service delay increases, the presented symptoms do not support that as the primary cause; they indicate that background operations can compete for storage resources with foreground application requests. For the Pinecrest subscription services data center, the direct corrective action is to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls.

Question 799

At the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. What evidence would justify marking this issue resolved?

  1. The host uses expected optimized paths and database latency improves in a test
  2. A controlled scheduling change improves application response while preserving required backup completion
  3. A root-cause review identifies a supported remedial action and measured improvement
  4. A measured test attributes dominant latency to a specific layer and confirms improvement after correction

Explanation

Correct Answer

B:

The intended correction is to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls. The decisive verification is that a controlled scheduling change improves application response while preserving required backup completion, rather than only confirming configuration was saved. This result addresses the stated challenge at the Pinecrest subscription services data center.

Incorrect Answers

A:

The alternative checks whether the host uses expected optimized paths and database latency improves in a test, which is not the direct acceptance criterion for the stated problem. The required result is that a controlled scheduling change improves application response while preserving required backup completion. For the Pinecrest subscription services data center, the direct corrective action is to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls.

C:

Evidence that “A root-cause review identifies a supported remedial action and measured improvement” occurred would not by itself establish resolution of the reported problem: at the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. The specific reason is background operations can compete for storage resources with foreground application requests. The applicable verification is “A controlled scheduling change improves application response while preserving required backup completion”.

D:

Evidence that “A measured test attributes dominant latency to a specific layer and confirms improvement after correction” occurred would not by itself establish resolution of the reported problem: at the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. The specific reason is background operations can compete for storage resources with foreground application requests. The applicable verification is “A controlled scheduling change improves application response while preserving required backup completion”.

Question 800

At the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. What follow-up practice would reduce this risk over time?

  1. Correlate network errors with storage latency during peak activity
  2. Reassess health and performance recommendations during operational reviews
  3. Review recurring background IO after protection and efficiency policy changes
  4. Trend all three metrics when IO sizes or concurrency change

Explanation

Correct Answer

C:

The continuing safeguard is to review recurring background IO after protection and efficiency policy changes. It helps avoid the original condition: background operations can compete for storage resources with foreground application requests. This result addresses the stated challenge at the Pinecrest subscription services data center.

Incorrect Answers

A:

The option would have the team correlate network errors with storage latency during peak activity. For this situation, the preventive control should instead be to review recurring background IO after protection and efficiency policy changes. For the Pinecrest subscription services data center, the direct corrective action is to correlate scheduled maintenance and protection IO with workload performance and adjust supported windows or resource controls.

B:

“Reassess health and performance recommendations during operational reviews” checks a different ongoing risk rather than the reported failure: at the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. The relevant mechanism is background operations can compete for storage resources with foreground application requests. The directly matched preventive control is “Review recurring background IO after protection and efficiency policy changes”.

D:

“Trend all three metrics when IO sizes or concurrency change” checks a different ongoing risk rather than the reported failure: at the Pinecrest subscription services data center, a volume shows higher latency when simultaneous efficiency or backup operations begin without a documented schedule. The relevant mechanism is background operations can compete for storage resources with foreground application requests. The directly matched preventive control is “Review recurring background IO after protection and efficiency policy changes”.