Question 160
Fictional Goldcrest Research runs the regional reporting workload at a metro data hall storage site. While completing service continuity review, the field handoff documents: Network engineers reserved switch interfaces for a two-controller array but omitted shelf and replication port requirements. The team requires a direct technical explanation and measured acceptance check. Which preventive control most directly reduces this failure risk?
Explanation
Correct Answer
The ongoing safeguard is: Reconcile topology drawings with approved port definitions at pre-install review. The recurring exposure to avoid is: The port reservation list does not cover the full approved deployment topology. A continuing effectiveness check is: The final patch schedule accounts for all intended roles and both controller sides.
Incorrect Answers
This alternative concerns: Capture cabinet depth and rail part numbers during pre-install site survey. It is associated with rail-depth compatibility, rather than the question’s determining condition. The case instead turns on: The port reservation list does not cover the full approved deployment topology. The more directly applicable prevention choice is: Reconcile topology drawings with approved port definitions at pre-install review.
The offered choice addresses: Include floor loading and future shelf expansion in the pre-visit site-readiness checklist. That concerns rack floor load clearance, rather than the specific failure described here. The deciding issue in this scenario is: The port reservation list does not cover the full approved deployment topology. The more directly applicable prevention choice is: Reconcile topology drawings with approved port definitions at pre-install review.
This option focuses on: Inspect both cabinet faces against maintenance diagrams during the site survey. That can be relevant to front and rear service clearance, but it does not establish the required case-specific result. The current case instead identifies: The port reservation list does not cover the full approved deployment topology. The more directly applicable prevention choice is: Reconcile topology drawings with approved port definitions at pre-install review.