Question 520
Fictional Duskridge Energy runs the operations dashboards workload at a district hub storage site. While completing support handoff, the field handoff documents: A replacement NVRAM component has an interface and generation designation not approved for the selected controller revision. The team requires a direct technical explanation and measured acceptance check. Which preventive control most directly reduces this failure risk?
Explanation
Correct Answer
The ongoing safeguard is: Validate NVRAM model numbers during hardware conversion planning. The recurring exposure to avoid is: The proposed write-persistence module is incompatible with the upgrade target. A continuing effectiveness check is: Post-upgrade hardware inventory detects the approved NVRAM type and a healthy write path.
Incorrect Answers
This alternative concerns: Treat each array family change as a new physical and interoperability review. It is associated with x to xl modernization constraints, rather than the question’s determining condition. The case instead turns on: The proposed write-persistence module is incompatible with the upgrade target. The more directly applicable prevention choice is: Validate NVRAM model numbers during hardware conversion planning.
The offered choice addresses: Include multipath path count and failover evidence in upgrade readiness. That concerns host multipath failover rehearsal, rather than the specific failure described here. The deciding issue in this scenario is: The proposed write-persistence module is incompatible with the upgrade target. The more directly applicable prevention choice is: Validate NVRAM model numbers during hardware conversion planning.
This option focuses on: Include temporary hardware requirements in capacity-transition site planning. That can be relevant to additional rack and power for swing gear, but it does not establish the required case-specific result. The current case instead identifies: The proposed write-persistence module is incompatible with the upgrade target. The more directly applicable prevention choice is: Validate NVRAM model numbers during hardware conversion planning.