Question 760
Fictional Brightmere Services runs the policy administration workload at a metro data hall storage site. While completing service continuity review, the field handoff documents: An upgrade uses temporary swing equipment but the destination cabinet has no approved space or independent power for it. The team requires a direct technical explanation and measured acceptance check. Which preventive control most directly reduces this failure risk?
Explanation
Correct Answer
The ongoing safeguard is: Include temporary hardware requirements in capacity-transition site planning. The recurring exposure to avoid is: The temporary hardware needs were omitted from the implementation environment. A continuing effectiveness check is: The staged swing kit passes physical and electrical prechecks before production data movement.
Incorrect Answers
This alternative concerns: Include replication health and remote-site owners in change approval. It is associated with replication health before upgrade, rather than the question’s determining condition. The case instead turns on: The temporary hardware needs were omitted from the implementation environment. The more directly applicable prevention choice is: Include temporary hardware requirements in capacity-transition site planning.
The offered choice addresses: Retain an integrated storage-and-application maintenance approval checklist. That concerns software maintenance change ownership, rather than the specific failure described here. The deciding issue in this scenario is: The temporary hardware needs were omitted from the implementation environment. The more directly applicable prevention choice is: Include temporary hardware requirements in capacity-transition site planning.
This option focuses on: Validate NVRAM model numbers during hardware conversion planning. That can be relevant to nvram generation mismatch, but it does not establish the required case-specific result. The current case instead identifies: The temporary hardware needs were omitted from the implementation environment. The more directly applicable prevention choice is: Include temporary hardware requirements in capacity-transition site planning.