Question 830
Fictional Pinnacle Services runs the lab record systems workload at a coastal facility storage site. While completing capacity change, the field handoff documents: The customer expects vendor remote support but remote connectivity checks fail after the array is commissioned. The team requires a direct technical explanation and measured acceptance check. Which preventive control most directly reduces this failure risk?
Explanation
Correct Answer
The ongoing safeguard is: Include remote-support reachability in the recurring management check. The recurring exposure to avoid is: Pure1 or RemoteAssist egress prerequisites or proxy routing may be missing. A continuing effectiveness check is: Vendor-supported phone-home or connectivity tests reach the intended service without bypassing security policy.
Incorrect Answers
The offered choice addresses: Include a guided read-only inventory walkthrough in post-install training. That concerns gui host and volume navigation, rather than the specific failure described here. The deciding issue in this scenario is: Pure1 or RemoteAssist egress prerequisites or proxy routing may be missing. The more directly applicable prevention choice is: Include remote-support reachability in the recurring management check.
This alternative concerns: Include representative hosts from each fabric and operating system in upgrade QA. It is associated with host multipathing after array upgrade, rather than the question’s determining condition. The case instead turns on: Pure1 or RemoteAssist egress prerequisites or proxy routing may be missing. The more directly applicable prevention choice is: Include remote-support reachability in the recurring management check.
The offered choice addresses: Monitor clock drift and record time-source configuration at handover. That concerns clock skew and event log correlation, rather than the specific failure described here. The deciding issue in this scenario is: Pure1 or RemoteAssist egress prerequisites or proxy routing may be missing. The more directly applicable prevention choice is: Include remote-support reachability in the recurring management check.