Question 60
A preventive architecture review covers this situation: A new IS-IS backbone connection has large unidirectional metric asymmetry, producing unexpected return paths. Which preventive design control MOST DIRECTLY addresses this specific risk?
Explanation
Correct Answer
Version-control metric policy and inspect SPF changes during circuit upgrades. This control targets the underlying design risk. IS-IS shortest-path selection is based on configured link-state costs, which may differ by direction. The follow-up acceptance check remains: The computed best paths follow documented metrics and traffic returns across an available intended path.
Incorrect Answers
Routing protocol authentication helps prevent unauthenticated devices from injecting link-state information. The repeat risk here is different: IS-IS shortest-path selection is based on configured link-state costs, which may differ by direction. A directly relevant preventive control is: Version-control metric policy and inspect SPF changes during circuit upgrades.
IS-IS Level 1 routers maintain area topology while Level 2 provides the interarea backbone. The repeat risk here is different: IS-IS shortest-path selection is based on configured link-state costs, which may differ by direction. A directly relevant preventive control is: Version-control metric policy and inspect SPF changes during circuit upgrades.
EIGRP variance permits qualifying feasible routes of unequal metric to participate in load sharing; it does not waive loop-free feasibility checks. The repeat risk here is different: IS-IS shortest-path selection is based on configured link-state costs, which may differ by direction. A directly relevant preventive control is: Version-control metric policy and inspect SPF changes during circuit upgrades.