McAfee Secure

Exam Code: ITILFND V5

Exam Name: ITIL Foundation (Version 5)

Certification Provider: ITIL

Corresponding Certification: ITIL Foundation (Version 5)

ITIL ITILFND V5 Questions & Answers

Study with Up-To-Date REAL Exam Questions and Answers from the ACTUAL Test

78 Questions & Answers with Testing Engine

"ITIL Foundation (Version 5) Exam", also known as ITILFND V5 exam, is a ITIL certification exam.

Pass your tests with the always up-to-date ITILFND V5 Exam Engine. Your ITILFND V5 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

ITIL ITILFND V5 Practice Test 77

Question 760

A college groups every activity under 'technology management' and cannot explain strategic coordination needs. Which long-term measure is most useful in this situation?

  1. Review value impact before adding technology requirements.
  2. Maintain diagnostic signals proportional to service risks.
  3. Review practice boundaries during operating-model changes.
  4. Review practice support whenever value-chain work changes.

Explanation

Correct Answer

C:

The continuing control addresses the recurring risk that ITIL management practices support a broad value system rather than a single technical discipline.

Incorrect Answers

A:

This safeguard maintains a different technical control: The safeguard sustains value by monitoring the concern that an improvement can increase activity while failing the service's intended purpose. The recurring risk here is governed by: The continuing control addresses the recurring risk that ITIL management practices support a broad value system rather than a single technical discipline. The relevant review is “Review practice boundaries during operating-model changes”.

B:

“Maintain diagnostic signals proportional to service risks” is a sensible check for: The safeguard sustains value by monitoring the concern that basic uptime measurements alone may not reveal the causes of performance anomalies. It is not the prevention measure for the current dependency: The continuing control addresses the recurring risk that ITIL management practices support a broad value system rather than a single technical discipline. The closer guardrail is “Review practice boundaries during operating-model changes”.

D:

That review tracks a separate failure mechanism: This is a practical follow-up for the risk that value chain activities rely on shared capabilities and management practices. The question requires sustained control over: The continuing control addresses the recurring risk that ITIL management practices support a broad value system rather than a single technical discipline. The corresponding safeguard is “Review practice boundaries during operating-model changes”.

Question 761

A logistics service records more incident tickets each month and automatically assumes its service reliability improved. Which follow-up control best sustains the improvement?

  1. Separate workload measures from effectiveness measures in practice reviews.
  2. Make consumer evidence available to both improvement and governance reviews.
  3. Tune monitoring and incident criteria based on observed service impact.
  4. Update the operating model after organizational or technology changes.

Explanation

Correct Answer

A:

This review is relevant over time because more activity is not evidence of a better result. It keeps the team alert to the same failure mode after the initial change.

Incorrect Answers

B:

“Make consumer evidence available to both improvement and governance reviews” acts on a neighboring technical dependency: This is a practical follow-up for the risk that value evidence loses influence when improvement and strategic oversight are disconnected. It does not resolve the stated condition, whose causal mechanism is: More activity is not evidence of a better result. The required action is “Separate workload measures from effectiveness measures in practice reviews”.

C:

This option would change the part of the system described by: This is a practical follow-up for the risk that an event is detectable operational information; not every event is a service interruption. The reported behavior instead arises because more activity is not evidence of a better result. The direct remediation is “Separate workload measures from effectiveness measures in practice reviews”.

D:

The continuing control addresses the recurring risk that an operating model explains how work is organized to achieve purpose, beyond a single workflow. That explains why “Update the operating model after organizational or technology changes” is useful for its own dependency, but the present failure follows a different constraint: More activity is not evidence of a better result. The targeted correction is “Separate workload measures from effectiveness measures in practice reviews”.

Question 762

A support organization revises its ticket tool but never checks whether the underlying management practice became more effective. Which long-term measure is most useful in this situation?

  1. Require benefit evaluation after improvement work.
  2. Assess outcomes whenever new tools are introduced.
  3. Share meaningful metrics in regular joint reviews.
  4. Review targets against changing consumer outcomes.

Explanation

Correct Answer

B:

The safeguard sustains value by monitoring the concern that a technical tool is an enabler, not a substitute for a functioning practice.

Incorrect Answers

A:

The alternate safeguard protects a separate dependency: This is a practical follow-up for the risk that activity completion does not prove that intended service results improved. For this failure the continuing exposure is: The safeguard sustains value by monitoring the concern that a technical tool is an enabler, not a substitute for a functioning practice. Maintain “Assess outcomes whenever new tools are introduced” instead.

C:

This safeguard maintains a different technical control: The safeguard sustains value by monitoring the concern that internal-only measurement omits consumer perspectives and shared information. The recurring risk here is governed by: The safeguard sustains value by monitoring the concern that a technical tool is an enabler, not a substitute for a functioning practice. The relevant review is “Assess outcomes whenever new tools are introduced”.

D:

“Review targets against changing consumer outcomes” is a sensible check for: A current-state measure alone cannot direct change without an intended outcome. It is not the prevention measure for the current dependency: The safeguard sustains value by monitoring the concern that a technical tool is an enabler, not a substitute for a functioning practice. The closer guardrail is “Assess outcomes whenever new tools are introduced”.

Question 763

A retail bank wants to improve its support journey but starts by buying automation without defining the problem. Which follow-up control best sustains the improvement?

  1. Require clear baseline and purpose for improvement initiatives.
  2. Baseline current assets and performance before major redesigns.
  3. Monitor outcomes across deployment, fulfilment and consumption.
  4. Use thresholds and feedback to govern each automation expansion.

Explanation

Correct Answer

A:

This is a practical follow-up for the risk that unclear goals and baseline information make improvement actions difficult to justify.

Incorrect Answers

B:

The continuing control addresses the recurring risk that ignoring existing resources risks discarding useful investments and context. That explains why “Baseline current assets and performance before major redesigns” is useful for its own dependency, but the present failure follows a different constraint: This is a practical follow-up for the risk that unclear goals and baseline information make improvement actions difficult to justify. The targeted correction is “Require clear baseline and purpose for improvement initiatives”.

C:

The proposed action focuses on a control governed by: Internal completion does not ensure the service is available or useful to intended consumers. In this question the binding condition is: This is a practical follow-up for the risk that unclear goals and baseline information make improvement actions difficult to justify. Applying “Require clear baseline and purpose for improvement initiatives” addresses that specific cause instead.

D:

“Use thresholds and feedback to govern each automation expansion” acts on a neighboring technical dependency: This is a practical follow-up for the risk that insufficient baseline evidence makes an immediate large-scale automated solution fragile. It does not resolve the stated condition, whose causal mechanism is: This is a practical follow-up for the risk that unclear goals and baseline information make improvement actions difficult to justify. The required action is “Require clear baseline and purpose for improvement initiatives”.

Question 764

A city service wants to reduce online permit delays but has no baseline of application processing time. Which long-term measure is most useful in this situation?

  1. Keep current-state measures available for later improvement cycles.
  2. Review investment benefits and priorities with accountable leaders.
  3. Document lessons from prototypes before approving build completion.
  4. Review metric relevance and remove measures without decision value.

Explanation

Correct Answer

A:

The continuing control addresses the recurring risk that without current evidence the team cannot prove whether delays improved.

Incorrect Answers

B:

“Review investment benefits and priorities with accountable leaders” is a sensible check for: The safeguard sustains value by monitoring the concern that budget allocation should be justified by organizational purpose and stakeholder expectations. It is not the prevention measure for the current dependency: The continuing control addresses the recurring risk that without current evidence the team cannot prove whether delays improved. The closer guardrail is “Keep current-state measures available for later improvement cycles”.

C:

The alternate safeguard protects a separate dependency: A prototype explores a solution; it does not by itself prove the complete production service meets needs. For this failure the continuing exposure is: The continuing control addresses the recurring risk that without current evidence the team cannot prove whether delays improved. Maintain “Keep current-state measures available for later improvement cycles” instead.

D:

That review tracks a separate failure mechanism: The continuing control addresses the recurring risk that a universal activity counter may not reflect a practice's desired result. The question requires sustained control over: The continuing control addresses the recurring risk that without current evidence the team cannot prove whether delays improved. The corresponding safeguard is “Keep current-state measures available for later improvement cycles”.

Question 765

An insurer measures customer complaints but has no defined target for what improvement should achieve. Which follow-up control best sustains the improvement?

  1. Share meaningful metrics in regular joint reviews.
  2. Require benefit evaluation after improvement work.
  3. Review request fulfilment controls and lead times.
  4. Review targets against changing consumer outcomes.

Explanation

Correct Answer

D:

This review is relevant over time because a current-state measure alone cannot direct change without an intended outcome. It keeps the team alert to the same failure mode after the initial change.

Incorrect Answers

A:

The proposed action focuses on a control governed by: The safeguard sustains value by monitoring the concern that internal-only measurement omits consumer perspectives and shared information. In this question the binding condition is: A current-state measure alone cannot direct change without an intended outcome. Applying “Review targets against changing consumer outcomes” addresses that specific cause instead.

B:

“Require benefit evaluation after improvement work” acts on a neighboring technical dependency: This is a practical follow-up for the risk that activity completion does not prove that intended service results improved. It does not resolve the stated condition, whose causal mechanism is: A current-state measure alone cannot direct change without an intended outcome. The required action is “Review targets against changing consumer outcomes”.

C:

This option would change the part of the system described by: This is a practical follow-up for the risk that routine fulfilment is different from restoring an interrupted service. The reported behavior instead arises because a current-state measure alone cannot direct change without an intended outcome. The direct remediation is “Review targets against changing consumer outcomes”.

Question 766

A university identifies its support backlog but proposes changes without selecting an accountable implementation plan. Which long-term measure is most useful in this situation?

  1. Review gaps across practice groups during service planning.
  2. Keep mandatory approvals explicit in the delivery pipeline.
  3. Review risks and dependencies before starting improvements.
  4. Maintain integrated practice guidance across related work.

Explanation

Correct Answer

C:

The safeguard sustains value by monitoring the concern that knowing a gap does not specify how a team will close it.

Incorrect Answers

A:

The alternate safeguard protects a separate dependency: The safeguard sustains value by monitoring the concern that a functioning product needs more than one technical operational function. For this failure the continuing exposure is: The safeguard sustains value by monitoring the concern that knowing a gap does not specify how a team will close it. Maintain “Review risks and dependencies before starting improvements” instead.

B:

That review tracks a separate failure mechanism: The continuing control addresses the recurring risk that release readiness can be automated without requiring automatic production rollout. The question requires sustained control over: The safeguard sustains value by monitoring the concern that knowing a gap does not specify how a team will close it. The corresponding safeguard is “Review risks and dependencies before starting improvements”.

D:

“Maintain integrated practice guidance across related work” is a sensible check for: The continuing control addresses the recurring risk that isolated procedures do not automatically form a coherent management capability. It is not the prevention measure for the current dependency: The safeguard sustains value by monitoring the concern that knowing a gap does not specify how a team will close it. The closer guardrail is “Review risks and dependencies before starting improvements”.

Question 767

A transport operator launches an improvement pilot but never checks whether the intended benefits materialize. Which follow-up control best sustains the improvement?

  1. Assess outcomes whenever new tools are introduced.
  2. Require benefit evaluation after improvement work.
  3. Review targets against changing consumer outcomes.
  4. Review request fulfilment controls and lead times.

Explanation

Correct Answer

B:

This is a practical follow-up for the risk that activity completion does not prove that intended service results improved.

Incorrect Answers

A:

This option would change the part of the system described by: The safeguard sustains value by monitoring the concern that a technical tool is an enabler, not a substitute for a functioning practice. The reported behavior instead arises because this is a practical follow-up for the risk that activity completion does not prove that intended service results improved. The direct remediation is “Require benefit evaluation after improvement work”.

C:

The proposed action focuses on a control governed by: A current-state measure alone cannot direct change without an intended outcome. In this question the binding condition is: This is a practical follow-up for the risk that activity completion does not prove that intended service results improved. Applying “Require benefit evaluation after improvement work” addresses that specific cause instead.

D:

“Review request fulfilment controls and lead times” acts on a neighboring technical dependency: This is a practical follow-up for the risk that routine fulfilment is different from restoring an interrupted service. It does not resolve the stated condition, whose causal mechanism is: This is a practical follow-up for the risk that activity completion does not prove that intended service results improved. The required action is “Require benefit evaluation after improvement work”.

Question 768

A digital publisher gains a measurable efficiency improvement and immediately stops all learning and review activities. Which long-term measure is most useful in this situation?

  1. Review the contribution of each Value System element periodically.
  2. Review relevance of practice guidance as the organization evolves.
  3. Maintain review cadence and capture lessons for future iterations.
  4. Periodically reassess the starting point for future improvements.

Explanation

Correct Answer

C:

The continuing control addresses the recurring risk that sustainable improvement requires adoption and further learning, not a single project closure.

Incorrect Answers

A:

This safeguard maintains a different technical control: The safeguard sustains value by monitoring the concern that the operating model omits governance and improvement relationships around the value chain. The recurring risk here is governed by: The continuing control addresses the recurring risk that sustainable improvement requires adoption and further learning, not a single project closure. The relevant review is “Maintain review cadence and capture lessons for future iterations”.

B:

“Review relevance of practice guidance as the organization evolves” is a sensible check for: Official practice guides offer reusable guidance, not a mandatory one-size-fits-all procedure. It is not the prevention measure for the current dependency: The continuing control addresses the recurring risk that sustainable improvement requires adoption and further learning, not a single project closure. The closer guardrail is “Maintain review cadence and capture lessons for future iterations”.

D:

That review tracks a separate failure mechanism: This is a practical follow-up for the risk that another organization's model may not fit existing operating conditions. The question requires sustained control over: The continuing control addresses the recurring risk that sustainable improvement requires adoption and further learning, not a single project closure. The corresponding safeguard is “Maintain review cadence and capture lessons for future iterations”.

Question 769

A telecom service team treats continual improvement as a separate annual transformation program with no relevance to daily work. Which follow-up control best sustains the improvement?

  1. Make improvements visible in operating reviews.
  2. Maintain clear request and incident categories.
  3. Reassess end-to-end outcomes after each change.
  4. Measure performance across the full value stream.

Explanation

Correct Answer

A:

This review is relevant over time because improvement is a recurring organizational capability, not only a yearly event. It keeps the team alert to the same failure mode after the initial change.

Incorrect Answers

B:

“Maintain clear request and incident categories” acts on a neighboring technical dependency: This is a practical follow-up for the risk that restoration of degraded service and fulfilment of a predefined request are different kinds of work. It does not resolve the stated condition, whose causal mechanism is: Improvement is a recurring organizational capability, not only a yearly event. The required action is “Make improvements visible in operating reviews”.

C:

This option would change the part of the system described by: The continuing control addresses the recurring risk that the apparent technology problem may involve people, roles or handoffs. The reported behavior instead arises because improvement is a recurring organizational capability, not only a yearly event. The direct remediation is “Make improvements visible in operating reviews”.

D:

This is a practical follow-up for the risk that local optimization can leave the larger service outcome unchanged. That explains why “Measure performance across the full value stream” is useful for its own dependency, but the present failure follows a different constraint: Improvement is a recurring organizational capability, not only a yearly event. The targeted correction is “Make improvements visible in operating reviews”.

Question 770

A hospital sets an aggressive automation goal but cannot explain why that goal supports patient outcomes. Which long-term measure is most useful in this situation?

  1. Review practice boundaries during operating-model changes.
  2. Maintain diagnostic signals proportional to service risks.
  3. Maintain integrated practice guidance across related work.
  4. Review value impact before adding technology requirements.

Explanation

Correct Answer

D:

The safeguard sustains value by monitoring the concern that an improvement can increase activity while failing the service's intended purpose.

Incorrect Answers

A:

The alternate safeguard protects a separate dependency: The continuing control addresses the recurring risk that ITIL management practices support a broad value system rather than a single technical discipline. For this failure the continuing exposure is: The safeguard sustains value by monitoring the concern that an improvement can increase activity while failing the service's intended purpose. Maintain “Review value impact before adding technology requirements” instead.

B:

That review tracks a separate failure mechanism: The safeguard sustains value by monitoring the concern that basic uptime measurements alone may not reveal the causes of performance anomalies. The question requires sustained control over: The safeguard sustains value by monitoring the concern that an improvement can increase activity while failing the service's intended purpose. The corresponding safeguard is “Review value impact before adding technology requirements”.

C:

This safeguard maintains a different technical control: The continuing control addresses the recurring risk that isolated procedures do not automatically form a coherent management capability. The recurring risk here is governed by: The safeguard sustains value by monitoring the concern that an improvement can increase activity while failing the service's intended purpose. The relevant review is “Review value impact before adding technology requirements”.