McAfee Secure

Exam Code: ITILFND V5

Exam Name: ITIL Foundation (Version 5)

Certification Provider: ITIL

Corresponding Certification: ITIL Foundation (Version 5)

ITIL ITILFND V5 Questions & Answers

Study with Up-To-Date REAL Exam Questions and Answers from the ACTUAL Test

78 Questions & Answers with Testing Engine

"ITIL Foundation (Version 5) Exam", also known as ITILFND V5 exam, is a ITIL certification exam.

Pass your tests with the always up-to-date ITILFND V5 Exam Engine. Your ITILFND V5 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

ITIL ITILFND V5 Practice Test 80

Question 790

A nonprofit publishes a complete map of its donation journey but does not assign owners to improvement actions. Which long-term measure is most useful in this situation?

  1. Track cross-team queue times along the complete flow.
  2. Maintain shared flow measures across supplier boundaries.
  3. Link map observations to an active improvement backlog.
  4. Track flow efficiency and rework when changing capacity limits.

Explanation

Correct Answer

C:

The safeguard sustains value by monitoring the concern that mapping identifies improvement opportunities; value stream management acts on them.

Incorrect Answers

A:

The alternate safeguard protects a separate dependency: A bottleneck outside scheduling can dominate the consumer's total wait time. For this failure the continuing exposure is: The safeguard sustains value by monitoring the concern that mapping identifies improvement opportunities; value stream management acts on them. Maintain “Link map observations to an active improvement backlog” instead.

B:

That review tracks a separate failure mechanism: The safeguard sustains value by monitoring the concern that the end-to-end service flow crosses organizational boundaries. The question requires sustained control over: The safeguard sustains value by monitoring the concern that mapping identifies improvement opportunities; value stream management acts on them. The corresponding safeguard is “Link map observations to an active improvement backlog”.

D:

“Track flow efficiency and rework when changing capacity limits” is a sensible check for: Excess parallelism and dependencies can increase rework and lead time. It is not the prevention measure for the current dependency: The safeguard sustains value by monitoring the concern that mapping identifies improvement opportunities; value stream management acts on them. The closer guardrail is “Link map observations to an active improvement backlog”.

Question 791

A digital service team calls an AI-generated support summary a final approved incident diagnosis without review. Which follow-up control best sustains the improvement?

  1. Retain human review, data protection and quality controls for AI-assisted incident work.
  2. Track AI capability gaps, drift and governance maturity over time.
  3. Review AI usefulness and risk by lifecycle activity.
  4. Monitor model performance and escalation patterns throughout service use.

Explanation

Correct Answer

A:

This is a practical follow-up for the risk that generated text may be plausible but can be incorrect or omit important evidence.

Incorrect Answers

B:

Technical availability of AI does not prove organizational readiness to govern and use it safely. That explains why “Track AI capability gaps, drift and governance maturity over time” is useful for its own dependency, but the present failure follows a different constraint: This is a practical follow-up for the risk that generated text may be plausible but can be incorrect or omit important evidence. The targeted correction is “Retain human review, data protection and quality controls for AI-assisted incident work”.

C:

The proposed action focuses on a control governed by: The safeguard sustains value by monitoring the concern that AI can augment several lifecycle activities but needs context-specific value and risk assessment. In this question the binding condition is: This is a practical follow-up for the risk that generated text may be plausible but can be incorrect or omit important evidence. Applying “Retain human review, data protection and quality controls for AI-assisted incident work” addresses that specific cause instead.

D:

“Monitor model performance and escalation patterns throughout service use” acts on a neighboring technical dependency: This is a practical follow-up for the risk that AI inference may contain bias or context loss and should not displace accountable service decisions blindly. It does not resolve the stated condition, whose causal mechanism is: This is a practical follow-up for the risk that generated text may be plausible but can be incorrect or omit important evidence. The required action is “Retain human review, data protection and quality controls for AI-assisted incident work”.

Question 792

A utility company plans to let an agentic system change live access rights without authorization limits or rollback. Which long-term measure is most useful in this situation?

  1. Retain human review, data protection and quality controls for AI-assisted incident work.
  2. Review AI usefulness and risk by lifecycle activity.
  3. Monitor model performance and escalation patterns throughout service use.
  4. Audit agent actions and review guardrails as capabilities evolve.

Explanation

Correct Answer

D:

The continuing control addresses the recurring risk that agentic AI can take sequences of actions, so unmanaged autonomy raises operational risk.

Incorrect Answers

A:

This safeguard maintains a different technical control: This is a practical follow-up for the risk that generated text may be plausible but can be incorrect or omit important evidence. The recurring risk here is governed by: The continuing control addresses the recurring risk that agentic AI can take sequences of actions, so unmanaged autonomy raises operational risk. The relevant review is “Audit agent actions and review guardrails as capabilities evolve”.

B:

“Review AI usefulness and risk by lifecycle activity” is a sensible check for: The safeguard sustains value by monitoring the concern that AI can augment several lifecycle activities but needs context-specific value and risk assessment. It is not the prevention measure for the current dependency: The continuing control addresses the recurring risk that agentic AI can take sequences of actions, so unmanaged autonomy raises operational risk. The closer guardrail is “Audit agent actions and review guardrails as capabilities evolve”.

C:

The alternate safeguard protects a separate dependency: This is a practical follow-up for the risk that AI inference may contain bias or context loss and should not displace accountable service decisions blindly. For this failure the continuing exposure is: The continuing control addresses the recurring risk that agentic AI can take sequences of actions, so unmanaged autonomy raises operational risk. Maintain “Audit agent actions and review guardrails as capabilities evolve” instead.

Question 793

A bank deploys AI-based ticket classification without assessing data quality, model fitness or staff readiness. Which follow-up control best sustains the improvement?

  1. Retain human review, data protection and quality controls for AI-assisted incident work.
  2. Audit agent actions and review guardrails as capabilities evolve.
  3. Monitor model performance and escalation patterns throughout service use.
  4. Track AI capability gaps, drift and governance maturity over time.

Explanation

Correct Answer

D:

This review is relevant over time because technical availability of AI does not prove organizational readiness to govern and use it safely. It keeps the team alert to the same failure mode after the initial change.

Incorrect Answers

A:

The proposed action focuses on a control governed by: This is a practical follow-up for the risk that generated text may be plausible but can be incorrect or omit important evidence. In this question the binding condition is: Technical availability of AI does not prove organizational readiness to govern and use it safely. Applying “Track AI capability gaps, drift and governance maturity over time” addresses that specific cause instead.

B:

“Audit agent actions and review guardrails as capabilities evolve” acts on a neighboring technical dependency: The continuing control addresses the recurring risk that agentic AI can take sequences of actions, so unmanaged autonomy raises operational risk. It does not resolve the stated condition, whose causal mechanism is: Technical availability of AI does not prove organizational readiness to govern and use it safely. The required action is “Track AI capability gaps, drift and governance maturity over time”.

C:

This option would change the part of the system described by: This is a practical follow-up for the risk that AI inference may contain bias or context loss and should not displace accountable service decisions blindly. The reported behavior instead arises because technical availability of AI does not prove organizational readiness to govern and use it safely. The direct remediation is “Track AI capability gaps, drift and governance maturity over time”.

Question 794

A retailer integrates a summarization assistant into customer support but cannot explain which parts of the service lifecycle benefit. Which long-term measure is most useful in this situation?

  1. Retain human review, data protection and quality controls for AI-assisted incident work.
  2. Audit agent actions and review guardrails as capabilities evolve.
  3. Review AI usefulness and risk by lifecycle activity.
  4. Track AI capability gaps, drift and governance maturity over time.

Explanation

Correct Answer

C:

The safeguard sustains value by monitoring the concern that AI can augment several lifecycle activities but needs context-specific value and risk assessment.

Incorrect Answers

A:

The alternate safeguard protects a separate dependency: This is a practical follow-up for the risk that generated text may be plausible but can be incorrect or omit important evidence. For this failure the continuing exposure is: The safeguard sustains value by monitoring the concern that AI can augment several lifecycle activities but needs context-specific value and risk assessment. Maintain “Review AI usefulness and risk by lifecycle activity” instead.

B:

That review tracks a separate failure mechanism: The continuing control addresses the recurring risk that agentic AI can take sequences of actions, so unmanaged autonomy raises operational risk. The question requires sustained control over: The safeguard sustains value by monitoring the concern that AI can augment several lifecycle activities but needs context-specific value and risk assessment. The corresponding safeguard is “Review AI usefulness and risk by lifecycle activity”.

D:

“Track AI capability gaps, drift and governance maturity over time” is a sensible check for: Technical availability of AI does not prove organizational readiness to govern and use it safely. It is not the prevention measure for the current dependency: The safeguard sustains value by monitoring the concern that AI can augment several lifecycle activities but needs context-specific value and risk assessment. The closer guardrail is “Review AI usefulness and risk by lifecycle activity”.

Question 795

An insurance company automates claim-sentiment analysis and assumes a score can replace all customer communication judgment. Which follow-up control best sustains the improvement?

  1. Audit agent actions and review guardrails as capabilities evolve.
  2. Track AI capability gaps, drift and governance maturity over time.
  3. Monitor model performance and escalation patterns throughout service use.
  4. Review AI usefulness and risk by lifecycle activity.

Explanation

Correct Answer

C:

This is a practical follow-up for the risk that AI inference may contain bias or context loss and should not displace accountable service decisions blindly.

Incorrect Answers

A:

This option would change the part of the system described by: The continuing control addresses the recurring risk that agentic AI can take sequences of actions, so unmanaged autonomy raises operational risk. The reported behavior instead arises because this is a practical follow-up for the risk that AI inference may contain bias or context loss and should not displace accountable service decisions blindly. The direct remediation is “Monitor model performance and escalation patterns throughout service use”.

B:

Technical availability of AI does not prove organizational readiness to govern and use it safely. That explains why “Track AI capability gaps, drift and governance maturity over time” is useful for its own dependency, but the present failure follows a different constraint: This is a practical follow-up for the risk that AI inference may contain bias or context loss and should not displace accountable service decisions blindly. The targeted correction is “Monitor model performance and escalation patterns throughout service use”.

D:

“Review AI usefulness and risk by lifecycle activity” acts on a neighboring technical dependency: The safeguard sustains value by monitoring the concern that AI can augment several lifecycle activities but needs context-specific value and risk assessment. It does not resolve the stated condition, whose causal mechanism is: This is a practical follow-up for the risk that AI inference may contain bias or context loss and should not displace accountable service decisions blindly. The required action is “Monitor model performance and escalation patterns throughout service use”.

Question 796

A software team treats DevOps delivery automation as a replacement for ITIL service management. Which long-term measure is most useful in this situation?

  1. Coordinate agile feedback and service assurance activities.
  2. Assign ongoing service responsibilities before project completion.
  3. Review delivery and operational measures together across teams.
  4. Use common service outcomes to coordinate improvement across methods.

Explanation

Correct Answer

C:

The continuing control addresses the recurring risk that DevOps emphasizes collaborative delivery while ITIL provides complementary value and service management guidance.

Incorrect Answers

A:

This safeguard maintains a different technical control: The safeguard sustains value by monitoring the concern that ITIL is adaptable and does not prescribe one software development method. The recurring risk here is governed by: The continuing control addresses the recurring risk that DevOps emphasizes collaborative delivery while ITIL provides complementary value and service management guidance. The relevant review is “Review delivery and operational measures together across teams”.

B:

“Assign ongoing service responsibilities before project completion” is a sensible check for: This is a practical follow-up for the risk that project deliverables are not equivalent to continuous operation and improvement. It is not the prevention measure for the current dependency: The continuing control addresses the recurring risk that DevOps emphasizes collaborative delivery while ITIL provides complementary value and service management guidance. The closer guardrail is “Review delivery and operational measures together across teams”.

D:

That review tracks a separate failure mechanism: The continuing control addresses the recurring risk that method labels do not justify organizational silos when the service needs end-to-end cooperation. The question requires sustained control over: The continuing control addresses the recurring risk that DevOps emphasizes collaborative delivery while ITIL provides complementary value and service management guidance. The corresponding safeguard is “Review delivery and operational measures together across teams”.

Question 797

A government platform project has a defined temporary implementation scope but no plan for how the resulting service will operate after project closure. Which follow-up control best sustains the improvement?

  1. Require lifecycle handover and benefit review in project governance.
  2. Review delivery and operational measures together across teams.
  3. Assign ongoing service responsibilities before project completion.
  4. Use common service outcomes to coordinate improvement across methods.

Explanation

Correct Answer

A:

This review is relevant over time because temporary project governance and sustained product/service management have different but complementary purposes. It keeps the team alert to the same failure mode after the initial change.

Incorrect Answers

B:

“Review delivery and operational measures together across teams” acts on a neighboring technical dependency: The continuing control addresses the recurring risk that DevOps emphasizes collaborative delivery while ITIL provides complementary value and service management guidance. It does not resolve the stated condition, whose causal mechanism is: Temporary project governance and sustained product/service management have different but complementary purposes. The required action is “Require lifecycle handover and benefit review in project governance”.

C:

This option would change the part of the system described by: This is a practical follow-up for the risk that project deliverables are not equivalent to continuous operation and improvement. The reported behavior instead arises because temporary project governance and sustained product/service management have different but complementary purposes. The direct remediation is “Require lifecycle handover and benefit review in project governance”.

D:

The continuing control addresses the recurring risk that method labels do not justify organizational silos when the service needs end-to-end cooperation. That explains why “Use common service outcomes to coordinate improvement across methods” is useful for its own dependency, but the present failure follows a different constraint: Temporary project governance and sustained product/service management have different but complementary purposes. The targeted correction is “Require lifecycle handover and benefit review in project governance”.

Question 798

A public hospital claims ITIL requires abandoning agile development and returning to waterfall delivery. Which long-term measure is most useful in this situation?

  1. Review delivery and operational measures together across teams.
  2. Require lifecycle handover and benefit review in project governance.
  3. Coordinate agile feedback and service assurance activities.
  4. Use common service outcomes to coordinate improvement across methods.

Explanation

Correct Answer

C:

The safeguard sustains value by monitoring the concern that ITIL is adaptable and does not prescribe one software development method.

Incorrect Answers

A:

The alternate safeguard protects a separate dependency: The continuing control addresses the recurring risk that DevOps emphasizes collaborative delivery while ITIL provides complementary value and service management guidance. For this failure the continuing exposure is: The safeguard sustains value by monitoring the concern that ITIL is adaptable and does not prescribe one software development method. Maintain “Coordinate agile feedback and service assurance activities” instead.

B:

That review tracks a separate failure mechanism: Temporary project governance and sustained product/service management have different but complementary purposes. The question requires sustained control over: The safeguard sustains value by monitoring the concern that ITIL is adaptable and does not prescribe one software development method. The corresponding safeguard is “Coordinate agile feedback and service assurance activities”.

D:

“Use common service outcomes to coordinate improvement across methods” is a sensible check for: The continuing control addresses the recurring risk that method labels do not justify organizational silos when the service needs end-to-end cooperation. It is not the prevention measure for the current dependency: The safeguard sustains value by monitoring the concern that ITIL is adaptable and does not prescribe one software development method. The closer guardrail is “Coordinate agile feedback and service assurance activities”.

Question 799

A marketing agency uses a formal project plan to launch a customer analytics product but assumes the project plan itself guarantees service quality afterward. Which follow-up control best sustains the improvement?

  1. Review delivery and operational measures together across teams.
  2. Require lifecycle handover and benefit review in project governance.
  3. Assign ongoing service responsibilities before project completion.
  4. Coordinate agile feedback and service assurance activities.

Explanation

Correct Answer

C:

This is a practical follow-up for the risk that project deliverables are not equivalent to continuous operation and improvement.

Incorrect Answers

A:

This option would change the part of the system described by: The continuing control addresses the recurring risk that DevOps emphasizes collaborative delivery while ITIL provides complementary value and service management guidance. The reported behavior instead arises because this is a practical follow-up for the risk that project deliverables are not equivalent to continuous operation and improvement. The direct remediation is “Assign ongoing service responsibilities before project completion”.

B:

Temporary project governance and sustained product/service management have different but complementary purposes. That explains why “Require lifecycle handover and benefit review in project governance” is useful for its own dependency, but the present failure follows a different constraint: This is a practical follow-up for the risk that project deliverables are not equivalent to continuous operation and improvement. The targeted correction is “Assign ongoing service responsibilities before project completion”.

D:

“Coordinate agile feedback and service assurance activities” acts on a neighboring technical dependency: The safeguard sustains value by monitoring the concern that ITIL is adaptable and does not prescribe one software development method. It does not resolve the stated condition, whose causal mechanism is: This is a practical follow-up for the risk that project deliverables are not equivalent to continuous operation and improvement. The required action is “Assign ongoing service responsibilities before project completion”.

Question 800

A cloud provider divides engineers into DevOps and ITIL groups that refuse to exchange reliability or change data. Which long-term measure is most useful in this situation?

  1. Require lifecycle handover and benefit review in project governance.
  2. Coordinate agile feedback and service assurance activities.
  3. Assign ongoing service responsibilities before project completion.
  4. Use common service outcomes to coordinate improvement across methods.

Explanation

Correct Answer

D:

The continuing control addresses the recurring risk that method labels do not justify organizational silos when the service needs end-to-end cooperation.

Incorrect Answers

A:

This safeguard maintains a different technical control: Temporary project governance and sustained product/service management have different but complementary purposes. The recurring risk here is governed by: The continuing control addresses the recurring risk that method labels do not justify organizational silos when the service needs end-to-end cooperation. The relevant review is “Use common service outcomes to coordinate improvement across methods”.

B:

“Coordinate agile feedback and service assurance activities” is a sensible check for: The safeguard sustains value by monitoring the concern that ITIL is adaptable and does not prescribe one software development method. It is not the prevention measure for the current dependency: The continuing control addresses the recurring risk that method labels do not justify organizational silos when the service needs end-to-end cooperation. The closer guardrail is “Use common service outcomes to coordinate improvement across methods”.

C:

The alternate safeguard protects a separate dependency: This is a practical follow-up for the risk that project deliverables are not equivalent to continuous operation and improvement. For this failure the continuing exposure is: The continuing control addresses the recurring risk that method labels do not justify organizational silos when the service needs end-to-end cooperation. Maintain “Use common service outcomes to coordinate improvement across methods” instead.

ITIL Foundation (Version 5) (ITILFND V5) Practice Tests