Question 400
At the Birchhaven property systems infrastructure team, a NAS LIF migrates during a port failure but clients cannot reach its new physical path. What should be monitored or reviewed during future changes?
Explanation
Correct Answer
After implementation, the team should revalidate every failover path after adding switch ports as the appropriate recurring safeguard against the identified issue. This result addresses the stated challenge at the Birchhaven property systems infrastructure team.
Incorrect Answers
“Audit gateway and route entries after network expansion” checks a different ongoing risk rather than the reported failure: at the Birchhaven property systems infrastructure team, a NAS LIF migrates during a port failure but clients cannot reach its new physical path. The directly matched preventive control is “Revalidate every failover path after adding switch ports”.
The option would have the team reconcile allocated storage IPs when network address plans change. For this situation, the preventive control should instead be to revalidate every failover path after adding switch ports. For the Birchhaven property systems infrastructure team, the direct corrective action is to check the destination port broadcast domain VLAN and failover policy eligibility.
“Review port-channel settings following network equipment updates” checks a different ongoing risk rather than the reported failure: at the Birchhaven property systems infrastructure team, a NAS LIF migrates during a port failure but clients cannot reach its new physical path. The directly matched preventive control is “Revalidate every failover path after adding switch ports”.