Question 460
At the Greystone manufacturing storage support department, an iSCSI workload places every target IP on one switch and assumes the HA partner alone guarantees host continuity. What should be monitored or reviewed during future changes?
Explanation
Correct Answer
The team should test separate target-network failure domains after SAN changes. That recurring practice targets the same weakness, namely that a reachable storage controller does not help if the host has lost its only SAN fabric path. This result addresses the stated challenge at the Greystone manufacturing storage support department.
Incorrect Answers
Review portset members whenever SAN LIFs or hosts are added is not the primary recurring safeguard for this problem. The team should test separate target-network failure domains after SAN changes. For the Greystone manufacturing storage support department, the direct corrective action is to deploy redundant iSCSI target LIF network paths consistent with MPIO and supported switch layout.
“Monitor SAN endpoint subnet and route changes” checks a different ongoing risk rather than the reported failure: at the Greystone manufacturing storage support department, an iSCSI workload places every target IP on one switch and assumes the HA partner alone guarantees host continuity. The relevant mechanism is a reachable storage controller does not help if the host has lost its only SAN fabric path; a passing acceptance check would show that a controlled switch failure leaves at least one valid host path to the LUN. The directly matched preventive control is “Test separate target-network failure domains after SAN changes”.
“Audit junction and volume mount status after provisioning changes” checks a different ongoing risk rather than the reported failure: at the Greystone manufacturing storage support department, an iSCSI workload places every target IP on one switch and assumes the HA partner alone guarantees host continuity. The relevant mechanism is a reachable storage controller does not help if the host has lost its only SAN fabric path; a passing acceptance check would show that a controlled switch failure leaves at least one valid host path to the LUN. The directly matched preventive control is “Test separate target-network failure domains after SAN changes”.