McAfee Secure

Exam Code: PRINCE2 7 Practitioner

Exam Name: PRINCE2 7 Practitioner

Certification Provider: PRINCE2

PRINCE2 PRINCE2 7 Practitioner Questions & Answers

Study with Up-To-Date REAL Exam Questions and Answers from the ACTUAL Test

93 Questions & Answers with Testing Engine

"PRINCE2 7 Practitioner Exam", also known as PRINCE2 7 Practitioner exam, is a PRINCE2 certification exam.

Pass your tests with the always up-to-date PRINCE2 7 Practitioner Exam Engine. Your PRINCE2 7 Practitioner training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

PRINCE2 PRINCE2 7 Practitioner Practice Test 73

Question 720

A tunnel monitoring supplier provides only a completion invoice and no ongoing product status, despite agreed weekly checkpoints. Which ongoing control would best prevent this failure from recurring?

  1. Keep reporting consistent with package tolerances and communicate forecast breaches before the scheduled end date.
  2. Use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.
  3. Maintain a separate controlled record of the original plan and formal replacement decision so exception governance remains auditable.
  4. Keep acceptance responsibilities and required evidence visible in delivery plans so closure is not obstructed by missing checks.

Explanation

Correct Answer

A:

Keep reporting consistent with package tolerances and communicate forecast breaches before the scheduled end date. It is appropriate because the project manager needs team-level forecasts to control the stage, while the team manager remains responsible for executing the package. The recurring failure risk is illustrated by: A tunnel monitoring supplier provides only a completion invoice and no ongoing product status, despite agreed weekly checkpoints.

Incorrect Answers

B:

This repeating check is mainly concerned with formally hand over completed products, not with the recurring weakness described here: A tunnel monitoring supplier provides only a completion invoice and no ongoing product status, despite agreed weekly checkpoints. The useful ongoing safeguard in this situation is to keep reporting consistent with package tolerances and communicate forecast breaches before the scheduled end date.

C:

This repeating check is mainly concerned with create a defensible exception plan, not with the recurring weakness described here: A tunnel monitoring supplier provides only a completion invoice and no ongoing product status, despite agreed weekly checkpoints. The useful ongoing safeguard in this situation is to keep reporting consistent with package tolerances and communicate forecast breaches before the scheduled end date.

D:

This repeating check is mainly concerned with confirm acceptance of final products, not with the recurring weakness described here: A tunnel monitoring supplier provides only a completion invoice and no ongoing product status, despite agreed weekly checkpoints. The useful ongoing safeguard in this situation is to keep reporting consistent with package tolerances and communicate forecast breaches before the scheduled end date.

Question 721

A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred. What should the responsible project role do next to restore effective control?

  1. Obtain board direction on the exception, including whether to revise, suspend or stop work and whether an exception plan is required.
  2. Have the team manager review and formally accept the work package with products, dependencies, quality controls and reporting obligations understood.
  3. Notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement.
  4. Verify that the project's required products meet agreed acceptance criteria and obtain formal acceptance from the appropriate authority.

Explanation

Correct Answer

C:

This response is justified because formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance. Notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The response can be checked against delivery evidence: the project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package.

Incorrect Answers

A:

Give direction on major exceptions concerns a different project control. Here, notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The reason is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

B:

Accept a defined work package concerns a different project control. Here, notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The reason is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

D:

Confirm acceptance of final products concerns a different project control. Here, notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The reason is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

Question 722

A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred. Why is the proposed way of working inappropriate in this situation?

  1. Stage control requires active issue and risk management; informal observations must become governed decisions when they affect products or constraints.
  2. A closing process should explain delivery performance and learning, not simply assert that all scheduled tasks were completed.
  3. The directing process ends with an accountable closure decision; technical task completion alone is not board assurance that obligations are resolved.
  4. Formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

Explanation

Correct Answer

D:

The important PRINCE2 distinction is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance. That reasoning makes the targeted action appropriate: notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The described project conditions show why the distinction matters: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred.

Incorrect Answers

A:

Manage issues and risks in the stage describes a different management issue. The relevant cause instead is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

B:

Evaluate performance and lessons describes a different management issue. Here the observed concern is: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred. The relevant cause instead is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

C:

Authorize a controlled closure describes a different management issue. The relevant cause instead is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

Question 723

A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred. What project record best demonstrates effective handling of the reported issue?

  1. The project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package.
  2. The board receives a decision-ready forecast, key completed products and any explicit exception report rather than unfiltered operational chatter.
  3. An exception report informs board options and the decision is recorded with new direction and any required exception-planning authority.
  4. The board explicitly authorizes the project and initial delivery stage with agreed constraints after reviewing the PID.

Explanation

Correct Answer

A:

The project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package. The controlling requirement is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance. The evidence directly addresses the situation: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred.

Incorrect Answers

B:

Evidence about report stage status and exceptions would not show that this problem was resolved. The present project needs to prove that the project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package. The specific condition to test arises from: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred.

C:

Evidence about give direction on major exceptions would not show that this problem was resolved. The present project needs to prove that the project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package. The specific condition to test arises from: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred.

D:

Evidence about request authorization after baseline readiness would not show that this problem was resolved. The present project needs to prove that the project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package. The specific condition to test arises from: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred.

Question 724

A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred. Which ongoing control would best prevent this failure from recurring?

  1. Agree transition responsibilities before closure and confirm that unresolved actions remain tracked by the receiving organization.
  2. Update approaches as the delivery context changes, but retain consistent controls and documented authorization.
  3. Preserve separate startup, initiation and delivery authorization records to prevent premature spending beyond delegation.
  4. Use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.

Explanation

Correct Answer

D:

Use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria. It is appropriate because formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance. The recurring failure risk is illustrated by: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred.

Incorrect Answers

A:

This repeating check is mainly concerned with arrange ongoing support and follow-on actions, not with the recurring weakness described here: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred. The useful ongoing safeguard in this situation is to use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.

B:

This repeating check is mainly concerned with establish management approaches before execution, not with the recurring weakness described here: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred. The useful ongoing safeguard in this situation is to use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.

C:

This repeating check is mainly concerned with request authorization after baseline readiness, not with the recurring weakness described here: A housing energy audit team claims its work package is done because the last site visit ended, but final evidence records have not been transferred. The useful ongoing safeguard in this situation is to use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.

Question 725

An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed. Which action is the most proportionate response to the stated problem?

  1. Notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement.
  2. Appoint an accountable executive and project manager early enough to direct the startup assessment and preparation for initiation.
  3. Authorize and agree work packages with clear deliverables, quality criteria, tolerances, dependencies and reporting arrangements before execution.
  4. Prepare handover and follow-on action recommendations with clear owners for operations, outstanding work, support and benefits tracking.

Explanation

Correct Answer

A:

The situation calls for this intervention because formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance. Notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The response can be checked against delivery evidence: the project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package.

Incorrect Answers

B:

Appoint accountable leadership before initiation concerns a different project control. Here, notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The reason is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

C:

Authorize work packages concerns a different project control. Here, notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The reason is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

D:

Arrange ongoing support and follow-on actions concerns a different project control. Here, notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The reason is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

Question 726

An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed. Which diagnosis most accurately explains the gap in control?

  1. A closing process should explain delivery performance and learning, not simply assert that all scheduled tasks were completed.
  2. An exception plan replaces the relevant approved plan only after appropriate authority reviews the forecast breach and proposed course of action.
  3. Starting up a project checks whether there is a worthwhile, viable basis for initiation before significant delivery resources are committed.
  4. Formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

Explanation

Correct Answer

D:

The important PRINCE2 distinction is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance. That reasoning makes the targeted action appropriate: notify the project manager of completed work and hand over products with required quality and acceptance evidence under the package agreement. The described project conditions show why the distinction matters: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed.

Incorrect Answers

A:

Evaluate performance and lessons describes a different management issue. The relevant cause instead is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

B:

Create a defensible exception plan describes a different management issue. The relevant cause instead is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

C:

Appoint accountable leadership before initiation describes a different management issue. The relevant cause instead is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance.

Question 727

An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed. Which evidence would most directly demonstrate that the concern has been resolved?

  1. The project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package.
  2. The board authorizes an initiation stage with products, resources, tolerances and named responsibility for preparing the PID.
  3. The board explicitly authorizes the project and initial delivery stage with agreed constraints after reviewing the PID.
  4. The team manager accepts the authorized work package and the project manager can trace its products and reporting to stage commitments.

Explanation

Correct Answer

A:

The project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package. The controlling requirement is that formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance. The evidence directly addresses the situation: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed.

Incorrect Answers

B:

Evidence about plan the initiation stage would not show that this problem was resolved. The present project needs to prove that the project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package. The specific condition to test arises from: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed.

C:

Evidence about request authorization after baseline readiness would not show that this problem was resolved. The present project needs to prove that the project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package. The specific condition to test arises from: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed.

D:

Evidence about authorize work packages would not show that this problem was resolved. The present project needs to prove that the project manager receives the identified product versions, quality results and completion notification and confirms the handover against the package. The specific condition to test arises from: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed.

Question 728

An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed. What repeating management check should be included in the project controls?

  1. Revalidate forecasts and justification before board authorization and again at every material change or stage boundary.
  2. Use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.
  3. Use startup checks to confirm decision authority and management ownership before authorizing detailed project initiation.
  4. Monitor the effects of corrective action and escalate promptly if updated forecasts still show an exception.

Explanation

Correct Answer

B:

Use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria. It is appropriate because formal delivery closes the team-to-project-manager interface only when agreed outputs and records are available for acceptance. The recurring failure risk is illustrated by: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed.

Incorrect Answers

A:

This repeating check is mainly concerned with refine business case and project plan, not with the recurring weakness described here: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed. The useful ongoing safeguard in this situation is to use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.

C:

This repeating check is mainly concerned with appoint accountable leadership before initiation, not with the recurring weakness described here: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed. The useful ongoing safeguard in this situation is to use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.

D:

This repeating check is mainly concerned with take corrective action within authority, not with the recurring weakness described here: An airport mobile app subcontractor submits binaries without sign-off records or confirmation of which acceptance tests passed. The useful ongoing safeguard in this situation is to use a repeatable completed-work-package checklist, retaining traceability from delivered products to approved criteria.

Question 729

A health licensing pilot reaches its planned end date, but the team cannot say which products were accepted or what issues remain for the next stage. Which action is the most proportionate response to the stated problem?

  1. Prepare an end-stage report based on actual products, quality outcomes, stage performance, unresolved risks and lessons.
  2. Submit the end-stage evidence and next-stage proposal to the project board for an explicit decision before starting the new stage.
  3. Update the business case and benefits forecasts using the completed stage evidence before recommending continuation.
  4. Prepare a realistic next-stage plan with products, estimates, constraints, risks and proposed tolerances for board consideration.

Explanation

Correct Answer

A:

This response is justified because stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery. Prepare an end-stage report based on actual products, quality outcomes, stage performance, unresolved risks and lessons. The response can be checked against delivery evidence: the board can see accepted products, deviations, performance against tolerances and issues carried forward before considering continuation.

Incorrect Answers

B:

Request explicit next-stage authorization concerns a different project control. Here, prepare an end-stage report based on actual products, quality outcomes, stage performance, unresolved risks and lessons. The reason is that stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery.

C:

Refresh the business case concerns a different project control. Here, prepare an end-stage report based on actual products, quality outcomes, stage performance, unresolved risks and lessons. The reason is that stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery.

D:

Plan the next authorized stage concerns a different project control. Here, prepare an end-stage report based on actual products, quality outcomes, stage performance, unresolved risks and lessons. The reason is that stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery.

Question 730

A health licensing pilot reaches its planned end date, but the team cannot say which products were accepted or what issues remain for the next stage. Which diagnosis most accurately explains the gap in control?

  1. Each major funding decision should consider whether the project remains viable, desirable and achievable in light of current data.
  2. The project board authorizes a bounded near-term stage based on current evidence, not a vague promise derived from an obsolete overall plan.
  3. An exception plan replaces the relevant approved plan only after appropriate authority reviews the forecast breach and proposed course of action.
  4. Stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery.

Explanation

Correct Answer

D:

The important PRINCE2 distinction is that stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery. That reasoning makes the targeted action appropriate: prepare an end-stage report based on actual products, quality outcomes, stage performance, unresolved risks and lessons. The described project conditions show why the distinction matters: A health licensing pilot reaches its planned end date, but the team cannot say which products were accepted or what issues remain for the next stage.

Incorrect Answers

A:

Refresh the business case describes a different management issue. The relevant cause instead is that stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery.

B:

Plan the next authorized stage describes a different management issue. The relevant cause instead is that stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery.

C:

Create a defensible exception plan describes a different management issue. The relevant cause instead is that stage boundaries supply decision evidence for further commitment; mere expenditure or elapsed time does not demonstrate satisfactory delivery.