Question 300
At the Westhaven managed-network provider, several new IP cameras power cycle because available switch PoE watts are exhausted. Which ongoing control best prevents this issue from recurring?
Explanation
Correct Answer
After implementation, the team should monitor PoE headroom as devices are added as the appropriate recurring safeguard against the identified issue.
Incorrect Answers
That routine supports port error-disable recovery, but the relevant ongoing risk requires the team to monitor PoE headroom as devices are added. For the Westhaven managed-network provider, the direct corrective action is to compare per-port class demand and total available PoE capacity and adjust hardware or allocations.
Track path health and ECMP consistency during link upgrades. That safeguard would help prevent recurrence of: Equal-cost multipath may use a flow hash rather than distributing consecutive packets across every path. The risk being reviewed here is instead: An available Ethernet port does not mean the power supply has spare PoE capacity. The matching ongoing control is: Monitor PoE headroom as devices are added.
Include switch management reachability in each HA maintenance test. That safeguard would help prevent recurrence of: HA failover can strand managed switches when the new active FortiGate has no valid management path. The risk being reviewed here is instead: An available Ethernet port does not mean the power supply has spare PoE capacity. The matching ongoing control is: Monitor PoE headroom as devices are added.