Question 440
At the Highbridge campus infrastructure group, an island FortiSwitch aggregates ports toward two different intermediary routers while using internal-interface Layer 3 management. How should the organization sustain the improvement?
Explanation
Correct Answer
The needed prevention is to review L3 island route and LAG support during redundancy changes. It directly sustains the original change to rework the LAG to the supported single intermediary or supported alternative topology.
Incorrect Answers
The suggested preventive check is: Include managed switching in FortiGate HA acceptance tests. Its technical scope concerns: Failing over the firewall does not help if the promoted member lacks an operational FortiLink path. This question asks how to sustain control over: The documented Layer 3 FortiLink in-band LAG cannot span separate intermediary routers. The more targeted safeguard is: Review L3 island route and LAG support during redundancy changes.
Audit management addresses and access-source restrictions. That safeguard would help prevent recurrence of: Management-plane routing and access controls are separate from user data forwarding. The risk being reviewed here is instead: The documented Layer 3 FortiLink in-band LAG cannot span separate intermediary routers. The matching ongoing control is: Review L3 island route and LAG support during redundancy changes.
That routine supports fortiswitch port inventory labels, but the relevant ongoing risk requires the team to review L3 island route and LAG support during redundancy changes. For the Highbridge campus infrastructure group, the direct corrective action is to rework the LAG to the supported single intermediary or supported alternative topology.