McAfee Secure

Exam Code: NSE5_FSW_AD-7.6

Exam Name: Fortinet NSE 5 - FortiSwitch 7.6 Administrator

Certification Provider: Fortinet

Corresponding Certification: NSE5

Fortinet NSE5_FSW_AD-7.6 Questions & Answers

Study with Up-To-Date REAL Exam Questions and Answers from the ACTUAL Test

64 Questions & Answers with Testing Engine

"Fortinet NSE 5 - FortiSwitch 7.6 Administrator Exam", also known as NSE5_FSW_AD-7.6 exam, is a Fortinet certification exam.

Pass your tests with the always up-to-date NSE5_FSW_AD-7.6 Exam Engine. Your NSE5_FSW_AD-7.6 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Fortinet NSE5_FSW_AD-7.6 Practice Test 55

Question 540

At the Lindenport managed-network provider, a tenant is moved to a new VDOM but its managed-switch trunk still references interfaces owned by the previous domain. Which ongoing control best prevents this issue from recurring?

  1. Recheck cross-VDOM VLAN settings after firmware upgrades
  2. Retest overlay reachability after underlay changes
  3. Audit VLAN references and port exports after VDOM restructuring
  4. Review L3 island route and LAG support during redundancy changes

Explanation

Correct Answer

C:

After implementation, the team should audit VLAN references and port exports after VDOM restructuring as the appropriate recurring safeguard against the identified issue.

Incorrect Answers

A:

That routine supports vdom native vlan gui limitation, but the relevant ongoing risk requires the team to audit VLAN references and port exports after VDOM restructuring. For the Lindenport managed-network provider, the direct corrective action is to recreate or reassign supported tenant VLAN interfaces and switch-port ownership under a controlled migration.

B:

Retest overlay reachability after underlay changes. That safeguard would help prevent recurrence of: Overlay transport requires explicit compatibility and control reachability beyond a regular copper uplink. The risk being reviewed here is instead: Changing VDOM ownership can leave obsolete VLAN references and inaccessible management objects. The matching ongoing control is: Audit VLAN references and port exports after VDOM restructuring.

D:

Review L3 island route and LAG support during redundancy changes. That safeguard would help prevent recurrence of: The documented Layer 3 FortiLink in-band LAG cannot span separate intermediary routers. The risk being reviewed here is instead: Changing VDOM ownership can leave obsolete VLAN references and inaccessible management objects. The matching ongoing control is: Audit VLAN references and port exports after VDOM restructuring.

Question 541

At the Zincbridge network modernization program, an unknown laptop gains full employee VLAN access through a wired FortiSwitch access port with no authentication. Which implementation choice best addresses the situation?

  1. Apply supported 802.1X port authentication backed by the approved RADIUS identity service
  2. Attach the intended supported switch-controller 802.1X port policy to the exact managed ports
  3. Combine supported MAC learning limits and traffic monitoring at the untrusted access edge
  4. Use supported storm control plus loop prevention to contain the offending edge links

Explanation

Correct Answer

A:

This solution addresses the stated limitation: an open access port cannot verify user or device identity before allowing network access. Implementing it means the team should apply supported 802.1X port authentication backed by the approved RADIUS identity service, then verify that a valid corporate supplicant obtains its approved role and the unknown laptop is denied.

Incorrect Answers

B:

Attach the intended supported switch-controller 802.1X port policy to the exact managed ports addresses a different kind of problem: a correct security profile does not protect interfaces to which it was never assigned. Here the reported weakness is that an open access port cannot verify user or device identity before allowing network access. For the Zincbridge network modernization program, the direct corrective action is to apply supported 802.1X port authentication backed by the approved RADIUS identity service.

C:

The option addresses the separate situation where excessive unique source MAC addresses can force unknown-unicast forwarding and table pressure. For this case, the more appropriate response is to apply supported 802.1X port authentication backed by the approved RADIUS identity service. For the Zincbridge network modernization program, the direct corrective action is to apply supported 802.1X port authentication backed by the approved RADIUS identity service.

D:

The offered alternative is: Use supported storm control plus loop prevention to contain the offending edge links. It addresses this separate failure mode: An Ethernet loop can replicate broadcast traffic repeatedly across the VLAN. In the current case, the observed mechanism is: An open access port cannot verify user or device identity before allowing network access. The keyed action, Apply supported 802.1X port authentication backed by the approved RADIUS identity service., targets that condition more directly.

Question 542

At the Zincbridge network modernization program, an unknown laptop gains full employee VLAN access through a wired FortiSwitch access port with no authentication. What risk should the team identify as the primary issue?

  1. An open access port cannot verify user or device identity before allowing network access
  2. Unauthenticated devices should not inherit corporate routing or service permissions
  3. ACL stages affect different points of the switch packet-processing pipeline
  4. Feature interactions can make a planned access-port source guard unsupported

Explanation

Correct Answer

A:

The situation shows that an open access port cannot verify user or device identity before allowing network access, rather than merely a monitoring or presentation issue. Remediation is to apply supported 802.1X port authentication backed by the approved RADIUS identity service.

Incorrect Answers

B:

Unauthenticated devices should not inherit corporate routing or service permissions. That may occur elsewhere, but the evidence at the Zincbridge network modernization program instead points to the fact that an open access port cannot verify user or device identity before allowing network access.

C:

The offered alternative is: ACL stages affect different points of the switch packet-processing pipeline. It addresses this separate failure mode: ACL stages affect different points of the switch packet-processing pipeline. In the current case, the observed mechanism is: An open access port cannot verify user or device identity before allowing network access. The keyed action, An open access port cannot verify user or device identity before allowing network access., targets that condition more directly.

D:

Feature interactions can make a planned access-port source guard unsupported. That is not the mechanism that accounts for the stated failure at the Zincbridge network modernization program.

Question 543

At the Zincbridge network modernization program, an unknown laptop gains full employee VLAN access through a wired FortiSwitch access port with no authentication. What is the strongest acceptance test for this change?

  1. Two valid user roles enter distinct approved VLANs and remain isolated
  2. A valid corporate supplicant obtains its approved role and the unknown laptop is denied
  3. The same lab flow demonstrates intended stage enforcement with supported commands
  4. A restricted VLAN cannot reach the sensitive service while a permitted VLAN can

Explanation

Correct Answer

B:

The team can confirm the fix by showing that a valid corporate supplicant obtains its approved role and the unknown laptop is denied. This aligns with the corrective design to apply supported 802.1X port authentication backed by the approved RADIUS identity service.

Incorrect Answers

A:

Two valid user roles enter distinct approved VLANs and remain isolated. That result would test a control for this other failure: Successful authentication alone does not apply differentiated authorization when return attributes are not mapped. The question instead requires evidence for: An open access port cannot verify user or device identity before allowing network access. The direct outcome to verify is: A valid corporate supplicant obtains its approved role and the unknown laptop is denied.

C:

The same lab flow demonstrates intended stage enforcement with supported commands. That result would test a control for this other failure: FortiSwitch ACL configuration distinguishes ingress prelookup and egress stages. The question instead requires evidence for: An open access port cannot verify user or device identity before allowing network access. The direct outcome to verify is: A valid corporate supplicant obtains its approved role and the unknown laptop is denied.

D:

The offered observation is: A restricted VLAN cannot reach the sensitive service while a permitted VLAN can. It would support the separate mechanism: VLANs separate broadcast domains but routed interfaces may still permit inter-VLAN traffic. In this case the decisive dependency is: An open access port cannot verify user or device identity before allowing network access. The original keyed verification is: A valid corporate supplicant obtains its approved role and the unknown laptop is denied.

Question 544

At the Zincbridge network modernization program, an unknown laptop gains full employee VLAN access through a wired FortiSwitch access port with no authentication. Which setting or practice should be reviewed in future?

  1. Monitor authentication success and rejection events after policy changes
  2. Monitor RADIUS authorization attribute changes after directory reorganizations
  3. Review policer thresholds against normal endpoint behavior
  4. Review LLDP policy on ports repurposed for public access

Explanation

Correct Answer

A:

After implementation, the team should monitor authentication success and rejection events after policy changes as the appropriate recurring safeguard against the identified issue.

Incorrect Answers

B:

Monitor RADIUS authorization attribute changes after directory reorganizations. That safeguard would help prevent recurrence of: Successful authentication alone does not apply differentiated authorization when return attributes are not mapped. The risk being reviewed here is instead: An open access port cannot verify user or device identity before allowing network access. The matching ongoing control is: Monitor authentication success and rejection events after policy changes.

C:

The suggested preventive check is: Review policer thresholds against normal endpoint behavior. Its technical scope concerns: Allowing a protocol does not limit how much bandwidth or switch resources it may consume. This question asks how to sustain control over: An open access port cannot verify user or device identity before allowing network access. The more targeted safeguard is: Monitor authentication success and rejection events after policy changes.

D:

Review LLDP policy on ports repurposed for public access. That safeguard would help prevent recurrence of: Unrestricted discovery data can reveal network topology and device details to unknown endpoints. The risk being reviewed here is instead: An open access port cannot verify user or device identity before allowing network access. The matching ongoing control is: Monitor authentication success and rejection events after policy changes.

Question 545

At the Orchardfield LAN operations group, a port policy enforces 802.1X but every employee fails authentication because the configured RADIUS server is unreachable. Which corrective action best meets the requirement?

  1. Fix RADIUS addressing reachability and shared trust before changing the wired port policy
  2. Select supported MAC-based authentication where individual attached device identities must be verified
  3. Correct the DHCP snooping trust setting on the designated server-facing uplink
  4. Attach the authorized port security profile to the intended FortiSwitch interfaces

Explanation

Correct Answer

A:

This is the direct FortiSwitch 7.6 administration remedy: fix RADIUS addressing reachability and shared trust before changing the wired port policy. The observed risk is that 802.1X authentication relies on successful exchange with its configured identity server; a passing acceptance check would show that a known user authenticates and the RADIUS server logs a permitted request.

Incorrect Answers

B:

The offered action is: Select supported MAC-based authentication where individual attached device identities must be verified. It is associated with this separate technical condition: Port-level authorization can allow multiple devices once the port itself authenticates. The actual incident concerns a different dependency: 802.1X authentication relies on successful exchange with its configured identity server. The corresponding change is: Fix RADIUS addressing reachability and shared trust before changing the wired port policy.

C:

Correct the DHCP snooping trust setting on the designated server-facing uplink can be useful for another FortiSwitch 7.6 administration workflow, but it leaves the immediate failure unresolved. Here the priority is to fix RADIUS addressing reachability and shared trust before changing the wired port policy. For the Orchardfield LAN operations group, the direct corrective action is to fix RADIUS addressing reachability and shared trust before changing the wired port policy.

D:

The offered alternative is: Attach the authorized port security profile to the intended FortiSwitch interfaces. It addresses this separate failure mode: A policy object that is never applied does not enforce access restrictions. In the current case, the observed mechanism is: 802.1X authentication relies on successful exchange with its configured identity server. The keyed action, Fix RADIUS addressing reachability and shared trust before changing the wired port policy., targets that condition more directly.

Question 546

At the Orchardfield LAN operations group, a port policy enforces 802.1X but every employee fails authentication because the configured RADIUS server is unreachable. Which underlying issue most directly explains this situation?

  1. 802.1X authentication relies on successful exchange with its configured identity server
  2. Unlimited downstream MAC learning can broaden access and consume switch forwarding resources
  3. An unrestricted ingress path forwards matching frames before intended access controls apply
  4. Uncontrolled flooded frames can spread to other subscribers within the same VLAN

Explanation

Correct Answer

A:

The evidence indicates that 802.1X authentication relies on successful exchange with its configured identity server. The appropriate response is to fix RADIUS addressing reachability and shared trust before changing the wired port policy and demonstrate that a known user authenticates and the RADIUS server logs a permitted request.

Incorrect Answers

B:

Unlimited downstream MAC learning can broaden access and consume switch forwarding resources. That is not the mechanism that accounts for the stated failure at the Orchardfield LAN operations group.

C:

The offered principle is: An unrestricted ingress path forwards matching frames before intended access controls apply. In the source material it is associated with: An unrestricted ingress path forwards matching frames before intended access controls apply. This case has a different controlling cause: 802.1X authentication relies on successful exchange with its configured identity server. Its keyed mechanism is: 802.1X authentication relies on successful exchange with its configured identity server.

D:

Although uncontrolled flooded frames can spread to other subscribers within the same VLAN, the presented symptoms do not support that as the primary cause; they indicate that 802.1X authentication relies on successful exchange with its configured identity server. For the Orchardfield LAN operations group, the direct corrective action is to fix RADIUS addressing reachability and shared trust before changing the wired port policy.

Question 547

At the Orchardfield LAN operations group, a port policy enforces 802.1X but every employee fails authentication because the configured RADIUS server is unreachable. What evidence would justify considering this concern addressed?

  1. A test phone follows the intended 802.1X first sequence and receives its approved role
  2. A prohibited test packet is denied and authorized traffic still passes
  3. A known user authenticates and the RADIUS server logs a permitted request
  4. The prohibited flow is dropped and allowed office traffic remains operational

Explanation

Correct Answer

C:

At the Orchardfield LAN operations group, evidence that a known user authenticates and the RADIUS server logs a permitted request directly validates the correction, instead of testing a neighboring service.

Incorrect Answers

A:

A test phone follows the intended 802.1X first sequence and receives its approved role. That result would test a control for this other failure: Authentication ordering can select a lower-assurance fallback despite a viable stronger identity method. The question instead requires evidence for: 802.1X authentication relies on successful exchange with its configured identity server. The direct outcome to verify is: A known user authenticates and the RADIUS server logs a permitted request.

B:

The offered observation is: A prohibited test packet is denied and authorized traffic still passes. It would support the separate mechanism: ACL evaluation precedence can allow a general rule to bypass a later specific restriction. In this case the decisive dependency is: 802.1X authentication relies on successful exchange with its configured identity server. The original keyed verification is: A known user authenticates and the RADIUS server logs a permitted request.

D:

The offered observation is: The prohibited flow is dropped and allowed office traffic remains operational. It would support the separate mechanism: An unrestricted ingress path forwards matching frames before intended access controls apply. In this case the decisive dependency is: 802.1X authentication relies on successful exchange with its configured identity server. The original keyed verification is: A known user authenticates and the RADIUS server logs a permitted request.

Question 548

At the Orchardfield LAN operations group, a port policy enforces 802.1X but every employee fails authentication because the configured RADIUS server is unreachable. How should the organization sustain the improvement?

  1. Review fallback VLAN rules whenever user groups change
  2. Compare profile attachments with the access inventory
  3. Retest relay and snooping together after L3 changes
  4. Check RADIUS server health and route reachability continuously

Explanation

Correct Answer

D:

The needed prevention is to check RADIUS server health and route reachability continuously. It directly sustains the original change to fix RADIUS addressing reachability and shared trust before changing the wired port policy.

Incorrect Answers

A:

The suggested preventive check is: Review fallback VLAN rules whenever user groups change. Its technical scope concerns: A failed supplicant must not inherit the same permissions as an authenticated employee. This question asks how to sustain control over: 802.1X authentication relies on successful exchange with its configured identity server. The more targeted safeguard is: Check RADIUS server health and route reachability continuously.

B:

Compare profile attachments with the access inventory. That safeguard would help prevent recurrence of: A policy object that is never applied does not enforce access restrictions. The risk being reviewed here is instead: 802.1X authentication relies on successful exchange with its configured identity server. The matching ongoing control is: Check RADIUS server health and route reachability continuously.

C:

That routine supports dhcp relay and snooping confusion, but the relevant ongoing risk requires the team to check RADIUS server health and route reachability continuously. For the Orchardfield LAN operations group, the direct corrective action is to fix RADIUS addressing reachability and shared trust before changing the wired port policy.

Question 549

At the Alderbridge regional network integrator, a previously compliant workstation fails wired 802.1X after its device certificate expires. Which approach best resolves the described issue?

  1. Set the supported authentication-server timeout behavior to a narrowly constrained approved VLAN
  2. Renew the client certificate through the approved trust chain and verify EAP-TLS authentication
  3. Define and attach the supported egress ACL at the correct output stage and scope
  4. Use supported VLAN storm control or filtering on the risky access path

Explanation

Correct Answer

B:

For the Alderbridge regional network integrator, the appropriate correction is to renew the client certificate through the approved trust chain and verify EAP-TLS authentication. The decisive reason is that a certificate-based EAP method cannot accept a client credential outside its trusted validity period; acceptance evidence is that a renewed workstation joins the secure VLAN and an expired certificate remains rejected.

Incorrect Answers

A:

Set the supported authentication-server timeout behavior to a narrowly constrained approved VLAN can be useful for another FortiSwitch 7.6 administration workflow, but it leaves the immediate failure unresolved. Here the priority is to renew the client certificate through the approved trust chain and verify EAP-TLS authentication. For the Alderbridge regional network integrator, the direct corrective action is to renew the client certificate through the approved trust chain and verify EAP-TLS authentication.

C:

This alternative would be suitable where an ingress-only filter may not cover the intended egress direction of a prohibited flow. It does not by itself resolve the need to renew the client certificate through the approved trust chain and verify EAP-TLS authentication. For the Alderbridge regional network integrator, the direct corrective action is to renew the client certificate through the approved trust chain and verify EAP-TLS authentication.

D:

Use supported VLAN storm control or filtering on the risky access path addresses a different kind of problem: uncontrolled flooded frames can spread to other subscribers within the same VLAN. Here the reported weakness is that a certificate-based EAP method cannot accept a client credential outside its trusted validity period. For the Alderbridge regional network integrator, the direct corrective action is to renew the client certificate through the approved trust chain and verify EAP-TLS authentication.

Question 550

At the Alderbridge regional network integrator, a previously compliant workstation fails wired 802.1X after its device certificate expires. Which explanation best accounts for the concern?

  1. A certificate-based EAP method cannot accept a client credential outside its trusted validity period
  2. An open access port cannot verify user or device identity before allowing network access
  3. A policy object that is never applied does not enforce access restrictions
  4. Overbroad ACL scope can deny unrelated applications sharing the same switch

Explanation

Correct Answer

A:

The strongest explanation is that a certificate-based EAP method cannot accept a client credential outside its trusted validity period. This accounts for the outcome and supports the action to renew the client certificate through the approved trust chain and verify EAP-TLS authentication.

Incorrect Answers

B:

Although an open access port cannot verify user or device identity before allowing network access, the presented symptoms do not support that as the primary cause; they indicate that a certificate-based EAP method cannot accept a client credential outside its trusted validity period. For the Alderbridge regional network integrator, the direct corrective action is to renew the client certificate through the approved trust chain and verify EAP-TLS authentication.

C:

The offered principle is: A policy object that is never applied does not enforce access restrictions. In the source material it is associated with: A policy object that is never applied does not enforce access restrictions. This case has a different controlling cause: A certificate-based EAP method cannot accept a client credential outside its trusted validity period. Its keyed mechanism is: A certificate-based EAP method cannot accept a client credential outside its trusted validity period.

D:

Overbroad ACL scope can deny unrelated applications sharing the same switch. That may occur elsewhere, but the evidence at the Alderbridge regional network integrator instead points to the fact that a certificate-based EAP method cannot accept a client credential outside its trusted validity period.

Fortinet NSE 5 - FortiSwitch 7.6 Administrator (NSE5_FSW_AD-7.6) Practice Tests