Question 240
A presales engineer reviews this invented requirement: A school district estimates its expansion from head-office ports while dozens of satellite buildings are absent from the site list. Which durable operating practice most directly reduces recurrence?
Explanation
Correct Answer
A presales bill of materials cannot be accurate when site, device and connectivity inventories are incomplete. Conduct validated site discovery and reconcile every physical and logical endpoint with stakeholder requirements. The accepted design inventory lists each facility, port class, device function and growth assumption. A school district estimates its expansion from head-office ports while dozens of satellite buildings are absent from the site list.
Incorrect Answers
Campus topology should match segmentation, scale, operations and resiliency requirements rather than a fixed diagram, but a presales bill of materials cannot be accurate when site, device and connectivity inventories are incomplete.
A school district estimates its expansion from head-office ports while dozens of satellite buildings are absent from the site list. Initial acquisition price alone cannot represent a network solution's long-term total cost, whereas a presales bill of materials cannot be accurate when site, device and connectivity inventories are incomplete.
Port counts cannot determine the required policy architecture when access depends on user and device identity, while a presales bill of materials cannot be accurate when site, device and connectivity inventories are incomplete.