McAfee Secure

PMI CAPM Bundle

Exam Code: CAPM

Exam Name Certified Associate in Project Management (PMI-100)

Certification Provider: PMI

Corresponding Certification: CAPM

PMI CAPM Bundle $44.99

100% PMI CAPM Guaranteed Success With Testking Training Materials

Get Real CAPM Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    CAPM Questions & Answers

    688 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual CAPM exam while allowing you to hone and measure every aspect of your test-taking ability.

  • CAPM Video Course

    CAPM Training Course

    123 Video Lectures

    CAPM Video Course is developed by PMI Professionals to help you pass the CAPM exam.

    Description

    This course will improve your knowledge and skills required to pass Certified Associate in Project Management (PMI-100) exam.
  • Study Guide

    CAPM Study Guide

    719 PDF Pages

    Developed by industry experts, this 719-page guide spells out in painstaking detail all of the information you need to ace CAPM exam.

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers

    Questions & Answers

    688 Questions

    $124.99
  • CAPM Video Course

    Training Course

    123 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    719 PDF Pages

    $29.99

PMI CAPM Practice Test 17

Question 160

In a fictional CAPM project situation, a virtual software team lacks a reliable shared board or frequent feedback from its product representative. Which action most directly addresses the problem while respecting the relevant roles and constraints?

  1. Set up transparent digital work tracking and regular remote review ceremonies.
  2. Use the existing automated deployment capability to deliver smaller validated increments.
  3. Explore a managed adaptive arrangement with staged outcomes and transparent reprioritization.
  4. Use an adaptive flow-based approach with explicit priority and work-in-progress limits.

Explanation

Correct Answer

A:

This directly addresses the case's governing problem: Set up transparent digital work tracking and regular remote review ceremonies. The key reason is that adaptive work needs visibility and timely collaboration regardless of location. A suitable completion check is: Accessible board data and review notes show aligned priorities and blockers.

Incorrect Answers

B:

“Use the existing automated deployment capability to deliver smaller validated increments” responds to another technical or business failure: In a fictional CAPM project situation, a research team has safe deployment automation but waits six months to show working software. That source case depends on: Automation and engaged stakeholders are assets that support adaptive flow. The present issue is: In a fictional CAPM project situation, a virtual software team lacks a reliable shared board or frequent feedback from its product representative. The more direct action is “Set up transparent digital work tracking and regular remote review ceremonies” because adaptive work needs visibility and timely collaboration regardless of location.

C:

“Explore a managed adaptive arrangement with staged outcomes and transparent reprioritization” responds to another technical or business failure: In a fictional CAPM project situation, a government service product has unstable user needs but its contract fixes every feature detail upfront. That source case depends on: Uncertain requirements fit shorter feedback cycles when governance allows them. The present issue is: In a fictional CAPM project situation, a virtual software team lacks a reliable shared board or frequent feedback from its product representative. The more direct action is “Set up transparent digital work tracking and regular remote review ceremonies” because adaptive work needs visibility and timely collaboration regardless of location.

D:

“Use an adaptive flow-based approach with explicit priority and work-in-progress limits” responds to another technical or business failure: In a fictional CAPM project situation, a mature maintenance team has repetitive urgent tickets arriving continuously, and sprint commitment frequently collapses. That source case depends on: Interrupt-driven work may be managed better through flow than fixed batches. The present issue is: In a fictional CAPM project situation, a virtual software team lacks a reliable shared board or frequent feedback from its product representative. The more direct action is “Set up transparent digital work tracking and regular remote review ceremonies” because adaptive work needs visibility and timely collaboration regardless of location.

Question 161

In a fictional CAPM project situation, a vendor dispute becomes personal while both parties disagree about contract acceptance evidence. Which underlying project-management principle best explains the appropriate response?

  1. Effective management balances accountability with expert input.
  2. Fact-based negotiation resolves delivery issues more reliably than personal accusations.
  3. Responsible leadership balances respect for people with truthful risk reporting.
  4. Matrix management needs explicit alignment between functional and project authorities.

Explanation

Correct Answer

B:

The case turns on this distinction: Fact-based negotiation resolves delivery issues more reliably than personal accusations. Consequently, the targeted action is: Separate positions from objective acceptance criteria and facilitate evidence-based negotiation. This reasoning can be checked against: The joint record cites contract criteria, factual test results, and an agreed resolution.

Incorrect Answers

A:

“Effective management balances accountability with expert input” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a new project manager makes all work decisions without consulting specialists who understand safety regulations. There the technical reason is: Effective management balances accountability with expert input. In this question, the reported issue is: In a fictional CAPM project situation, a vendor dispute becomes personal while both parties disagree about contract acceptance evidence. The controlling principle is instead: Fact-based negotiation resolves delivery issues more reliably than personal accusations.

C:

“Responsible leadership balances respect for people with truthful risk reporting” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a line manager asks the project manager to conceal a junior colleague's reported safety concern to preserve team morale. There the technical reason is: Responsible leadership balances respect for people with truthful risk reporting. In this question, the reported issue is: In a fictional CAPM project situation, a vendor dispute becomes personal while both parties disagree about contract acceptance evidence. The controlling principle is instead: Fact-based negotiation resolves delivery issues more reliably than personal accusations.

D:

“Matrix management needs explicit alignment between functional and project authorities” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a remote team has unclear coordination between the functional lead who allocates analysts and the project manager who assigns project priorities. There the technical reason is: Matrix management needs explicit alignment between functional and project authorities. In this question, the reported issue is: In a fictional CAPM project situation, a vendor dispute becomes personal while both parties disagree about contract acceptance evidence. The controlling principle is instead: Fact-based negotiation resolves delivery issues more reliably than personal accusations.

Question 162

In a fictional CAPM project situation, a data-center migration identifies a single power vendor whose outage could delay the move. What evidence would most directly demonstrate that the appropriate response was effective?

  1. The stakeholder register includes regulators, influence, expectations, and communication owners.
  2. The schedule lists the signoff as a dated event without duration.
  3. The risk register links the vendor risk to a funded fallback and activation trigger.
  4. A resource-loaded plan exposes and resolves the technician over-allocation.

Explanation

Correct Answer

C:

The specified evidence tests the exact improvement at issue: The risk register links the vendor risk to a funded fallback and activation trigger. It supports the chosen response (register the vendor dependency with impact, response owner, and contingency action.) rather than merely recording activity. The principle is: Planning for uncertainty is more effective before the vendor fails.

Incorrect Answers

A:

“The stakeholder register includes regulators, influence, expectations, and communication owners” is evidence for a different source case: In a fictional CAPM project situation, a regional policy project has many regulators, but the team records only the funding sponsor as stakeholder. Its related mechanism is: Missing an influential stakeholder creates avoidable approval and acceptance risk. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a data-center migration identifies a single power vendor whose outage could delay the move. The source-keyed acceptance evidence is “The risk register links the vendor risk to a funded fallback and activation trigger”.

B:

“The schedule lists the signoff as a dated event without duration” is evidence for a different source case: In a fictional CAPM project situation, a mobile app launch plan shows a zero-day security signoff as if it were a two-week development task. Its related mechanism is: A milestone marks an event; work activities consume time and resources. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a data-center migration identifies a single power vendor whose outage could delay the move. The source-keyed acceptance evidence is “The risk register links the vendor risk to a funded fallback and activation trigger”.

D:

“A resource-loaded plan exposes and resolves the technician over-allocation” is evidence for a different source case: In a fictional CAPM project situation, a manufacturing refit schedules three technicians for eight simultaneous specialized calibrations. Its related mechanism is: An activity plan is infeasible when required skills exceed available capacity. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a data-center migration identifies a single power vendor whose outage could delay the move. The source-keyed acceptance evidence is “The risk register links the vendor risk to a funded fallback and activation trigger”.

Question 163

In a fictional CAPM project situation, a campus building project has promised energy savings, but baseline utility consumption was never captured. Which underlying project-management principle best explains the appropriate response?

  1. New external constraints can alter the project business case and obligations.
  2. Benefits realization requires comparing observed outcomes with a valid baseline.
  3. A vague contingency cannot be applied consistently under pressure.
  4. Effective communication must suit stakeholder language and information needs.

Explanation

Correct Answer

B:

The case turns on this distinction: Benefits realization requires comparing observed outcomes with a valid baseline. Consequently, the targeted action is: Establish the baseline and benefits measurement responsibilities before claiming savings. This reasoning can be checked against: An approved plan defines baseline consumption, target, and measurement period.

Incorrect Answers

A:

“New external constraints can alter the project business case and obligations” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a security team receives new data residency requirements after project authorization. There the technical reason is: New external constraints can alter the project business case and obligations. In this question, the reported issue is: In a fictional CAPM project situation, a campus building project has promised energy savings, but baseline utility consumption was never captured. The controlling principle is instead: Benefits realization requires comparing observed outcomes with a valid baseline.

C:

“A vague contingency cannot be applied consistently under pressure” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a logistics project lists a high-impact delay risk and assigns a workaround but omits a trigger. There the technical reason is: A vague contingency cannot be applied consistently under pressure. In this question, the reported issue is: In a fictional CAPM project situation, a campus building project has promised energy savings, but baseline utility consumption was never captured. The controlling principle is instead: Benefits realization requires comparing observed outcomes with a valid baseline.

D:

“Effective communication must suit stakeholder language and information needs” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a communications plan requires accessible summaries, yet a team shares only technical diagrams with community representatives. There the technical reason is: Effective communication must suit stakeholder language and information needs. In this question, the reported issue is: In a fictional CAPM project situation, a campus building project has promised energy savings, but baseline utility consumption was never captured. The controlling principle is instead: Benefits realization requires comparing observed outcomes with a valid baseline.

Question 164

In a fictional CAPM project situation, a facilities renewal has earned value $84,000 and actual cost $70,000. Which continuing control would most directly reduce the chance of this problem recurring?

  1. Validate each package against the scope baseline before scheduling tasks.
  2. Use consistent package definitions and control accounts for reporting.
  3. Add inspection hold points and trend defect causes during execution.
  4. Check quality and scope completeness before celebrating favorable CPI.

Explanation

Correct Answer

D:

This ongoing practice maintains the improvement: Check quality and scope completeness before celebrating favorable CPI. It follows the targeted action (calculate CPI = EV / AC = 1.20 and verify the underlying work quality.) and provides a way to catch recurrence. The underlying principle is: A CPI above 1 means more budgeted value earned per unit of actual cost.

Incorrect Answers

A:

“Validate each package against the scope baseline before scheduling tasks” addresses recurrence of another problem: In a fictional CAPM project situation, a highway resurfacing project lists asphalt and drainage as tasks but misses acceptance deliverables. That problem depends on: This ongoing practice maintains the improvement: Validate each package against the scope baseline before scheduling tasks. The recurring risk here is: In a fictional CAPM project situation, a facilities renewal has earned value $84,000 and actual cost $70,000. The more targeted safeguard is “Check quality and scope completeness before celebrating favorable CPI” because this ongoing practice maintains the improvement: Check quality and scope completeness before celebrating favorable CPI.

B:

“Use consistent package definitions and control accounts for reporting” addresses recurrence of another problem: In a fictional CAPM project situation, a museum exhibit team cannot assign cost accountability because its WBS elements are too broad. That problem depends on: This ongoing practice maintains the improvement: Use consistent package definitions and control accounts for reporting. The recurring risk here is: In a fictional CAPM project situation, a facilities renewal has earned value $84,000 and actual cost $70,000. The more targeted safeguard is “Check quality and scope completeness before celebrating favorable CPI” because this ongoing practice maintains the improvement: Check quality and scope completeness before celebrating favorable CPI.

C:

“Add inspection hold points and trend defect causes during execution” addresses recurrence of another problem: In a fictional CAPM project situation, a wastewater upgrade finds failed pressure tests after piping installation. That problem depends on: This ongoing practice maintains the improvement: Add inspection hold points and trend defect causes during execution. The recurring risk here is: In a fictional CAPM project situation, a facilities renewal has earned value $84,000 and actual cost $70,000. The more targeted safeguard is “Check quality and scope completeness before celebrating favorable CPI” because this ongoing practice maintains the improvement: Check quality and scope completeness before celebrating favorable CPI.

Question 165

In a fictional CAPM project situation, a consultant evaluating bids for a city project discovers a relative owns one bidding firm. Which continuing control would most directly reduce the chance of this problem recurring?

  1. Retain auditable test reports and transparent escalation paths.
  2. Keep scope boundaries and acceptance criteria explicit and change-controlled.
  3. Require periodic conflict-of-interest declarations from evaluators.
  4. Review realized benefits after handover, not merely equipment installation.

Explanation

Correct Answer

C:

This ongoing practice maintains the improvement: Require periodic conflict-of-interest declarations from evaluators. It follows the targeted action (disclose the conflict and recuse or follow the required impartial procurement process.) and provides a way to catch recurrence. The underlying principle is: Undisclosed personal interest compromises fairness and the appearance of impartiality.

Incorrect Answers

A:

“Retain auditable test reports and transparent escalation paths” addresses recurrence of another problem: In a fictional CAPM project situation, a project sponsor urges the coordinator to hide adverse test results before a regulator briefing. That problem depends on: This ongoing practice maintains the improvement: Retain auditable test reports and transparent escalation paths. The recurring risk here is: In a fictional CAPM project situation, a consultant evaluating bids for a city project discovers a relative owns one bidding firm. The more targeted safeguard is “Require periodic conflict-of-interest declarations from evaluators” because this ongoing practice maintains the improvement: Require periodic conflict-of-interest declarations from evaluators.

B:

“Keep scope boundaries and acceptance criteria explicit and change-controlled” addresses recurrence of another problem: In a fictional CAPM project situation, a team proposes adding a mobile app to a water-meter project whose approved scope covers only sensor installation. That problem depends on: This ongoing practice maintains the improvement: Keep scope boundaries and acceptance criteria explicit and change-controlled. The recurring risk here is: In a fictional CAPM project situation, a consultant evaluating bids for a city project discovers a relative owns one bidding firm. The more targeted safeguard is “Require periodic conflict-of-interest declarations from evaluators” because this ongoing practice maintains the improvement: Require periodic conflict-of-interest declarations from evaluators.

D:

“Review realized benefits after handover, not merely equipment installation” addresses recurrence of another problem: In a fictional CAPM project situation, a hospital redesign aims to shorten patient waiting time but its charter only mentions installing kiosks. That problem depends on: This ongoing practice maintains the improvement: Review realized benefits after handover, not merely equipment installation. The recurring risk here is: In a fictional CAPM project situation, a consultant evaluating bids for a city project discovers a relative owns one bidding firm. The more targeted safeguard is “Require periodic conflict-of-interest declarations from evaluators” because this ongoing practice maintains the improvement: Require periodic conflict-of-interest declarations from evaluators.

Question 166

In a fictional CAPM project situation, a rail signaling project has three activities dependent on a single final software test, but the test is absent from its network. What evidence would most directly demonstrate that the appropriate response was effective?

  1. Inspection records show acceptance of each deliverable package.
  2. Network and schedule show test predecessor links and acceptance completion.
  3. The long path totals 3+8+4=15 days; the other totals 3+5+4=12.
  4. SPI equals 0.70 using the same effort-value units.

Explanation

Correct Answer

B:

The specified evidence tests the exact improvement at issue: Network and schedule show test predecessor links and acceptance completion. It supports the chosen response (add the integration test as a dependent activity before final acceptance.) rather than merely recording activity. The principle is: Omitted dependencies create an artificially early finish forecast.

Incorrect Answers

A:

“Inspection records show acceptance of each deliverable package” is evidence for a different source case: In a fictional CAPM project situation, a food-storage build uses estimated task durations but no formal scope acceptance thresholds. Its related mechanism is: Estimating work alone does not establish verified completion. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a rail signaling project has three activities dependent on a single final software test, but the test is absent from its network. The source-keyed acceptance evidence is “Network and schedule show test predecessor links and acceptance completion”.

C:

“The long path totals 3+8+4=15 days; the other totals 3+5+4=12” is evidence for a different source case: In a fictional CAPM project situation, an archive migration has two parallel paths: P 3d then Q 8d; P 3d then R 5d; both require S 4d. Its related mechanism is: The longest dependent route controls completion in an unconstrained network. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a rail signaling project has three activities dependent on a single final software test, but the test is absent from its network. The source-keyed acceptance evidence is “Network and schedule show test predecessor links and acceptance completion”.

D:

“SPI equals 0.70 using the same effort-value units” is evidence for a different source case: In a fictional CAPM project situation, a campus lighting installation plans 90 days of effort value by the checkpoint but has earned only 63 equivalent days. Its related mechanism is: Earned work is only 70% of planned work in earned-value terms. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a rail signaling project has three activities dependent on a single final software test, but the test is absent from its network. The source-keyed acceptance evidence is “Network and schedule show test predecessor links and acceptance completion”.

Question 167

In a fictional CAPM project situation, a subscription product releases a cancellation feature whose acceptance criteria merely state 'works correctly'. Which underlying project-management principle best explains the appropriate response?

  1. Unmeasurable criteria make acceptance subjective and hard to defend.
  2. Functional completion cannot replace nonfunctional acceptance evidence.
  3. High completion percentages cannot waive specific critical requirements.
  4. A successful demo does not negate a failed mandatory resilience requirement.

Explanation

Correct Answer

A:

The case turns on this distinction: Unmeasurable criteria make acceptance subjective and hard to defend. Consequently, the targeted action is: Define observable cancellation outcomes and exceptions with stakeholders before acceptance. This reasoning can be checked against: Tests prove expected end date, charges, confirmation, and edge cases.

Incorrect Answers

B:

“Functional completion cannot replace nonfunctional acceptance evidence” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a cargo booking system passes functional tests but misses its agreed response-time threshold under peak load. There the technical reason is: Functional completion cannot replace nonfunctional acceptance evidence. In this question, the reported issue is: In a fictional CAPM project situation, a subscription product releases a cancellation feature whose acceptance criteria merely state 'works correctly'. The controlling principle is instead: Unmeasurable criteria make acceptance subjective and hard to defend.

C:

“High completion percentages cannot waive specific critical requirements” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a public safety dispatch product has traceability for 95% of requirements while five mandatory alerts are untested. There the technical reason is: High completion percentages cannot waive specific critical requirements. In this question, the reported issue is: In a fictional CAPM project situation, a subscription product releases a cancellation feature whose acceptance criteria merely state 'works correctly'. The controlling principle is instead: Unmeasurable criteria make acceptance subjective and hard to defend.

D:

“A successful demo does not negate a failed mandatory resilience requirement” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a warehouse dispatch feature passes demonstrations but fails an agreed offline-recovery scenario. There the technical reason is: A successful demo does not negate a failed mandatory resilience requirement. In this question, the reported issue is: In a fictional CAPM project situation, a subscription product releases a cancellation feature whose acceptance criteria merely state 'works correctly'. The controlling principle is instead: Unmeasurable criteria make acceptance subjective and hard to defend.

Question 168

In a fictional CAPM project situation, a project lead speaks over junior specialists during a design risk workshop. Which underlying project-management principle best explains the appropriate response?

  1. Leadership develops capability and trust; metrics alone do not motivate teams.
  2. Without defined decision rights, approval work falls between participants.
  3. Respectful facilitation improves the quality of risk discovery and engagement.
  4. Escalation should follow materiality and decision rights, not bypass delegation.

Explanation

Correct Answer

C:

The case turns on this distinction: Respectful facilitation improves the quality of risk discovery and engagement. Consequently, the targeted action is: Invite each specialist to present evidence and listen before selecting a response. This reasoning can be checked against: Meeting notes capture diverse perspectives and risk evidence.

Incorrect Answers

A:

“Leadership develops capability and trust; metrics alone do not motivate teams” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a coordinator uses performance reports to pressure a burned-out team rather than removing obstacles. There the technical reason is: Leadership develops capability and trust; metrics alone do not motivate teams. In this question, the reported issue is: In a fictional CAPM project situation, a project lead speaks over junior specialists during a design risk workshop. The controlling principle is instead: Respectful facilitation improves the quality of risk discovery and engagement.

B:

“Without defined decision rights, approval work falls between participants” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a distributed project reports tasks complete, but nobody owns the final regulatory signoff. There the technical reason is: Without defined decision rights, approval work falls between participants. In this question, the reported issue is: In a fictional CAPM project situation, a project lead speaks over junior specialists during a design risk workshop. The controlling principle is instead: Respectful facilitation improves the quality of risk discovery and engagement.

D:

“Escalation should follow materiality and decision rights, not bypass delegation” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a construction architect asks the sponsor to approve routine drawing corrections already delegated to the lead engineer. There the technical reason is: Escalation should follow materiality and decision rights, not bypass delegation. In this question, the reported issue is: In a fictional CAPM project situation, a project lead speaks over junior specialists during a design risk workshop. The controlling principle is instead: Respectful facilitation improves the quality of risk discovery and engagement.

Question 169

In a fictional CAPM project situation, a municipal project team blames an absent analyst for late requirements and avoids discussing blockers. What evidence would most directly demonstrate that the appropriate response was effective?

  1. Meeting notes capture diverse perspectives and risk evidence.
  2. Workload trends and team feedback show a manageable sustainable pace.
  3. The meeting yields agreed actions and the analyst's constraints are acknowledged.
  4. A RACI-style matrix shows a single accountability path for signoff.

Explanation

Correct Answer

C:

The specified evidence tests the exact improvement at issue: The meeting yields agreed actions and the analyst's constraints are acknowledged. It supports the chosen response (facilitate a constructive conversation focused on facts, needs, and shared next steps.) rather than merely recording activity. The principle is: Emotional intelligence supports listening and conflict resolution rather than blame.

Incorrect Answers

A:

“Meeting notes capture diverse perspectives and risk evidence” is evidence for a different source case: In a fictional CAPM project situation, a project lead speaks over junior specialists during a design risk workshop. Its related mechanism is: Respectful facilitation improves the quality of risk discovery and engagement. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a municipal project team blames an absent analyst for late requirements and avoids discussing blockers. The source-keyed acceptance evidence is “The meeting yields agreed actions and the analyst's constraints are acknowledged”.

B:

“Workload trends and team feedback show a manageable sustainable pace” is evidence for a different source case: In a fictional CAPM project situation, a coordinator uses performance reports to pressure a burned-out team rather than removing obstacles. Its related mechanism is: Leadership develops capability and trust; metrics alone do not motivate teams. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a municipal project team blames an absent analyst for late requirements and avoids discussing blockers. The source-keyed acceptance evidence is “The meeting yields agreed actions and the analyst's constraints are acknowledged”.

D:

“A RACI-style matrix shows a single accountability path for signoff” is evidence for a different source case: In a fictional CAPM project situation, a distributed project reports tasks complete, but nobody owns the final regulatory signoff. Its related mechanism is: Without defined decision rights, approval work falls between participants. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a municipal project team blames an absent analyst for late requirements and avoids discussing blockers. The source-keyed acceptance evidence is “The meeting yields agreed actions and the analyst's constraints are acknowledged”.

Question 170

In a fictional CAPM project situation, a facilities renewal has earned value $84,000 and actual cost $70,000. Which action most directly addresses the problem while respecting the relevant roles and constraints?

  1. Decompose the deliverable scope into verifiable WBS work packages.
  2. Calculate CPI = EV / AC = 1.20 and verify the underlying work quality.
  3. Decompose major deliverables to manageable work packages with accountable owners.
  4. Apply the quality plan's inspection and corrective-action procedure before signoff.

Explanation

Correct Answer

B:

This directly addresses the case's governing problem: Calculate CPI = EV / AC = 1.20 and verify the underlying work quality. The key reason is that a CPI above 1 means more budgeted value earned per unit of actual cost. A suitable completion check is: Cost performance index equals 1.20 at the reporting cutoff.

Incorrect Answers

A:

“Decompose the deliverable scope into verifiable WBS work packages” responds to another technical or business failure: In a fictional CAPM project situation, a highway resurfacing project lists asphalt and drainage as tasks but misses acceptance deliverables. That source case depends on: A WBS organizes the full approved scope by deliverables rather than by random activities. The present issue is: In a fictional CAPM project situation, a facilities renewal has earned value $84,000 and actual cost $70,000. The more direct action is “Calculate CPI = EV / AC = 1.20 and verify the underlying work quality” because a CPI above 1 means more budgeted value earned per unit of actual cost.

C:

“Decompose major deliverables to manageable work packages with accountable owners” responds to another technical or business failure: In a fictional CAPM project situation, a museum exhibit team cannot assign cost accountability because its WBS elements are too broad. That source case depends on: A usable WBS supports planning and cost control at a manageable level. The present issue is: In a fictional CAPM project situation, a facilities renewal has earned value $84,000 and actual cost $70,000. The more direct action is “Calculate CPI = EV / AC = 1.20 and verify the underlying work quality” because a CPI above 1 means more budgeted value earned per unit of actual cost.

D:

“Apply the quality plan's inspection and corrective-action procedure before signoff” responds to another technical or business failure: In a fictional CAPM project situation, a wastewater upgrade finds failed pressure tests after piping installation. That source case depends on: Conformance must be demonstrated against requirements, not presumed from installation. The present issue is: In a fictional CAPM project situation, a facilities renewal has earned value $84,000 and actual cost $70,000. The more direct action is “Calculate CPI = EV / AC = 1.20 and verify the underlying work quality” because a CPI above 1 means more budgeted value earned per unit of actual cost.