Question 200
An imaginary enterprise networking change reveals: A solution architect builds a Huawei presales configuration in an old SCT template that omits newly proposed interfaces. Which controlled design change MOST directly addresses this failure?
Explanation
Correct Answer
A solution architect builds a Huawei presales configuration in an old SCT template that omits newly proposed interfaces. Presales configuration tools depend on current supported catalogs and accurate topology inputs. A design-tool output can only be trusted within the supported product and input assumptions. The tool's selected platform, ports and major topology objects match approved source requirements.
Incorrect Answers
A proposal lacking objective acceptance evidence cannot demonstrate that promised functions work in context, while presales configuration tools depend on current supported catalogs and accurate topology inputs.
Untracked commercial revisions can invalidate previously approved technical scope and resilience requirements, but presales configuration tools depend on current supported catalogs and accurate topology inputs.
Capacity designs without measured growth assumptions risk premature congestion or excessive unused equipment, whereas presales configuration tools depend on current supported catalogs and accurate topology inputs.