At Fictional CedarEstuary Media, during pre-production tenant onboarding in the west fabric pod, the SR Linux fabric team records the following exact evidence: A new fabric deployment has correct leaf and spine cabling but its inventory service reports no relationships between devices. Which recurring operational safeguard BEST reduces the chance of the same failure happening again?
Explanation
Correct Answer
The technical mechanism is: The operational inventory lacks reconciled physical topology, node identity and intended endpoint relationships. The recurrence-prevention control most closely connected to this root problem is: Reconcile discovery against design inventory as a required deployment acceptance control. This complements the immediate repair: Import authoritative device identity and topology information into the fabric management system and reconcile observed links. It is justified by the design rule: Fabric-wide management requires trustworthy inventory and topology state in addition to device-by-device configuration. Confirm the repair via: Observed switch and uplink relationships match the intended topology graph and missing-link alarms resolve.
Incorrect Answers
The safeguard “Require service-to-device dependency audits before approving fabric-wide change windows” is directed at another failure. This case records “A new fabric deployment has correct leaf and spine cabling but its inventory service reports no relationships between devices.” The more relevant preventive control is “Reconcile discovery against design inventory as a required deployment acceptance control,” because it follows the recorded cause rather than a different operational problem.
The safeguard “Use reviewed targeting filters and immutable change previews for high-impact fabric operations” is directed at another failure. This case records “A new fabric deployment has correct leaf and spine cabling but its inventory service reports no relationships between devices.” The more relevant preventive control is “Reconcile discovery against design inventory as a required deployment acceptance control,” because it follows the recorded cause rather than a different operational problem.
The safeguard “Require routed transit and loop-free overlay design in fabric topology standards and configuration reviews” is directed at another failure. This case records “A new fabric deployment has correct leaf and spine cabling but its inventory service reports no relationships between devices.” The more relevant preventive control is “Reconcile discovery against design inventory as a required deployment acceptance control,” because it follows the recorded cause rather than a different operational problem.