Question 770
At Fictional WillowCanyon Health, during pre-production tenant onboarding in the west fabric pod, the SR Linux fabric team records the following exact evidence: A new data center fabric intent describes the desired spine interconnects but one leaf remains absent from reconciled topology. Which scoped engineering response BEST addresses the underlying problem?
Explanation
Correct Answer
The causal technical issue is: The fabric-intent inventory omits that leaf or assigns it to the wrong topology group. The focused corrective engineering response is: Correct the declarative node membership and reconcile the intended topology against observed fabric links. The governing engineering principle is: Fabric-intent automation must map design topology to real managed nodes before deployment can be complete. The acceptance check is: The intended leaf appears in the reconciled topology and establishes all required tested fabric adjacencies.
Incorrect Answers
“Constrain the service-intent membership and verify VNI/VRF/route-target bindings before the controller applies the change” addresses a different corrective need. The documented situation is “A new data center fabric intent describes the desired spine interconnects but one leaf remains absent from reconciled topology.” The better-matched targeted correction is “Correct the declarative node membership and reconcile the intended topology against observed fabric links,” because it deals with the specific problem described rather than an adjacent issue.
“Correlate the event stream to current device state and implement explicit alarm-clear reconciliation” addresses a different corrective need. The documented situation is “A new data center fabric intent describes the desired spine interconnects but one leaf remains absent from reconciled topology.” The better-matched targeted correction is “Correct the declarative node membership and reconcile the intended topology against observed fabric links,” because it deals with the specific problem described rather than an adjacent issue.
“Use a policy-controlled intent workflow with preconditions, constrained targets and a reversible change plan” addresses a different corrective need. The documented situation is “A new data center fabric intent describes the desired spine interconnects but one leaf remains absent from reconciled topology.” The better-matched targeted correction is “Correct the declarative node membership and reconcile the intended topology against observed fabric links,” because it deals with the specific problem described rather than an adjacent issue.