McAfee Secure

PMI CAPM Bundle

Exam Code: CAPM

Exam Name Certified Associate in Project Management (PMI-100)

Certification Provider: PMI

Corresponding Certification: CAPM

PMI CAPM Bundle $44.99

100% PMI CAPM Guaranteed Success With Testking Training Materials

Get Real CAPM Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    CAPM Questions & Answers

    688 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual CAPM exam while allowing you to hone and measure every aspect of your test-taking ability.

  • CAPM Video Course

    CAPM Training Course

    123 Video Lectures

    CAPM Video Course is developed by PMI Professionals to help you pass the CAPM exam.

    Description

    This course will improve your knowledge and skills required to pass Certified Associate in Project Management (PMI-100) exam.
  • Study Guide

    CAPM Study Guide

    719 PDF Pages

    Developed by industry experts, this 719-page guide spells out in painstaking detail all of the information you need to ace CAPM exam.

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers

    Questions & Answers

    688 Questions

    $124.99
  • CAPM Video Course

    Training Course

    123 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    719 PDF Pages

    $29.99

PMI CAPM Practice Test 39

Question 380

In a fictional CAPM project situation, a remote engineering team uses lengthy meetings to resolve simple status questions across time zones. What evidence would most directly demonstrate that the appropriate response was effective?

  1. Regional representatives confirm comprehension and consistent policy interpretation.
  2. Resident feedback confirms understanding and records unresolved concerns.
  3. A decision log captures resolved conflicts and outstanding owner actions.
  4. Participants can access current status and spend meeting time on unresolved issues.

Explanation

Correct Answer

D:

The specified evidence tests the exact improvement at issue: Participants can access current status and spend meeting time on unresolved issues. It supports the chosen response (move routine status to an asynchronous shared dashboard and reserve live meetings for decisions.) rather than merely recording activity. The principle is: Communication media should be proportionate to complexity and urgency.

Incorrect Answers

A:

“Regional representatives confirm comprehension and consistent policy interpretation” is evidence for a different source case: In a fictional CAPM project situation, a multinational employee system announces policy changes through one-language email despite local users with different needs. Its related mechanism is: A sent message is ineffective if recipients cannot act on it accurately. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a remote engineering team uses lengthy meetings to resolve simple status questions across time zones. The source-keyed acceptance evidence is “Participants can access current status and spend meeting time on unresolved issues”.

B:

“Resident feedback confirms understanding and records unresolved concerns” is evidence for a different source case: In a fictional CAPM project situation, a local authority must communicate a complex permit change to residents with limited technical background. Its related mechanism is: A useful communication channel matches audience language and participation needs. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a remote engineering team uses lengthy meetings to resolve simple status questions across time zones. The source-keyed acceptance evidence is “Participants can access current status and spend meeting time on unresolved issues”.

C:

“A decision log captures resolved conflicts and outstanding owner actions” is evidence for a different source case: In a fictional CAPM project situation, a global supplier network has conflicting requirements hidden in long email threads. Its related mechanism is: Interactive collaboration is better for reconciling disagreements than fragmented email. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a remote engineering team uses lengthy meetings to resolve simple status questions across time zones. The source-keyed acceptance evidence is “Participants can access current status and spend meeting time on unresolved issues”.

Question 381

In a fictional CAPM project situation, a manufacturing refit schedules three technicians for eight simultaneous specialized calibrations. What evidence would most directly demonstrate that the appropriate response was effective?

  1. Support signs off on runbooks, access, known issues, and service ownership.
  2. An approved closure record identifies the archive and released contracts.
  3. Baselines and subsidiary plans agree on the same authorized objectives.
  4. A resource-loaded plan exposes and resolves the technician over-allocation.

Explanation

Correct Answer

D:

The specified evidence tests the exact improvement at issue: A resource-loaded plan exposes and resolves the technician over-allocation. It supports the chosen response (reconcile resource skills and availability against the activity schedule.) rather than merely recording activity. The principle is: An activity plan is infeasible when required skills exceed available capacity.

Incorrect Answers

A:

“Support signs off on runbooks, access, known issues, and service ownership” is evidence for a different source case: In a fictional CAPM project situation, a charity portal is being handed to support without runbooks or service-owner acceptance. Its related mechanism is: Finishing construction is not the same as transferring the deliverable to operations. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a manufacturing refit schedules three technicians for eight simultaneous specialized calibrations. The source-keyed acceptance evidence is “A resource-loaded plan exposes and resolves the technician over-allocation”.

B:

“An approved closure record identifies the archive and released contracts” is evidence for a different source case: In a fictional CAPM project situation, a marketing campaign closes by deleting its project workspace, losing lessons and procurement records. Its related mechanism is: Closure includes organizational learning and orderly administrative completion. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a manufacturing refit schedules three technicians for eight simultaneous specialized calibrations. The source-keyed acceptance evidence is “A resource-loaded plan exposes and resolves the technician over-allocation”.

C:

“Baselines and subsidiary plans agree on the same authorized objectives” is evidence for a different source case: In a fictional CAPM project situation, a sensor-installation team plans only the product features and overlooks approvals, staffing, and risk response. Its related mechanism is: A product description is not a full management plan for delivering it. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a manufacturing refit schedules three technicians for eight simultaneous specialized calibrations. The source-keyed acceptance evidence is “A resource-loaded plan exposes and resolves the technician over-allocation”.

Question 382

In a fictional CAPM project situation, a health-tech team defers critical data-protection work because its short-term story value score is lower than a new theme. Which underlying project-management principle best explains the appropriate response?

  1. Adaptive delivery should target the greatest feasible benefit, not arbitrary arrival order.
  2. A working increment must meet defined quality and product needs.
  3. Urgent harmful defects may outrank optional features when impact is high.
  4. Risk and compliance constraints are not interchangeable with cosmetic feature value.

Explanation

Correct Answer

D:

The case turns on this distinction: Risk and compliance constraints are not interchangeable with cosmetic feature value. Consequently, the targeted action is: Prioritize mandatory risk controls ahead of optional features despite simplistic scores. This reasoning can be checked against: The visible backlog records the mandatory security constraint and its release gate.

Incorrect Answers

A:

“Adaptive delivery should target the greatest feasible benefit, not arbitrary arrival order” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a backlog includes a feature with high customer impact and a cosmetic tweak; both are estimated equal effort. There the technical reason is: Adaptive delivery should target the greatest feasible benefit, not arbitrary arrival order. In this question, the reported issue is: In a fictional CAPM project situation, a health-tech team defers critical data-protection work because its short-term story value score is lower than a new theme. The controlling principle is instead: Risk and compliance constraints are not interchangeable with cosmetic feature value.

B:

“A working increment must meet defined quality and product needs” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, an adaptive team releases a new booking feature but has no criteria to judge whether it works for users. There the technical reason is: A working increment must meet defined quality and product needs. In this question, the reported issue is: In a fictional CAPM project situation, a health-tech team defers critical data-protection work because its short-term story value score is lower than a new theme. The controlling principle is instead: Risk and compliance constraints are not interchangeable with cosmetic feature value.

C:

“Urgent harmful defects may outrank optional features when impact is high” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a production defect blocks payment while a low-risk enhancement is in progress. There the technical reason is: Urgent harmful defects may outrank optional features when impact is high. In this question, the reported issue is: In a fictional CAPM project situation, a health-tech team defers critical data-protection work because its short-term story value score is lower than a new theme. The controlling principle is instead: Risk and compliance constraints are not interchangeable with cosmetic feature value.

Question 383

In a fictional CAPM project situation, a regional policy project has many regulators, but the team records only the funding sponsor as stakeholder. What evidence would most directly demonstrate that the appropriate response was effective?

  1. The schedule lists the signoff as a dated event without duration.
  2. A resource-loaded plan exposes and resolves the technician over-allocation.
  3. The stakeholder register includes regulators, influence, expectations, and communication owners.
  4. Support signs off on runbooks, access, known issues, and service ownership.

Explanation

Correct Answer

C:

The specified evidence tests the exact improvement at issue: The stakeholder register includes regulators, influence, expectations, and communication owners. It supports the chosen response (identify affected authorities and document interests and engagement strategies.) rather than merely recording activity. The principle is: Missing an influential stakeholder creates avoidable approval and acceptance risk.

Incorrect Answers

A:

“The schedule lists the signoff as a dated event without duration” is evidence for a different source case: In a fictional CAPM project situation, a mobile app launch plan shows a zero-day security signoff as if it were a two-week development task. Its related mechanism is: A milestone marks an event; work activities consume time and resources. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a regional policy project has many regulators, but the team records only the funding sponsor as stakeholder. The source-keyed acceptance evidence is “The stakeholder register includes regulators, influence, expectations, and communication owners”.

B:

“A resource-loaded plan exposes and resolves the technician over-allocation” is evidence for a different source case: In a fictional CAPM project situation, a manufacturing refit schedules three technicians for eight simultaneous specialized calibrations. Its related mechanism is: An activity plan is infeasible when required skills exceed available capacity. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a regional policy project has many regulators, but the team records only the funding sponsor as stakeholder. The source-keyed acceptance evidence is “The stakeholder register includes regulators, influence, expectations, and communication owners”.

D:

“Support signs off on runbooks, access, known issues, and service ownership” is evidence for a different source case: In a fictional CAPM project situation, a charity portal is being handed to support without runbooks or service-owner acceptance. Its related mechanism is: Finishing construction is not the same as transferring the deliverable to operations. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a regional policy project has many regulators, but the team records only the funding sponsor as stakeholder. The source-keyed acceptance evidence is “The stakeholder register includes regulators, influence, expectations, and communication owners”.

Question 384

In a fictional CAPM project situation, a town transit authority is building a new ticketing system while separately running daily ticket support; leadership calls both efforts projects. Which underlying project-management principle best explains the appropriate response?

  1. Projects create a unique outcome within a temporary effort; operations sustain repeatable service.
  2. A program coordinates related projects to realize benefits unavailable through isolated management.
  3. A portfolio groups investments for strategic management even when individual projects are unrelated.
  4. Stable requirements and costly late changes favor more upfront planning and control.

Explanation

Correct Answer

A:

The case turns on this distinction: Projects create a unique outcome within a temporary effort; operations sustain repeatable service. Consequently, the targeted action is: Classify the temporary ticket-system delivery as a project and recurring support as operations. This reasoning can be checked against: The charter has a finite system-delivery objective while support retains ongoing service metrics.

Incorrect Answers

B:

“A program coordinates related projects to realize benefits unavailable through isolated management” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a health network is coordinating a shared electronic-record program containing several interdependent hospital migrations. There the technical reason is: A program coordinates related projects to realize benefits unavailable through isolated management. In this question, the reported issue is: In a fictional CAPM project situation, a town transit authority is building a new ticketing system while separately running daily ticket support; leadership calls both efforts projects. The controlling principle is instead: Projects create a unique outcome within a temporary effort; operations sustain repeatable service.

C:

“A portfolio groups investments for strategic management even when individual projects are unrelated” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a retail board is comparing an unrelated warehouse expansion, loyalty application, and energy-efficiency upgrade to fund strategic priorities. There the technical reason is: A portfolio groups investments for strategic management even when individual projects are unrelated. In this question, the reported issue is: In a fictional CAPM project situation, a town transit authority is building a new ticketing system while separately running daily ticket support; leadership calls both efforts projects. The controlling principle is instead: Projects create a unique outcome within a temporary effort; operations sustain repeatable service.

D:

“Stable requirements and costly late changes favor more upfront planning and control” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a public agency has a fixed statutory records format and an approved construction-style deployment specification. There the technical reason is: Stable requirements and costly late changes favor more upfront planning and control. In this question, the reported issue is: In a fictional CAPM project situation, a town transit authority is building a new ticketing system while separately running daily ticket support; leadership calls both efforts projects. The controlling principle is instead: Projects create a unique outcome within a temporary effort; operations sustain repeatable service.

Question 385

In a fictional CAPM project situation, a community portal feature is labeled complete although acceptance tests show keyboard-only navigation fails. Which underlying project-management principle best explains the appropriate response?

  1. A completed backlog alone may not prove coverage of all obligations.
  2. High-risk unaccepted defects invalidate readiness even if most features are complete.
  3. Acceptance depends on meeting agreed criteria, not development status alone.
  4. A requirement is not verified by testing a different actor's workflow.

Explanation

Correct Answer

C:

The case turns on this distinction: Acceptance depends on meeting agreed criteria, not development status alone. Consequently, the targeted action is: Do not accept the feature until the accessibility criterion passes or an authorized exception is recorded. This reasoning can be checked against: The acceptance report documents keyboard navigation results and disposition.

Incorrect Answers

A:

“A completed backlog alone may not prove coverage of all obligations” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a payment modernization release has all stories marked Done, but one mandated reconciliation requirement has no test result. There the technical reason is: A completed backlog alone may not prove coverage of all obligations. In this question, the reported issue is: In a fictional CAPM project situation, a community portal feature is labeled complete although acceptance tests show keyboard-only navigation fails. The controlling principle is instead: Acceptance depends on meeting agreed criteria, not development status alone.

B:

“High-risk unaccepted defects invalidate readiness even if most features are complete” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a clinic schedules go-live despite an unresolved high-severity medication data mapping defect. There the technical reason is: High-risk unaccepted defects invalidate readiness even if most features are complete. In this question, the reported issue is: In a fictional CAPM project situation, a community portal feature is labeled complete although acceptance tests show keyboard-only navigation fails. The controlling principle is instead: Acceptance depends on meeting agreed criteria, not development status alone.

D:

“A requirement is not verified by testing a different actor's workflow” describes the principle relevant to this other source scenario: In a fictional CAPM project situation, a school enrollment system is tested only with administrator accounts; guardian workflows are unverified. There the technical reason is: A requirement is not verified by testing a different actor's workflow. In this question, the reported issue is: In a fictional CAPM project situation, a community portal feature is labeled complete although acceptance tests show keyboard-only navigation fails. The controlling principle is instead: Acceptance depends on meeting agreed criteria, not development status alone.

Question 386

In a fictional CAPM project situation, a project has a weekly executive dashboard but changes the status color to green to avoid concern. What evidence would most directly demonstrate that the appropriate response was effective?

  1. An approved plan defines baseline consumption, target, and measurement period.
  2. Updated requirements and decision records document scope and risk changes.
  3. Risk records include measurable thresholds, response owner, and activation steps.
  4. The dashboard agrees with underlying schedule, cost, and risk evidence.

Explanation

Correct Answer

D:

The specified evidence tests the exact improvement at issue: The dashboard agrees with underlying schedule, cost, and risk evidence. It supports the chosen response (report the accurate status and corrective forecast using the approved reporting rules.) rather than merely recording activity. The principle is: Communication plans do not justify distorting performance information.

Incorrect Answers

A:

“An approved plan defines baseline consumption, target, and measurement period” is evidence for a different source case: In a fictional CAPM project situation, a campus building project has promised energy savings, but baseline utility consumption was never captured. Its related mechanism is: Benefits realization requires comparing observed outcomes with a valid baseline. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a project has a weekly executive dashboard but changes the status color to green to avoid concern. The source-keyed acceptance evidence is “The dashboard agrees with underlying schedule, cost, and risk evidence”.

B:

“Updated requirements and decision records document scope and risk changes” is evidence for a different source case: In a fictional CAPM project situation, a security team receives new data residency requirements after project authorization. Its related mechanism is: New external constraints can alter the project business case and obligations. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a project has a weekly executive dashboard but changes the status color to green to avoid concern. The source-keyed acceptance evidence is “The dashboard agrees with underlying schedule, cost, and risk evidence”.

C:

“Risk records include measurable thresholds, response owner, and activation steps” is evidence for a different source case: In a fictional CAPM project situation, a logistics project lists a high-impact delay risk and assigns a workaround but omits a trigger. Its related mechanism is: A vague contingency cannot be applied consistently under pressure. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a project has a weekly executive dashboard but changes the status color to green to avoid concern. The source-keyed acceptance evidence is “The dashboard agrees with underlying schedule, cost, and risk evidence”.

Question 387

In a fictional CAPM project situation, a museum wants reactions to a proposed visitor experience before the requirements are finalized. Which continuing control would most directly reduce the chance of this problem recurring?

  1. Use explicit workshop rules and a transparent selection method.
  2. Triangulate findings with observations or broader measures before major decisions.
  3. Offer private feedback paths and protect contributor anonymity where needed.
  4. Separate divergent idea creation from convergent evidence-based selection.

Explanation

Correct Answer

B:

This ongoing practice maintains the improvement: Triangulate findings with observations or broader measures before major decisions. It follows the targeted action (conduct a moderated focus group with representative visitors and open questions.) and provides a way to catch recurrence. The underlying principle is: Focus groups explore perceptions; they are not a statistically representative vote.

Incorrect Answers

A:

“Use explicit workshop rules and a transparent selection method” addresses recurrence of another problem: In a fictional CAPM project situation, a team brainstorms solutions for recurring late shipments while one manager immediately rejects every suggestion. That problem depends on: This ongoing practice maintains the improvement: Use explicit workshop rules and a transparent selection method. The recurring risk here is: In a fictional CAPM project situation, a museum wants reactions to a proposed visitor experience before the requirements are finalized. The more targeted safeguard is “Triangulate findings with observations or broader measures before major decisions” because this ongoing practice maintains the improvement: Triangulate findings with observations or broader measures before major decisions.

C:

“Offer private feedback paths and protect contributor anonymity where needed” addresses recurrence of another problem: In a fictional CAPM project situation, a team uses a large open workshop to gather private feedback about conflicts with a supervisor. That problem depends on: This ongoing practice maintains the improvement: Offer private feedback paths and protect contributor anonymity where needed. The recurring risk here is: In a fictional CAPM project situation, a museum wants reactions to a proposed visitor experience before the requirements are finalized. The more targeted safeguard is “Triangulate findings with observations or broader measures before major decisions” because this ongoing practice maintains the improvement: Triangulate findings with observations or broader measures before major decisions.

D:

“Separate divergent idea creation from convergent evidence-based selection” addresses recurrence of another problem: In a fictional CAPM project situation, a workshop is producing many ideas but no decision on which root cause drives customer complaints. That problem depends on: This ongoing practice maintains the improvement: Separate divergent idea creation from convergent evidence-based selection. The recurring risk here is: In a fictional CAPM project situation, a museum wants reactions to a proposed visitor experience before the requirements are finalized. The more targeted safeguard is “Triangulate findings with observations or broader measures before major decisions” because this ongoing practice maintains the improvement: Triangulate findings with observations or broader measures before major decisions.

Question 388

In a fictional CAPM project situation, a production defect blocks payment while a low-risk enhancement is in progress. What evidence would most directly demonstrate that the appropriate response was effective?

  1. More items meet Done, and work aging falls within the iteration.
  2. Test, integration, and agreed documentation evidence satisfy Done.
  3. The visible backlog records the mandatory security constraint and its release gate.
  4. The visible backlog shows documented risk-based ordering and resolved payment flow.

Explanation

Correct Answer

D:

The specified evidence tests the exact improvement at issue: The visible backlog shows documented risk-based ordering and resolved payment flow. It supports the chosen response (use the emergency work policy to prioritize the payment blocker and coordinate capacity.) rather than merely recording activity. The principle is: Urgent harmful defects may outrank optional features when impact is high.

Incorrect Answers

A:

“More items meet Done, and work aging falls within the iteration” is evidence for a different source case: In a fictional CAPM project situation, a team repeatedly starts five items and completes none during an iteration. Its related mechanism is: Starting work does not create the same usable value as completing it. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a production defect blocks payment while a low-risk enhancement is in progress. The source-keyed acceptance evidence is “The visible backlog shows documented risk-based ordering and resolved payment flow”.

B:

“Test, integration, and agreed documentation evidence satisfy Done” is evidence for a different source case: In a fictional CAPM project situation, a team accepts vague stories as complete when only code is written, excluding documentation and testing. Its related mechanism is: Partial implementation does not meet the agreed quality bar. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a production defect blocks payment while a low-risk enhancement is in progress. The source-keyed acceptance evidence is “The visible backlog shows documented risk-based ordering and resolved payment flow”.

C:

“The visible backlog records the mandatory security constraint and its release gate” is evidence for a different source case: In a fictional CAPM project situation, a health-tech team defers critical data-protection work because its short-term story value score is lower than a new theme. Its related mechanism is: Risk and compliance constraints are not interchangeable with cosmetic feature value. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, a production defect blocks payment while a low-risk enhancement is in progress. The source-keyed acceptance evidence is “The visible backlog shows documented risk-based ordering and resolved payment flow”.

Question 389

In a fictional CAPM project situation, a digital archive project has a release slot nearly full and receives another low-priority enhancement request. Which continuing control would most directly reduce the chance of this problem recurring?

  1. Maintain a capacity-aware rolling release forecast.
  2. Review compliance dependencies before committing release announcements.
  3. Review roadmap assumptions and market signals at regular intervals.
  4. Check mandatory controls at release readiness reviews.

Explanation

Correct Answer

A:

This ongoing practice maintains the improvement: Maintain a capacity-aware rolling release forecast. It follows the targeted action (evaluate the enhancement against value, capacity, and dependencies before assigning a release.) and provides a way to catch recurrence. The underlying principle is: A requested feature does not become a commitment until trade-offs are evaluated.

Incorrect Answers

B:

“Review compliance dependencies before committing release announcements” addresses recurrence of another problem: In a fictional CAPM project situation, a retail service product's roadmap lists a loyalty launch before its customer-consent mechanism has regulatory approval. That problem depends on: This ongoing practice maintains the improvement: Review compliance dependencies before committing release announcements. The recurring risk here is: In a fictional CAPM project situation, a digital archive project has a release slot nearly full and receives another low-priority enhancement request. The more targeted safeguard is “Maintain a capacity-aware rolling release forecast” because this ongoing practice maintains the improvement: Maintain a capacity-aware rolling release forecast.

C:

“Review roadmap assumptions and market signals at regular intervals” addresses recurrence of another problem: In a fictional CAPM project situation, a customer platform roadmap lists exact developer tasks for the next two years and leaves no room for changing demand. That problem depends on: This ongoing practice maintains the improvement: Review roadmap assumptions and market signals at regular intervals. The recurring risk here is: In a fictional CAPM project situation, a digital archive project has a release slot nearly full and receives another low-priority enhancement request. The more targeted safeguard is “Maintain a capacity-aware rolling release forecast” because this ongoing practice maintains the improvement: Maintain a capacity-aware rolling release forecast.

D:

“Check mandatory controls at release readiness reviews” addresses recurrence of another problem: In a fictional CAPM project situation, a warehouse app has a mandatory privacy control and optional dashboard charts slated for the same release. That problem depends on: This ongoing practice maintains the improvement: Check mandatory controls at release readiness reviews. The recurring risk here is: In a fictional CAPM project situation, a digital archive project has a release slot nearly full and receives another low-priority enhancement request. The more targeted safeguard is “Maintain a capacity-aware rolling release forecast” because this ongoing practice maintains the improvement: Maintain a capacity-aware rolling release forecast.

Question 390

In a fictional CAPM project situation, an archive migration has two parallel paths: P 3d then Q 8d; P 3d then R 5d; both require S 4d. What evidence would most directly demonstrate that the appropriate response was effective?

  1. SPI equals 0.70 using the same effort-value units.
  2. The long path totals 3+8+4=15 days; the other totals 3+5+4=12.
  3. The cost variance report shows positive $5,000.
  4. The report shows EV−PV = −50,000 and EV−AC = −30,000.

Explanation

Correct Answer

B:

The specified evidence tests the exact improvement at issue: The long path totals 3+8+4=15 days; the other totals 3+5+4=12. It supports the chosen response (set the earliest network completion at 15 days along P-Q-S.) rather than merely recording activity. The principle is: The longest dependent route controls completion in an unconstrained network.

Incorrect Answers

A:

“SPI equals 0.70 using the same effort-value units” is evidence for a different source case: In a fictional CAPM project situation, a campus lighting installation plans 90 days of effort value by the checkpoint but has earned only 63 equivalent days. Its related mechanism is: Earned work is only 70% of planned work in earned-value terms. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, an archive migration has two parallel paths: P 3d then Q 8d; P 3d then R 5d; both require S 4d. The source-keyed acceptance evidence is “The long path totals 3+8+4=15 days; the other totals 3+5+4=12”.

C:

“The cost variance report shows positive $5,000” is evidence for a different source case: In a fictional CAPM project situation, a research laboratory has $55,000 earned value and $50,000 actual cost at the same data date. Its related mechanism is: The team earned more budgeted value than it spent, absent quality or scope omissions. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, an archive migration has two parallel paths: P 3d then Q 8d; P 3d then R 5d; both require S 4d. The source-keyed acceptance evidence is “The long path totals 3+8+4=15 days; the other totals 3+5+4=12”.

D:

“The report shows EV−PV = −50,000 and EV−AC = −30,000” is evidence for a different source case: In a fictional CAPM project situation, a roadworks team has PV $200,000, EV $150,000, and AC $180,000 at a review. Its related mechanism is: The project is behind planned value and over the budgeted cost of work performed. That observation would not directly verify this question’s condition: In a fictional CAPM project situation, an archive migration has two parallel paths: P 3d then Q 8d; P 3d then R 5d; both require S 4d. The source-keyed acceptance evidence is “The long path totals 3+8+4=15 days; the other totals 3+5+4=12”.