Question 140
At the Brookfield infrastructure service operator, a design connects second-tier managed switches via arbitrary edge ports with no planned inter-switch traffic paths. How should the organization sustain the improvement?
Explanation
Correct Answer
The needed prevention is to review uplink capacity and discovery state after topology expansion. It directly sustains the original change to design a supported two-tier FortiLink topology with correct uplink roles and authorization order.
Incorrect Answers
The suggested preventive check is: Monitor MCLAG peer and ICL status during maintenance. Its technical scope concerns: Multi-chassis aggregation cannot function properly without coordinated peer state and ICL connectivity. This question asks how to sustain control over: Multi-tier switch management requires deliberate forwarding and discovery relationships between tiers. The more targeted safeguard is: Review uplink capacity and discovery state after topology expansion.
Audit MST instance mapping when VLANs are added. That safeguard would help prevent recurrence of: One spanning tree forwarding topology cannot distribute different VLAN groups over selected independent paths. The risk being reviewed here is instead: Multi-tier switch management requires deliberate forwarding and discovery relationships between tiers. The matching ongoing control is: Review uplink capacity and discovery state after topology expansion.
That routine supports untagged vlan egress expectation, but the relevant ongoing risk requires the team to review uplink capacity and discovery state after topology expansion. For the Brookfield infrastructure service operator, the direct corrective action is to design a supported two-tier FortiLink topology with correct uplink roles and authorization order.