Question 840
At the Brookfield network modernization program, many managed switches become unreachable simultaneously despite working physical links and IP addresses. Which ongoing control best prevents this issue from recurring?
Explanation
Correct Answer
The needed prevention is to monitor switch-controller process health and FortiLink sessions. It directly sustains the original change to inspect FortiGate switch-controller service logs and management state before resetting every switch.
Incorrect Answers
That routine supports fortilink mclag peer degradation, but the relevant ongoing risk requires the team to monitor switch-controller process health and FortiLink sessions. For the Brookfield network modernization program, the direct corrective action is to inspect FortiGate switch-controller service logs and management state before resetting every switch.
Include EAPOL trace validation in wired-authentication incident templates is not the primary recurring safeguard for this problem. The team should monitor switch-controller process health and FortiLink sessions. For the Brookfield network modernization program, the direct corrective action is to inspect FortiGate switch-controller service logs and management state before resetting every switch.
Check trusted NTP status before distributed capture sessions. That safeguard would help prevent recurrence of: Unsynchronized device clocks can make a correct event sequence appear contradictory. The risk being reviewed here is instead: A shared controller service problem can affect several managed devices at once. The matching ongoing control is: Monitor switch-controller process health and FortiLink sessions.