McAfee Secure

Exam Code: H12-821

Exam Name: HCIP-Datacom-Core Technology V1.0

Certification Provider: Huawei

Huawei H12-821 Questions & Answers

Study with Up-To-Date REAL Exam Questions and Answers from the ACTUAL Test

471 Questions & Answers with Testing Engine

"HCIP-Datacom-Core Technology V1.0 Exam", also known as H12-821 exam, is a Huawei certification exam.

Pass your tests with the always up-to-date H12-821 Exam Engine. Your H12-821 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Huawei H12-821 Practice Test 49

Question 480

At fictional Granite Logistics, a network engineer supporting warehouse distribution is reviewing IGMP and PIM multicast distribution during a production cutover (HCIP-H12-821-MULTICAST-120). The observed network issue is: A multicast router sees no group receivers because IGMP query messages are absent from a VLAN. Which observation most directly verifies that the corrective change succeeded?

  1. Client memberships are refreshed and multicast packets reach subscribed hosts.
  2. Packets arrive on the expected RPF interface and are forwarded downstream.
  3. Only intended receivers for each service group see the correct media flow.
  4. Stream traffic is limited to known interested ports and any required router-facing links.

Explanation

Correct Answer

A:

The best verification observation is: Client memberships are refreshed and multicast packets reach subscribed hosts. It demonstrates the corrective action: Restore an appropriate IGMP querier and group-report exchange on the segment. This fits the principle: IGMP uses membership queries and reports to maintain receiver state. Verify on the actual Huawei platform and network release.

Incorrect Answers

B:

“Packets arrive on the expected RPF interface and are forwarded downstream” responds to another technical or business failure: A multicast forwarding entry receives traffic from a source on the wrong interface and drops it. That source case depends on: The best verification observation is: Packets arrive on the expected RPF interface and are forwarded downstream. The present issue is: A multicast router sees no group receivers because IGMP query messages are absent from a VLAN. The more direct action is “Client memberships are refreshed and multicast packets reach subscribed hosts” because the best verification observation is: Client memberships are refreshed and multicast packets reach subscribed hosts.

C:

“Only intended receivers for each service group see the correct media flow” responds to another technical or business failure: Multicast packets arrive at the wrong group because the sender application uses a group address overlapping another service. That source case depends on: The best verification observation is: Only intended receivers for each service group see the correct media flow. The present issue is: A multicast router sees no group receivers because IGMP query messages are absent from a VLAN. The more direct action is “Client memberships are refreshed and multicast packets reach subscribed hosts” because the best verification observation is: Client memberships are refreshed and multicast packets reach subscribed hosts.

D:

“Stream traffic is limited to known interested ports and any required router-facing links” responds to another technical or business failure: A receiver sends IGMP membership reports but the local VLAN switch floods the multicast group to every port. That source case depends on: The best verification observation is: Stream traffic is limited to known interested ports and any required router-facing links. The present issue is: A multicast router sees no group receivers because IGMP query messages are absent from a VLAN. The more direct action is “Client memberships are refreshed and multicast packets reach subscribed hosts” because the best verification observation is: Client memberships are refreshed and multicast packets reach subscribed hosts.

Question 481

At fictional Riverstone Travel, a network engineer supporting booking offices is reviewing IS-IS level-aware topology and database synchronization during a new network integration (HCIP-H12-821-ISIS-121). The observed network issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. Which observation most directly verifies that the corrective change succeeded?

  1. An eligible Level 1 neighbor forms in the expected common area.
  2. The elected DIS originates the expected pseudonode and other routers form correct LAN adjacencies.
  3. The link establishes a valid Level 2 adjacency and exchanges the permitted routes.
  4. Adjacent routers converge on consistent current LSP contents and route tables.

Explanation

Correct Answer

A:

The best verification observation is: An eligible Level 1 neighbor forms in the expected common area. It demonstrates the corrective action: Align the intended IS-IS area identifiers or establish a deliberate Level 2 relationship. This fits the principle: IS-IS Level 1 adjacency requires compatible area membership. Verify on the actual Huawei platform and network release.

Incorrect Answers

B:

“The elected DIS originates the expected pseudonode and other routers form correct LAN adjacencies” responds to another technical or business failure: An IS-IS router is elected designated intermediate system on an Ethernet segment but an engineer calls it an OSPF DR. That source case depends on: The best verification observation is: The elected DIS originates the expected pseudonode and other routers form correct LAN adjacencies. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “An eligible Level 1 neighbor forms in the expected common area” because the best verification observation is: An eligible Level 1 neighbor forms in the expected common area.

C:

“The link establishes a valid Level 2 adjacency and exchanges the permitted routes” responds to another technical or business failure: Two Level 2 IS-IS routers do not form neighbors because one interface is configured for Level 1-only adjacencies. That source case depends on: The best verification observation is: The link establishes a valid Level 2 adjacency and exchanges the permitted routes. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “An eligible Level 1 neighbor forms in the expected common area” because the best verification observation is: An eligible Level 1 neighbor forms in the expected common area.

D:

“Adjacent routers converge on consistent current LSP contents and route tables” responds to another technical or business failure: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. That source case depends on: The best verification observation is: Adjacent routers converge on consistent current LSP contents and route tables. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “An eligible Level 1 neighbor forms in the expected common area” because the best verification observation is: An eligible Level 1 neighbor forms in the expected common area.

Question 482

At fictional Riverstone Travel, a network engineer supporting booking offices is reviewing IS-IS level-aware topology and database synchronization during a new network integration (HCIP-H12-821-ISIS-121). The observed network issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. Which ongoing preventive or detective control would best reduce recurrence?

  1. Validate system IDs across a network before enabling IS-IS.
  2. Label protocol-specific LAN election roles in troubleshooting diagrams.
  3. Inventory interface and process authentication before planned key rotation.
  4. Check NET area fields before deploying local IS-IS peering.

Explanation

Correct Answer

D:

The preventive or detective safeguard is: Check NET area fields before deploying local IS-IS peering. This directly addresses the recurring fault: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The corrective action would be: Align the intended IS-IS area identifiers or establish a deliberate Level 2 relationship. Success is demonstrated when: An eligible Level 1 neighbor forms in the expected common area.

Incorrect Answers

A:

“Validate system IDs across a network before enabling IS-IS” addresses recurrence of another problem: An IS-IS configuration reuses one system ID on two distinct routers and link-state advertisements become ambiguous. That problem depends on: The preventive or detective safeguard is: Validate system IDs across a network before enabling IS-IS. The recurring risk here is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more targeted safeguard is “Check NET area fields before deploying local IS-IS peering” because the preventive or detective safeguard is: Check NET area fields before deploying local IS-IS peering.

B:

“Label protocol-specific LAN election roles in troubleshooting diagrams” addresses recurrence of another problem: An IS-IS router is elected designated intermediate system on an Ethernet segment but an engineer calls it an OSPF DR. That problem depends on: The preventive or detective safeguard is: Label protocol-specific LAN election roles in troubleshooting diagrams. The recurring risk here is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more targeted safeguard is “Check NET area fields before deploying local IS-IS peering” because the preventive or detective safeguard is: Check NET area fields before deploying local IS-IS peering.

C:

“Inventory interface and process authentication before planned key rotation” addresses recurrence of another problem: An IS-IS adjacency repeatedly resets because neighboring devices use incompatible authentication settings. That problem depends on: The preventive or detective safeguard is: Inventory interface and process authentication before planned key rotation. The recurring risk here is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more targeted safeguard is “Check NET area fields before deploying local IS-IS peering” because the preventive or detective safeguard is: Check NET area fields before deploying local IS-IS peering.

Question 483

At fictional Riverstone Travel, a network engineer supporting booking offices is reviewing IS-IS level-aware topology and database synchronization during a new network integration (HCIP-H12-821-ISIS-121). The observed network issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. Which routing, switching, or network principle best explains the appropriate solution?

  1. An IS-IS neighbor relationship alone does not guarantee every network prefix is advertised.
  2. IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.
  3. IS-IS Level 1 adjacency requires compatible area membership.
  4. IS-IS Level 1 routing has area-local visibility and relies on Level 2 interarea reachability.

Explanation

Correct Answer

C:

The governing principle is: IS-IS Level 1 adjacency requires compatible area membership. In this scenario, the appropriate action is: Align the intended IS-IS area identifiers or establish a deliberate Level 2 relationship. Valid evidence would show: An eligible Level 1 neighbor forms in the expected common area.

Incorrect Answers

A:

“An IS-IS neighbor relationship alone does not guarantee every network prefix is advertised” responds to another technical or business failure: An IS-IS neighbor forms correctly but the expected IPv4 destination never appears in downstream route tables. That source case depends on: An IS-IS neighbor relationship alone does not guarantee every network prefix is advertised. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “IS-IS Level 1 adjacency requires compatible area membership” because IS-IS Level 1 adjacency requires compatible area membership.

B:

“IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements” responds to another technical or business failure: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. That source case depends on: IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “IS-IS Level 1 adjacency requires compatible area membership” because IS-IS Level 1 adjacency requires compatible area membership.

D:

“IS-IS Level 1 routing has area-local visibility and relies on Level 2 interarea reachability” responds to another technical or business failure: A Level 1-only router cannot reach an IP prefix advertised only outside its local IS-IS area. That source case depends on: IS-IS Level 1 routing has area-local visibility and relies on Level 2 interarea reachability. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “IS-IS Level 1 adjacency requires compatible area membership” because IS-IS Level 1 adjacency requires compatible area membership.

Question 484

At fictional Riverstone Travel, a network engineer supporting booking offices is reviewing IS-IS level-aware topology and database synchronization during a new network integration (HCIP-H12-821-ISIS-121). The observed network issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. Which next engineering action best addresses the reported problem?

  1. Verify wide-metric support and configuration consistency across participating routers.
  2. Configure matching supported IS-IS Hello or LSP authentication parameters for the peering scope.
  3. Align the intended IS-IS area identifiers or establish a deliberate Level 2 relationship.
  4. Examine the L1/L2 router's attached-state behavior and desired inter-area default routing.

Explanation

Correct Answer

C:

The directly responsive action is: Align the intended IS-IS area identifiers or establish a deliberate Level 2 relationship. The specific reported fault is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. Confirmation should show: An eligible Level 1 neighbor forms in the expected common area. The supporting technical principle is: IS-IS Level 1 adjacency requires compatible area membership.

Incorrect Answers

A:

“Verify wide-metric support and configuration consistency across participating routers” responds to another technical or business failure: A large IS-IS deployment uses narrow metrics until a new path cost exceeds the legacy representable range. That source case depends on: IS-IS wide metrics extend usable cost representation for modern network designs. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “Align the intended IS-IS area identifiers or establish a deliberate Level 2 relationship” because IS-IS Level 1 adjacency requires compatible area membership.

B:

“Configure matching supported IS-IS Hello or LSP authentication parameters for the peering scope” responds to another technical or business failure: An IS-IS adjacency repeatedly resets because neighboring devices use incompatible authentication settings. That source case depends on: IS-IS routing integrity can require compatible authentication at the relevant PDU scope. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “Align the intended IS-IS area identifiers or establish a deliberate Level 2 relationship” because IS-IS Level 1 adjacency requires compatible area membership.

D:

“Examine the L1/L2 router's attached-state behavior and desired inter-area default routing” responds to another technical or business failure: An IS-IS Level 1 router gets an unwanted default path after an L1/L2 node reports reachability to other areas. That source case depends on: IS-IS attached-bit behavior can influence Level 1 routing toward other areas. The present issue is: Two Huawei routers share a link but their IS-IS NET addresses use different area identifiers while both are configured as Level 1. The more direct action is “Align the intended IS-IS area identifiers or establish a deliberate Level 2 relationship” because IS-IS Level 1 adjacency requires compatible area membership.

Question 485

At fictional Alder Community, a network engineer supporting regional administration is reviewing IS-IS level-aware topology and database synchronization during an intersite service activation (HCIP-H12-821-ISIS-122). The observed network issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. Which routing, switching, or network principle best explains the appropriate solution?

  1. IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.
  2. IS-IS wide metrics extend usable cost representation for modern network designs.
  3. IS-IS DIS elections are a broadcast-LAN behavior, not a point-to-point requirement.
  4. IS-IS LAN DIS behavior differs from OSPF designated-router adjacency handling.

Explanation

Correct Answer

A:

The governing principle is: IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements. In this scenario, the appropriate action is: Inspect LSP sequence numbers and use CSNP or PSNP synchronization mechanisms to repair the database. Valid evidence would show: Adjacent routers converge on consistent current LSP contents and route tables.

Incorrect Answers

B:

“IS-IS wide metrics extend usable cost representation for modern network designs” responds to another technical or business failure: A large IS-IS deployment uses narrow metrics until a new path cost exceeds the legacy representable range. That source case depends on: IS-IS wide metrics extend usable cost representation for modern network designs. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements” because IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.

C:

“IS-IS DIS elections are a broadcast-LAN behavior, not a point-to-point requirement” responds to another technical or business failure: An engineer expects every IS-IS point-to-point interface to elect a LAN designated intermediate system. That source case depends on: IS-IS DIS elections are a broadcast-LAN behavior, not a point-to-point requirement. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements” because IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.

D:

“IS-IS LAN DIS behavior differs from OSPF designated-router adjacency handling” responds to another technical or business failure: An IS-IS router is elected designated intermediate system on an Ethernet segment but an engineer calls it an OSPF DR. That source case depends on: IS-IS LAN DIS behavior differs from OSPF designated-router adjacency handling. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements” because IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.

Question 486

At fictional Alder Community, a network engineer supporting regional administration is reviewing IS-IS level-aware topology and database synchronization during an intersite service activation (HCIP-H12-821-ISIS-122). The observed network issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. Which next engineering action best addresses the reported problem?

  1. Examine the L1/L2 router's attached-state behavior and desired inter-area default routing.
  2. Align interface circuit-level settings with the intended Level 2 topology.
  3. Inspect LSP sequence numbers and use CSNP or PSNP synchronization mechanisms to repair the database.
  4. Assign each IS-IS node a unique stable system identifier within the domain.

Explanation

Correct Answer

C:

The directly responsive action is: Inspect LSP sequence numbers and use CSNP or PSNP synchronization mechanisms to repair the database. The specific reported fault is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. Confirmation should show: Adjacent routers converge on consistent current LSP contents and route tables. The supporting technical principle is: IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.

Incorrect Answers

A:

“Examine the L1/L2 router's attached-state behavior and desired inter-area default routing” responds to another technical or business failure: An IS-IS Level 1 router gets an unwanted default path after an L1/L2 node reports reachability to other areas. That source case depends on: IS-IS attached-bit behavior can influence Level 1 routing toward other areas. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “Inspect LSP sequence numbers and use CSNP or PSNP synchronization mechanisms to repair the database” because IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.

B:

“Align interface circuit-level settings with the intended Level 2 topology” responds to another technical or business failure: Two Level 2 IS-IS routers do not form neighbors because one interface is configured for Level 1-only adjacencies. That source case depends on: IS-IS adjacency level selection determines which databases neighbors can share. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “Inspect LSP sequence numbers and use CSNP or PSNP synchronization mechanisms to repair the database” because IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.

D:

“Assign each IS-IS node a unique stable system identifier within the domain” responds to another technical or business failure: An IS-IS configuration reuses one system ID on two distinct routers and link-state advertisements become ambiguous. That source case depends on: IS-IS identifies routing systems using unique system IDs. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “Inspect LSP sequence numbers and use CSNP or PSNP synchronization mechanisms to repair the database” because IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements.

Question 487

At fictional Alder Community, a network engineer supporting regional administration is reviewing IS-IS level-aware topology and database synchronization during an intersite service activation (HCIP-H12-821-ISIS-122). The observed network issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. Which observation most directly verifies that the corrective change succeeded?

  1. Adjacent routers converge on consistent current LSP contents and route tables.
  2. The required IPv4 prefix appears through the intended IS-IS route in the RIB and FIB.
  3. Access routers select the documented exit and no longer follow an accidental preferred attachment.
  4. The intended neighbors establish and databases synchronize without authentication errors.

Explanation

Correct Answer

A:

The best verification observation is: Adjacent routers converge on consistent current LSP contents and route tables. It demonstrates the corrective action: Inspect LSP sequence numbers and use CSNP or PSNP synchronization mechanisms to repair the database. This fits the principle: IS-IS database consistency relies on link-state PDU sequencing and flooding acknowledgements. Verify on the actual Huawei platform and network release.

Incorrect Answers

B:

“The required IPv4 prefix appears through the intended IS-IS route in the RIB and FIB” responds to another technical or business failure: An IS-IS neighbor forms correctly but the expected IPv4 destination never appears in downstream route tables. That source case depends on: The best verification observation is: The required IPv4 prefix appears through the intended IS-IS route in the RIB and FIB. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “Adjacent routers converge on consistent current LSP contents and route tables” because the best verification observation is: Adjacent routers converge on consistent current LSP contents and route tables.

C:

“Access routers select the documented exit and no longer follow an accidental preferred attachment” responds to another technical or business failure: An IS-IS Level 1 router gets an unwanted default path after an L1/L2 node reports reachability to other areas. That source case depends on: The best verification observation is: Access routers select the documented exit and no longer follow an accidental preferred attachment. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “Adjacent routers converge on consistent current LSP contents and route tables” because the best verification observation is: Adjacent routers converge on consistent current LSP contents and route tables.

D:

“The intended neighbors establish and databases synchronize without authentication errors” responds to another technical or business failure: An IS-IS adjacency repeatedly resets because neighboring devices use incompatible authentication settings. That source case depends on: The best verification observation is: The intended neighbors establish and databases synchronize without authentication errors. The present issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more direct action is “Adjacent routers converge on consistent current LSP contents and route tables” because the best verification observation is: Adjacent routers converge on consistent current LSP contents and route tables.

Question 488

At fictional Alder Community, a network engineer supporting regional administration is reviewing IS-IS level-aware topology and database synchronization during an intersite service activation (HCIP-H12-821-ISIS-122). The observed network issue is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. Which ongoing preventive or detective control would best reduce recurrence?

  1. Compare link-state databases after repeated topology changes.
  2. Test IS-IS PDU forwarding over new Ethernet interconnects.
  3. Include actual circuit topology and type in ISIS troubleshooting checks.
  4. Test default reachability from every Level 1 access area.

Explanation

Correct Answer

A:

The preventive or detective safeguard is: Compare link-state databases after repeated topology changes. This directly addresses the recurring fault: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The corrective action would be: Inspect LSP sequence numbers and use CSNP or PSNP synchronization mechanisms to repair the database. Success is demonstrated when: Adjacent routers converge on consistent current LSP contents and route tables.

Incorrect Answers

B:

“Test IS-IS PDU forwarding over new Ethernet interconnects” addresses recurrence of another problem: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. That problem depends on: The preventive or detective safeguard is: Test IS-IS PDU forwarding over new Ethernet interconnects. The recurring risk here is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more targeted safeguard is “Compare link-state databases after repeated topology changes” because the preventive or detective safeguard is: Compare link-state databases after repeated topology changes.

C:

“Include actual circuit topology and type in ISIS troubleshooting checks” addresses recurrence of another problem: An engineer expects every IS-IS point-to-point interface to elect a LAN designated intermediate system. That problem depends on: The preventive or detective safeguard is: Include actual circuit topology and type in ISIS troubleshooting checks. The recurring risk here is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more targeted safeguard is “Compare link-state databases after repeated topology changes” because the preventive or detective safeguard is: Compare link-state databases after repeated topology changes.

D:

“Test default reachability from every Level 1 access area” addresses recurrence of another problem: A Level 1-only router cannot reach an IP prefix advertised only outside its local IS-IS area. That problem depends on: The preventive or detective safeguard is: Test default reachability from every Level 1 access area. The recurring risk here is: An IS-IS area contains conflicting LSP versions after connectivity flaps and routers disagree about routes. The more targeted safeguard is “Compare link-state databases after repeated topology changes” because the preventive or detective safeguard is: Compare link-state databases after repeated topology changes.

Question 489

At fictional Harbor Media, a network engineer supporting streaming networks is reviewing IS-IS level-aware topology and database synchronization during a lab-to-production acceptance (HCIP-H12-821-ISIS-123). The observed network issue is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. Which observation most directly verifies that the corrective change succeeded?

  1. The required IPv4 prefix appears through the intended IS-IS route in the RIB and FIB.
  2. Access routers select the documented exit and no longer follow an accidental preferred attachment.
  3. Link-state packets carry supported larger metrics and computed paths match design.
  4. Neighbor Hellos are received and the intended adjacency reaches Up.

Explanation

Correct Answer

D:

The best verification observation is: Neighbor Hellos are received and the intended adjacency reaches Up. It demonstrates the corrective action: Permit the appropriate IS-IS link-layer PDUs and check physical segment connectivity. This fits the principle: IS-IS exchanges routing PDUs directly over the link rather than using ordinary IP multicast transport. Verify on the actual Huawei platform and network release.

Incorrect Answers

A:

“The required IPv4 prefix appears through the intended IS-IS route in the RIB and FIB” responds to another technical or business failure: An IS-IS neighbor forms correctly but the expected IPv4 destination never appears in downstream route tables. That source case depends on: The best verification observation is: The required IPv4 prefix appears through the intended IS-IS route in the RIB and FIB. The present issue is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. The more direct action is “Neighbor Hellos are received and the intended adjacency reaches Up” because the best verification observation is: Neighbor Hellos are received and the intended adjacency reaches Up.

B:

“Access routers select the documented exit and no longer follow an accidental preferred attachment” responds to another technical or business failure: An IS-IS Level 1 router gets an unwanted default path after an L1/L2 node reports reachability to other areas. That source case depends on: The best verification observation is: Access routers select the documented exit and no longer follow an accidental preferred attachment. The present issue is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. The more direct action is “Neighbor Hellos are received and the intended adjacency reaches Up” because the best verification observation is: Neighbor Hellos are received and the intended adjacency reaches Up.

C:

“Link-state packets carry supported larger metrics and computed paths match design” responds to another technical or business failure: A large IS-IS deployment uses narrow metrics until a new path cost exceeds the legacy representable range. That source case depends on: The best verification observation is: Link-state packets carry supported larger metrics and computed paths match design. The present issue is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. The more direct action is “Neighbor Hellos are received and the intended adjacency reaches Up” because the best verification observation is: Neighbor Hellos are received and the intended adjacency reaches Up.

Question 490

At fictional Harbor Media, a network engineer supporting streaming networks is reviewing IS-IS level-aware topology and database synchronization during a lab-to-production acceptance (HCIP-H12-821-ISIS-123). The observed network issue is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. Which next engineering action best addresses the reported problem?

  1. Inspect the IS-IS DIS election and pseudonode LSP roles instead of applying OSPF DR rules.
  2. Examine the L1/L2 router's attached-state behavior and desired inter-area default routing.
  3. Align interface circuit-level settings with the intended Level 2 topology.
  4. Permit the appropriate IS-IS link-layer PDUs and check physical segment connectivity.

Explanation

Correct Answer

D:

The directly responsive action is: Permit the appropriate IS-IS link-layer PDUs and check physical segment connectivity. The specific reported fault is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. Confirmation should show: Neighbor Hellos are received and the intended adjacency reaches Up. The supporting technical principle is: IS-IS exchanges routing PDUs directly over the link rather than using ordinary IP multicast transport.

Incorrect Answers

A:

“Inspect the IS-IS DIS election and pseudonode LSP roles instead of applying OSPF DR rules” responds to another technical or business failure: An IS-IS router is elected designated intermediate system on an Ethernet segment but an engineer calls it an OSPF DR. That source case depends on: IS-IS LAN DIS behavior differs from OSPF designated-router adjacency handling. The present issue is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. The more direct action is “Permit the appropriate IS-IS link-layer PDUs and check physical segment connectivity” because IS-IS exchanges routing PDUs directly over the link rather than using ordinary IP multicast transport.

B:

“Examine the L1/L2 router's attached-state behavior and desired inter-area default routing” responds to another technical or business failure: An IS-IS Level 1 router gets an unwanted default path after an L1/L2 node reports reachability to other areas. That source case depends on: IS-IS attached-bit behavior can influence Level 1 routing toward other areas. The present issue is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. The more direct action is “Permit the appropriate IS-IS link-layer PDUs and check physical segment connectivity” because IS-IS exchanges routing PDUs directly over the link rather than using ordinary IP multicast transport.

C:

“Align interface circuit-level settings with the intended Level 2 topology” responds to another technical or business failure: Two Level 2 IS-IS routers do not form neighbors because one interface is configured for Level 1-only adjacencies. That source case depends on: IS-IS adjacency level selection determines which databases neighbors can share. The present issue is: IS-IS adjacency remains Down when Hello frames are filtered by an intermediate layer-2 device. The more direct action is “Permit the appropriate IS-IS link-layer PDUs and check physical segment connectivity” because IS-IS exchanges routing PDUs directly over the link rather than using ordinary IP multicast transport.